• Title/Summary/Keyword: 공정 관리

Search Result 2,766, Processing Time 0.03 seconds

Establishing a Early Warning System using Multivariate Control Charts in Melting Process (용해공정에서 다변량 관리도를 이용한 조기경보시스템 구축)

  • Lee, Hoe-Sik;Lee, Myung-Joo;Han, Dae-Hee
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.4
    • /
    • pp.201-207
    • /
    • 2007
  • In some manufacturing industries, there are many situation in which the simultaneous monitoring or control of two or more related quality characteristics is necessary. However, monitoring these two or more related quality characteristics independently can be very misleading. When several characteristics of manufactured component are to be monitored simultaneously, multivariate $x^2$ or $T^2$ control chart can be used. In this paper, establishing a early warning system(EWS) using multivariate control charts to analyze early out-of-control signals in melting process with many quality characteristics was presented. This module which we developed to control several characteristics improved efficiency and effectiveness of process control in the melting process.

  • PDF

A study on the Human Resource Management through Application of Daily Scheduling Check System (일일 공정 Check System을 활용한 인력관리 사례 연구)

  • Park Chan-Jeong;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.124-132
    • /
    • 2004
  • A human resource management of the general contractors is to mostly deal with daily input by each subcontractor in construction fields. However, this way has some limitations; the identification of proper human-input and productivity, preventive activities or efforts for minimizing schedule delay. The reason why these limitations are that few systematic efforts through a coordinated field administration with the construction schedule planning and human resources. Therefore, on the basis of the construction schedule planning, human resource management of subcontractors is necessary to make for an improvement in construction schedule control. Daily Scheduling Check System(DSCS), as the linked human resources on an existed CPM scheduling software, was developed and this paper then verified validity and effectiveness of using the DSCS for the framework of some actual apartment construction projects

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

Automation of Construction Management System for Bridge Construction Site (교량 건설현장의 시공관리 자동화 기술 연구)

  • Lee, Kee Sei;Choi, Jun Ho;Jiang, Meiling;Kang, Young Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.164-164
    • /
    • 2011
  • 최근들어 교량 건설 프로젝트는 그 규모가 방대해 졌을 뿐만아니라, 건설에 사용되는 장비 및 자재, 인력의 종류 또한 다양해 지고 있다. 이에 따라 종래 구조적 안전만을 추구하던 건설현장은 이러한 제반 요소들을 효율적으로 관리하여 경제성뿐만 아니라 시공의 효율성 까지 고려할 수밖에 없게 되었다. 따라서 건설 현장의 진도 및 자재, 인력관리는 현대 건설 산업의 주요 과제라 할 수 있다. 이에 따라 본 연구에서는 현장의 시공정보를 무선으로 송신할 수 있는 단말기 및 RFID를 이용하여 종래에 시행되던 작업을 자동화함으로써 작업의 편리성을 도모하고 이를 통하여 시간과 인력의 낭비를 줄일 수 있는 시공관리 시스템에 대한 모듈을 제안 하였다. 제안된 시스템은 3D모델을 기반으로 하여 진도 및 공비를 한눈에 알아볼 수 있는 방안을 제시한다. 사용자는 현재 진행되고 있는 공정을 3차원 모델에서 확인할 수 있으며, 현재까지 사용된 비용 및 공정률을 손쉽게 확인할 수 있다. 3D모델은 공사 시작 전 공정에 맞추어 분절된 형태로 제작되어 현장에서 송신한 위치정보가 통합관리 시스템에서 수신되면 해당 새그가 화면에 나타나게 된다. 3D모델은 공정시각화의 역할을 할 뿐만 아니라 각 새그에는 사용된 자재의 종류나 수량등이 DB화 되어 있어, 실시간으로 공사에 사용된 물량을 산출 할수 있도록 한다. 시공정보의 수신은 각 자재에 부착한 RFID태그를 직접 읽어서 송신하거나, 작업자가 시공상황을 단말기를 통하여 직점 송신함으로써 이루어지게 된다. 수집된 시공정보는 3D모델과 연계됨과 동시에 통합관리 시스템에 내장된 DB와 연결되어 사용 자재 및 물량에 대한 비용산출에 중요한 역할을 하게 된다. 현재 우리나라의 교량 시공 현장에서는 기성청구시 내역서를 기준으로 비용을 산정하게 되는데, 시공관리 통합 프로그램에서는 각 공정이 DB화된 내역서와 연계되어 3D모델에서 얻어진 물량으로 공비를 산출하는 과정이 자동으로 이루어지게 된다. 이러한 과정은 단일 현장뿐만 아니라, 공구 내의 여러 교량 현장에 대하여도 적용이 가능하므로, 방대한 현장의 공사관리에 소요되던 시간과 노력을 절감 할 수 있다. 본 연구를 통하여 현장에서 이루어지는 공사관리 작업에 대해 IT기술을 접목하여 자동화 할 수 있는 방법에 대한 알고리즘을 제시하였다. 이는 모바일 오피스 및 단말기를 이용하여 현 공정까지 사용된 물량, 인력, 장비 정보를 관리하는 한편, 현재까지 진행된 공사 내용을 3D모델을 통하여 한눈에 알아볼수 있는 교량 건설현장 통합관리 시스템의 모듈을 제공한다. 이에따라 공무 작업에 소모되는 인력 및 시간을 크게 절약 할 수 있을 것이라 판단된다.

  • PDF

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

중대산업사고 예방을 위한 종합위험관리체제(IRMS) 구축에 관한 연구

  • 성대현;김재현;권혁면;임대식;김기영
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.10a
    • /
    • pp.48-53
    • /
    • 2003
  • 화학산업의 공정안전 및 손실방지분야에서 정의하는 위험관리(Risk Management)란 공정 내에서 잠재적 위험요소를 찾아내어 예상되는 피해의 크기를 결정하고, 현재의 공정시스템의 능력과 안전장치의 적절성을 확인하며 이 위험요소를 예방하고 제어하기 위한 절차를 평가 관리하는 것이다.(중략)

  • PDF

Analyzing the Practice and Relationship of the onfiguration Management among International Standards (국제 표준간 형상관리 공정의 활동 및 관계 분석)

  • 황선명;김혜미;김태훈;노병규
    • Convergence Security Journal
    • /
    • v.3 no.1
    • /
    • pp.85-94
    • /
    • 2003
  • The Configuration management process is to establish and maintain the integrity of all the work products of a process or project. This paper discusses the similarities and differences between ISO/IEC 12207 and ISO/IEC 15846. The most widely used models for software process assesment, ISO/IEC 15504, CMM and CMMI can rate maturity of processes. We analyze and compare the practices for measuring Configuration process and propose metric for quantitative measure.

  • PDF

A Study on the Complex Target & Pre-Control Chart Apply to Lean Production (Lean 생산방식에 적합한 Complex Target & Pre-Control Chart 적용방안 연구;동일 허용공차를 생산하는 다품종 소량생산을 중심으로)

  • Shin, Heung-Sub;Ree, Sang-Bok
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2007.04a
    • /
    • pp.187-195
    • /
    • 2007
  • 최근 우리나라에서 도요타를 벤치마킹하여 TPS를 도입하는 회사가 늘어나고 있다. 다품종 소량생산의 Lean 생산방식을 적용하기 위해서는 셋업시간의 단축 뿐만 아니라 이에 따른 셋업 품질능력이 향상되어야 한다. 따라서, 공정을 셋업하는 작업자들에게 이러한 Complex Target & Control Chart를 적용한다면, 통계적인 지식 없이도 공정의 불량을 예방 할 수 있으리라 확신한다. 이러한 관리도를 사용하여 공정능력을 향상한다면, 일본과 같은 높은 수준의 공정능력을 확보 할 수 있을 것이다. 단, 본 관리도는 현장 작업자를 위한 불량예방을 위한 품질관리 도구이며, 공정변동을 관리하기 위해서는 엔지니어 측면에서 관리도의 활용도 병행되어야 한다.

  • PDF

STEPS : shipbuilding tact epert planning system (선각 조립공정 스케쥴링 전문가 시스템)

  • 최영순;김남훈;이창호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.668-677
    • /
    • 1994
  • STEPS는 삼성 조선의 블록 조립생산공정의 라인스케쥴링을 수행하는 시스템이다. 삼성중공업 조선 해양 사업본부는 그간 생산성 향상을 통한 대외 경쟁력 제고와 선진 조선의 입지를 확고히 하고자 부단한 노력을 기울여 왔다. 이러한 노력은 생산 설비 확충과 자동화 등 하드웨어 차원에서 많은 발전을 이루었고, 이제는 설계, 계획, 관리등 소프트웨어 차원의 발전으로 전환하고 있다. 15여년 간의 경험과 노하우를 체계적으로 정립하여 현실적이면서 합리적인 소프트웨어를 구축하는 것은 삼성조선의 새로운 도전이 되고 있다. 이에 현장 데이타의 축적과 효과적인 관리 피드백으로 선각, 도장, 의장등 전 공정을 합리적으로 계획, 관리코자 생산공정 관리 시스템의 구축을 추지하고 있다. 이러한 생산공정 관리 시스템의 일환으로 대.중조블럭 일정계획의 자동화한 것이 STEPS(Shipbuilding Tact Expert Planning System) 프로젝트이다. STEPS는 전문가시스템(Expert System)으로서 전문가의 지식(Knowledge)을 시스템화하는 인공지능 (Artificial Intelligence)기법을 적용하고 있다.