A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.

Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency (교육시설물 공사비 관리 효율화를 위한 BIM 적용방안에 관한 연구)

  • Kwon, O-Bin;Son, Jae-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.49-60
    • /
    • 2010
  • Cost Estimating allows each entity in a construction project to plan, distribute, and control its required construction cost for the project. However, existing 2D design based estimating has problems, such as inaccuracy and inefficiency caused by missing, duplicated, or erroneous calculations. In this situation, current estimations for school facilities have more difficulties in forecasting construction costs due to an inadequate work breakdown structure for BOQ (Bill of Quantity) and insufficient guidelines for Basis of Estimate. In this study, therefore, an effort was made to increase the efficiency of estimating for school facilities by applying a 3D modeling based BIM tool to quantity and cost estimates. In addition, this study suggested a reasonable work breakdown structure for BOQ that was appropriate when 3D modeling was applied, and verified it through a case study. The authors tried to provide a BIM-based estimating method for school facilities to obtain greater accuracy and efficiency by having more information in an earlier stage.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

A Conceptual Model of Construction Information to Be Used According to Construction Process (현장 시공 프로세스에 따른 시공정보관리 개념 모델)

  • Kwon Young-Sang;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.39-47
    • /
    • 2001
  • Nowadays, the enormous information from each industry has been brought out. According to the advanced information technology, those data have been useful to the point of Cost & Time in the domestic construction industry. Due to the temporary characteristics of construction industry, the various information have only been used just one time and not recycled. There are few studies for the use and management of construction information. Compared with other stages in project life-cycle, the construction stage includes the most important and various information from field. It will be desirable that one should study for developing the use of construction information. With this thesis, this study suggests the conceptual classification model for construction information management.

  • PDF

Establishment of Risk Database and Development of Risk Classification System for NATM Tunnel (NATM 터널 공정리스크 데이터베이스 구축 및 리스크 분류체계 개발)

  • Kim, Hyunbee;Karunarathne, Batagalle Vinuri;Kim, ByungSoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.32-41
    • /
    • 2024
  • In the construction industry, not only safety accidents, but also various complex risks such as construction delays, cost increases, and environmental pollution occur, and management technologies are needed to solve them. Among them, process risk management, which directly affects the project, lacks related information compared to its importance. This study tried to develop a MATM tunnel process risk classification system to solve the difficulty of risk information retrieval due to the use of different classification systems for each project. Risk collection used existing literature review and experience mining techniques, and DB construction utilized the concept of natural language processing. For the structure of the classification system, the existing WBS structure was adopted in consideration of compatibility of data, and an RBS linked to the work species of the WBS was established. As a result of the research, a risk classification system was completed that easily identifies risks by work type and intuitively reveals risk characteristics and risk factors linked to risks. As a result of verifying the usability of the established classification system, it was found that the classification system was effective as risks and risk factors for each work type were easily identified by user input of keywords. Through this study, it is expected to contribute to preventing an increase in cost and construction period by identifying risks according to work types in advance when planning and designing NATM tunnels and establishing countermeasures suitable for those factors.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

An Integrated Construction Management System Based on the Earned Value Concept (EV개념에 의한 통합건설공사관리시스템)

  • Chung Chul-Won;Lee Jeom-Su;Oh Kyu-Whan;Chang Jin-Sik;Lee Yu-Seop;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.155-162
    • /
    • 2001
  • Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Analysis of Keyword-based Content Search Service Requirements in Video Archive for Media Creation (미디어 창작을 위한 비디오 아카이브 키워드기반 내용 검색 서비스 요구사항 분석)

  • Jung, Byunghee;Park, Wan;Lee, Yunseong;Lee, Hajoo;Kim, Sansung
    • Proceedings of the Korean Society of Broadcast Engineers Conference
    • /
    • 2022.06a
    • /
    • pp.1265-1267
    • /
    • 2022
  • 방대한 분량의 콘텐츠 홍수 속에서 원하는 소재를 찾기 위해 콘텐츠 내용을 검색할 수 있는 효과적인 방법이 지원되는 것은 창작을 자유롭게 하고, 콘텐츠 활용도를 높이기 위해 매우 중요하다. KBS 바다 서비스의 경우 분류체계 방법을 사용하고 있으나. 최근 딥러닝을 이용한 인공지능 기술의 발전으로 콘텐츠의 내용을 인공지능 기술로 태깅하고, 태깅된 텍스트 정보를 이용하여 검색할 수 있는 기술 개발이 활발히 수행되고, 국가적으로도 해당 기술을 지원하고 있다. 본 논문에서는 이러한 기술 개발의 선행 요소인 방송사의 제작과정에서 요구되는 동영상 소재 콘텐츠 검색의 요구사항을 KBS 비디오 아카이브 검색 키워드 실제 사용 데이터를 이용하여 분석하였다. 약 1,000여건의 검색 키워드 분석과 이용자와 운영자의 응답 내용을 고찰한 결과, 특정 키워드에 집중하여 검색할 수 있도록 보완하여 주는 것이 필요함을 알아내었다. 또한, 검색 범위를 효과적으로 축소하여 검색을 손쉽고 빠르게 할 수 있는 방법을 고찰하였다. 본 논문에서는 미디어 창작에서 필요한 소재 콘텐츠를 찾기 위해 연구 개발해야 할 미디어 속성 추출 기술의 방향성을 제시하였다.

  • PDF

The Layer Standardization of Computerized Landscape Facility Drawings (조경시설물 전산 도면의 레이어 표준화 방안)

  • Kim, Choong-Sik
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.76-90
    • /
    • 2011
  • As most landscape drawings tend to be recorded in electronic format, the need for layer standards is growing. While the categorization system of planting drawings has been progressing, landscape facility drawings are being delayed. So, the purpose of this study was to establish the categorization system of computerized landscape facility drawing documents. In the beginning of this study, it found that the layer categorization system of "The Standards of Construction CALS/EC computerized drawings v1. 1" and "The submit instructions of electronic design documents" are not suitable for the landscape facility drawings. 1,154 drawings drawn by 10 landscape architect offices were used to analyze the current layer categorization status. As a result, it found that "The Standards of Construction CALS/EC computerized drawings v1. 1" were not introduced in landscape facility drawings and 46% of layers were produced indefinitely. The new layer categorization system consisting of 15 facility items was drawn by applying the ISO construction information categorization system. The new layer categorization system is set on the basis of the legal code, landscape design standards, and design guidelines of public institutions. This new layer categorization system is expected to propagate at the landscape architect offices in the early.