• Title/Summary/Keyword: 공유수면 매립기본계획

Search Result 3, Processing Time 0.017 seconds

Estimation for Reclamation of Public Waters Demand Using Time-series Analysis (시계열 분석을 통한 공유수면 매립 수요 예측)

  • Shin, Chul-Oh;Choi, Eun Chul;Yoon, Sung-Soon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.7
    • /
    • pp.918-923
    • /
    • 2021
  • The Korean government is developing a 10-year master plan pertaining to the Public Waters Management and Reclamation Act. However, it was observed that implementation of the reclamation project through frequent changes would occupy a significant proportion. Thus, questions are being raised about the effectiveness of the master plan. In view of this, the need for a trend analysis on long-term reclamation demand is growing. Accordingly, in this study, a trend analysis of reclamation demand was carried out using the annual reclamation performance data. The results of the analysis indicate that the demand for reclamation of public waters continued to decline, and the trend has been particularly evident since the 1990s, when it was converted into a reclamation master plan. In addition, the total demand for reclamation during 2021-2030 was calculated to be at a maximum of 13.8 km2 and minimum of 1.7 km2.

Diagnosis of Scoping and Type of Review on the Marine Environmental Impact Assessment for Ocean Energy Development Project (해양에너지개발사업 환경영향평가 검토유형 및 중점평가사항 진단)

  • Lee, Dae In;Kim, Gui Young;Tac, Dae Ho;Yi, Yong Min;Choi, Jin Hyu;Kim, Hye Jin;Lee, Ji Hye;Yoon, Sung Soon
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.18 no.3
    • /
    • pp.179-188
    • /
    • 2015
  • This study reviewed the type of the project and developmental plan related to ocean energy development in the coastal land boundaries and the ocean, and suggested the efficient scoping method through the diagnosis of the key items of environmental impact assessment (EIA) in the coastal area. The major projects are the construction of tidal power plant, tidal current power plant, and offshore wind power plant in the public water, and also those are the construction of solar power plants in the coastal land boundaries. While the project plans on a large scale such as the construction of tidal power plant, it is important to consider both property of usefulness of the designated areas and harmony analysis with marine space availability based on the adequacy of the site selection and relevance of plan with the master plan for reclamation and strategic environmental assessment (SEA). And also it needs to be considered the careful checkup on the EIA checklist referring to the type of project, effective post-monitoring, and suggestion of mitigating methods to minimize the environmental impacts during the stage of actual environmental impact assessment. Introduction of a system of integrated marine environmental impact assessment should be considered for reasonable and effective manage to developmental projects on the marine spatial area.

A Study on Rational Alternative Comparison of Prior Review on Environmental Conditions for Basic Plan of Public Waters Reclamation (공유수면매립 기본계획 사전환경성검토의 합리적인 대안비교에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo;Byon, Seong-Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.6
    • /
    • pp.563-571
    • /
    • 2010
  • In carrying out the prior review on environmental conditions for basic plan of public waters reclamation, the important item is review on conditions of location on prearranged reclaimed land. In this study, environmental assessment which needs careful consideration in the first stage of selecting location is presented by analyzing environmental impact assessment on public waters reclamation projects for about 10 years. The assessment index for alternative comparison is divided into two parts according to importance level. What is most important in alternative comparison is the comparison on direct influence due to reclamation. In other words, it figures out damaged extent of natural shoreline as well as intertidal and infralittoral zones. Comparing influence extent due to reclamation through the 1st comparison on this is regarded as to be important. In case there is no significant difference by alternatives through the 1st assessment, the 2nd assessment should be carried out. In the 2nd assessment indexes are damaged quantity of benthic organism, change in seawater current, erosion, accumulation and exchangeable rate of seawater. The plan for selecting optimal location which minimizes environmental influence in establishing public waters reclamation plan is demonstrated through model cases. For this, 3 districts which have similar environment and scale are selected, and then comparison on location alternative is made through environmental assessment index. In addition, the comparison on 3 arrangement alternatives are conducted, targeting certain areas. It is thought that carrying out comparison review on respective areas in the same cities and counties, not merely comparing arrangement plan by selecting 1 targeting area in advance, is the most appropriate. Besides, selection of arrangement plan considering environment, which minimizes damage of natural shoreline and influence due to change of seawater current is required in alternative comparison on arrangement plan as well. In case of the prior review on environmental conditions though alternative comparison method presented in this study is carried out, it is safely said that the influence on ocean environment due to public waters reclamation can be minimized.