An Automated and Intelligent Process for Construction Supply Chain Management Utilizing Ubiquitous Technologies (USN 기술을 활용한 지능형 건설물류관리 프로세스)

  • Lee, Woo-Jae;Lee, Nam-Su;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.756-761
    • /
    • 2007
  • The construction Supply Chain Management(SCM) plays a critical role to proceed construction projects successfully. It is necessary to develop a system to support better communication among various actors and to supply construction materials in the right place on time with unstable situations on site according to the planned construction schedule for effective Supply Chain Management. Therefore, the objective of this study is to propose an automated and intelligent process that can be used to utilize ubiquitous technologies in construction supply chain management. This process consists of various equipments that can collect, store, calculate and communicate data among themselves. This study deals with a conceptual idea in order to improve process and equipment in the supply chain management process.

  • PDF

A Study on the Improvement of Management of Historical Data in Construction (건설공사 실적관리 개선에 관한 연구)

  • Cheon Bong-Gi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.107-113
    • /
    • 2002
  • The processes for management of historical data in construction have many problems according to construction firm$^{\circ}{\phi}$s participating in some of the processes. This study analyzed about current process and provided improved processes with IDEF method and simulation. The proposed $\lceil$To-Be$\rfloor$ model is more effective than $\lceil$As-Is$\rfloor$ model according to the result of simulation performance. It is revealed that the productivity in the construction company is more improved than that of the owner from the results of the system simulation.

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

A study on differential protection IED based on process bus for transmission line and the method of phase difference compensation (프로세스버스 기반의 차동보호계전 IED의 위상각 차 보상장치 및 방법에 관한 연구)

  • Han, Jeong-Yeol;Shim, Eung-Bo;An, Yong-Ho;Kim, Yong-Hak;Lee, You-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.735-736
    • /
    • 2011
  • 최근 IEC61850 기반의 변전소 자동화 시스템의 구축이 국내 외적으로 활발히 진행되고 있다. 국내에서는 한국전력공사를 중심으로 총 3차의 시범사업을 진행하였고, 현재 4차 시범사업을 추진 중이다. 2005년 한국전력공사 주관으로 수행중인 연구과제의 성과물로 송전선로 보호용 IED를 제외한 보호, 제어 IED의 국산화가 완료되어, 외산 IED와 함께 4차 시범사업에 활용되고 있다. 그러나 현재까지 국내에서 추진되고 있는 변전소 자동화 시스템은 스테이션버스 레벨의 시스템이며, IEC 61850기반 프로세스버스 레벨의 시스템 구축을 위한 연구는 아직 진행중에 있다. 본 논문에서는 프로세스버스 레벨의 송전선로보호를 위해 선행되어야 할 문제점에 대해 논하고, 그 중 차동보호계전에 필요한 프로세스버스 기반의 위상각 차 보상장치 및 방법을 제시한다.

  • PDF

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

A Process Improvement in Building Constructions using Value Stream Analysis - Focused on slab works - (가치흐름 분석을 통한 건설공사의 공정개선방안 - 슬래브 공사를 중심으로 -)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook;Jang Chan-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.527-530
    • /
    • 2002
  • The purpose of this study is to present an improvement of the form work process. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Understanding of non-value adding activities in existing slab form work process 2) Process integration by value stream mapping 3) Effect analysis of time-cost reduction. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction.

  • PDF

The Study on Correlation Between Factors Decreasing Construction Productivity and Waste Factors with Relation to Lean Construction (린 건설과 연계한 생산성 저하 요인과 Waste 요인과의 상호 관련성 연구)

  • Park Joo-Hyun;Kim Dae-Young;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.164-172
    • /
    • 2003
  • 생산성은 프로젝트를 관리하는데 있어서 효율성을 측정하는 중요한 지표이다 또한 건설 생산성은 비용 및 일정과 연관성이 있을 뿐만 아니라 프로젝트의 성공 여부와도 관련이 크다. 프로젝트에서 생산성의 중요성에도 불구하고 국내에서의 생산성 관련 연구는 생산성에 대한 기본 개념 및 원칙에 관한 기초적인 연구 없이 정량적인 연구에 집중되어 있으며, 관련 데이터 수도 적은 실정이다. 국내 건설 공사의 생산성을 향상시키기 위해서는 생산성 관리의 정량적친 요인뿐만 아니라, 정성적인 요인까지 관리해야 하며, 저하요인에 따른 체계적이고 세부적인 프로세스 및 기법이 제시되어야 한다 이에 국내 건설 공사의 생산성 관리에 린 건설을 도입하고자 한다. 본 연구에서는 국내 생산성 저하요인과 린 건설에서의 Waste 요인과의 상관관계 분석을 통해 국내 건설 공사 현장에서의 Waste 주요 의미를 살펴보고 두 요인간의 상호 관련성을 파악하여, 린 건설의 프로세스 및 기법을 국내 건설 공사 현장에 적용하기 위한 이론적인 근거를 제공하고자 한다.

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

Waste Elimination in Construction Process using Value Stream Analysis - Focused on Waste Elimination of Re-bar Works (가치흐름 분석을 통한 건설프로세스의 낭비제거 방안)

  • Mun Jeong-Mun;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.416-421
    • /
    • 2001
  • The domestic reinforcement concrete works have mainly worked the process of re-bar fabrication/assembly on site and re-bar works affected by structural safety, durability, and schedule with form work. Accordingly, This study analyzes the process of re-bar fabrication/assembly on site to apply lean production principles to construction Value Stream Analysis(VSA) is analyzed into value-adding activity and non-value-adding activity on construction process through value analysis and Value Stream Mapping(VSM). In the results, non-value-adding activity generates waste such as the activity steps, labors, equipments, materials, time, and so on. Additionally, push-driven production is investigated making low productivity from the overproduction and so on. To resolve the problems in the process, The purpose of this paper eliminates waste factor through maximizing the value-adding activity generating value added and minimizing non-value adding activity. Particularly, it makes flow production and pull-driven production through minimizing work-in-process(WIP ).