• Title/Summary/Keyword: 공정관리체계

Search Result 423, Processing Time 0.037 seconds

A Study on the Organization of the 『Gongchengzuofazeli (工程做法則例)』 (『공정주법칙례(工程做法則例)』의 구성 체계에 관한 연구)

  • Yang, Hee Sick;Han, Dong Soo
    • Korean Journal of Heritage: History & Science
    • /
    • v.44 no.2
    • /
    • pp.26-45
    • /
    • 2011
  • The Gongchengzuofazeli, which was published in 1734, the 12th year of the Yongzheng (雍正) emperor of the Ching Dynasty, is an authoritative book that discusses the architectural technology and engineering practices at that time. Moreover, buildings constructed during the Ching Dynasty are substantially similar with the book's content. This study is important in that it is done as the first step in conducting a comparative analysis between the Korean and Chinese wood structure mechanism. First, each content of the book is examined according to the editing order. And second, the standard for division between Da-shi (大式) and Xiao-shi (小式) architecture in terms of heavy woodwork method (vol. 1~27) is redefined, from which a new organization is deduced.

A Case Study of Developing a Quality Information System for a Small Sized Company (중소기업용 품질정보시스템 개발 사례)

  • 최규필;박재홍;변재현;서기헌
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.700-703
    • /
    • 2000
  • 국내 대부분의 중소기업에서 품질관리 활동을 실시하고 있지만 품질관리 활동으로부터 제공되는 품질데이터를 체계적으로 수집하여 활용하는 중소기업은 많지 않은 것이 현실이다. 본 연구는 중소기업의 품질정보를 체계적으로 관리하고 활용하기 위한 품질정보시스템 개발사례를 제시하고자 한다. 먼저 수입, 공정, 완제품 검사 단계별로 품질정보를 모듈화하여 품질정보의 흐름을 파악하고, 두 번째로 통계적 공정관리 모듈을 추가하여 하나의 거시적 품질정보시스템으로 완성하였으며, 마지막으로 현재 개발된 거시적 품질정보시스템의 완성도를 높이기 위해 지식 기반에 근거하여 품질문제를 해결하기 위한 미시적 품질 정보시스템을 결합시킨 종합적 품질정보시스템 구축하기 위한 의견을 제시하였다.

  • PDF

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

Design and implementation of a project management system capable of process management by Activity using PERT/CPM (PERT/CPM을 이용한 Activity에 대한 연결 공정관리가 가능한 프로젝트 관리 시스템의 설계 및 구현)

  • Park, Sun-Yi;Park, Hee-Sook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.5
    • /
    • pp.802-807
    • /
    • 2022
  • In projects where mufti-project management is required and processes for production activities are repeated and linked, it is very difficult to input processes for activity repeatedly or analyze loads by process in a method of managing processes step by step. In this paper, based on the definition of activity and project process, the connection process can be automatically created for activity, schedule and resource management for each process, schedule and resource plan can be established for each detailed process, and load analysis can be provided in real time. It presents a project management system that can significantly improve the time and cost of project progress management, predict various problems that may occur during the project, and effectively allocate the necessary amount of resources in the right place.

Project Informations Classification System for Civil Works (토목공사용 정보분류 코드체계의 개발)

  • Lee, Bae Ho;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.897-905
    • /
    • 1994
  • Project Informations Classification System (PICS) can be utilized as a springboard for advanced construction management techniques because it marries informations to networks and maintains a disciplined cost control. The present study attempts to develop a PICS which can be applied in construction management techniques. The frame work largely consists of the three parts such as: (i) development of the tentative Work Breakdown Structure with three divisions, facility calssifications, functional classifications and work classifications, covering the whole areas of civil works, (ii) development of the integrated informations system including the other informations in cost estimating and network scheduling, (iii) construction of relational database system for computer application. The system suggested in the study is found useful for the systematic and uniform management of construction works in the various stages.

  • PDF

Developing A Curriculum Model for Technician Training Course of Managing Production in Electronic Industry (직무분석을 통한 전자분야 생산공정 관리자양성을 위한 교과과정 개발)

  • Lee, Jung-Chul;Kim, Han-Joo;Lee, Sung-Dae;Jung, Jea-Wook
    • Journal of Engineering Education Research
    • /
    • v.9 no.2
    • /
    • pp.71-81
    • /
    • 2006
  • In this paper, we present, based on a systematic job analysis, the definition, flowchart and description of Production Management Technician(PMT)'s job in Electronic Industry for developing an PMT education and training program in the context of Korea situation. The result of this study reveals that there are 3 duties and 22 tasks in the job of Production Management Technician, and 12 education contents and 6 education courses in the PMT curriculum.

A Case on the Applying QDB based Schedule·Cost Data Management for Road Construction (디지털 수량산출정보 기반 도로분야 공정·공사비 정보 관리 시범적용 사례)

  • Moon, Jin Seok;Yoon, Hoi Soo;Han, Choong Han;Kim, Seong Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1428-1429
    • /
    • 2012
  • 건설분야 수량산출정보의 연계 및 교환을 위한 디지털 수량산출정보 교환표준과 지방국토관리청의 도로관리관점에 따라 구성된 작업분류체계를 바탕으로 도로분야 수량산출정보를 지원도구를 통해 생성한다. 건설사는 지원도구에서 작성한 도로공사 수량산출정보를 건설사업관리시스템에 등록함으로써 공정 공사비 관리에 활용하고 있다. 본 연구는 공정 공사비의 통합관리를 통해 실질적인 사업관리가 가능하도록 10개 도로건설공사 시범사업을 선정하여 문제점과 개선방안을 도출하였다.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF