A Trend Analysis of Small Type House Construction Cost in Multi-Family Housing (공동주택 소형평형 공사비 트렌트 분석)

  • Park, Wonyoung;Cha, Yongwoon;Park, Taeil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.261-262
    • /
    • 2021
  • Increasing construction costs are required due to increasing the supply of small type houses with changes in multi-family housing trends. However, a sharp rise in the construction cost of small type houses can raise the sale price, threatening the stability of national housing. Therefore, this study aims to estimate the change in the construction cost of small type houses from the basic construction cost of the sale price ceiling system and suggest an improvement plan.

  • PDF

A Study of the Development of Apartment's Structural Cost Saving Checklist through the Case Research (사례분석을 통한 공동주택 골조공사의 원가절감 체크리스트 개발에 관한 연구)

  • Lee, Kyeong-Seob;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.65-77
    • /
    • 2010
  • Our nation's housing construction is given much weight over 32% in 2007 and especially apartment is taking over 67%. If we put into construction environment consideration, we are having a trouble with price cap policy and the realestate recession due to the global economic crisis. So in order to get competitive power and supply of cheap apartment, the necessity of cost saving is increasing. This research collected the past constructed apartment project's cost saving examples which were influencing on the construction cost, quality and time. We analyzed collected cost saving datum and assorted these in compliance with classification system. By analysis of correlation among datum with exclusion and integration, we make a propose cost saving Checklist that will be a base data to give a chance to use in working level and other research.

Assessment of Project Cost Reduction Potential Adopting Cases-Synthetic Approach - Focused on the Apartment Building Construction Project - (시공방법 개선사례 조합에 의한 원가절감 가능성 평가)

  • Choi, Jong-Soo;Choi, Young-Jun;Chae, Seong-Tae;Yoo, Sung-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.135-144
    • /
    • 2009
  • The primary focus of this study has been directed towards assessing the potential impact of construction method improvement on a reduction in project cost. A total of 90 actual application cases were collected from a public organization and private construction firms, and 32 cases were used in analysis by adopting a synthetic approach. The level of cost reduction was measured in terms of material and labor cost by comparing the existing method and the improved method. An analysis of the results indicates that project cost can be reduced by up to 5.26 percent compared to a normal project by adopting a synthetic approach. Additional benefits include the assurance of uniform quality, savings in terms of labor and/or materials, and improved productivity. The potential of the applicability of this approach to other types of buildings and the implications of research findings were discussed in detail.

An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost (해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토)

  • Sung Nak-won;Kim Young-suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.579-583
    • /
    • 2004
  • A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.

  • PDF

An Application Plan of Cost Information through Actual Date Information DB Construction (공사실적정보 DB구축을 통한 원가정보 활용방안)

  • Kim, Soung-Jik;Kim, Tae-Hui;Min, Kyung-Seok;Kim, Ok-Gyu;Kim, Chan-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.495-498
    • /
    • 2007
  • The latest parceling-out price upper limit ancestor memorial service enforcement, Sale in lots circle is elated interest of society each floor for construction working expenses by open etc. but private investment law for society basis facilities, because circle that is presenting in parceling-out price upper limit ancestor memorial service back is different system (configuration item), cross is expected. A lot of study results connected with cost control expense arbor in the mountains etc. were presented until present, but persistent DB expulsion prohibition. Cost information is standardization unpreparedness of system. It is real condition that is hoarded since research and development by practical use plan presentation unpreparedness etc. Therefore, in this study, desire does actual date use plan presentation by purpose through DB construction after process by information form of good quality so that can collects efficiently and manages and utilizes at construction production step flag firm' s results data which is achieved. Can utilize to data of tool development that maximize ultimately comprehension about employer' s business and business order ability through persuasion, and diverts in cost control business hereafter.

  • PDF

The Analysis about Construction Costs and Profitability of Direction between Subcontracting Construction in General Construction Industry (일반건설업의 직접시공과 하도급시공의 공사원가 및 수익성 비교분석)

  • Hwang, Ug-Sun;Lee, Hyun-Suk
    • Korean Business Review
    • /
    • v.19 no.1
    • /
    • pp.25-34
    • /
    • 2006
  • This research executed research that analyze construction cost and profitability through construction example of direction and subcontracting construction based on common private construction less than 3 billion. The results of this research, is summarized as follows. (1) Analyzed profitability about construction gross and operating profit of direction and subcontracting construction. The construction gross profit rate is 15.2% direction construction, subcontracting construction was analyzed by 1.3% high by 16.5% subcontracting construction, and the operating profit rate is 9.4% direction construction, subcontracting construction was construed by 2.3% high by 11.7% subcontracting construction. (2) Analyzed profitability about operating profit before and after deduction of 4 insurance cost of direction construction. The direction construction operating profit rate is 9.4% before deduction of 4 insurance cost, after deduction was construed that is 7.3% and operating profit rate difference after and before deduction was construed that is 2.1%. Therefore, subcontracting construction (operating profit rate 11.7%) was analyzed that last operating profitability after 4 insurance cost deduction produces more 4.4% about direction construction.

  • PDF

A Study On Reduce Scheme Of Design Error In Turn-Key Projects (턴키공사 설계오류 저감방안에 관한 연구)

  • Kim Byeong-Soo;Kim Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.286-289
    • /
    • 2003
  • In turn-key projects, escalation of cost by design errors is not allowed because a contractor prepares the design. Therefore, cost escalation by design errors results in increasing the cost of the prime contractor. The rate of profit decreases finally. In addition, design errors bring not only schedule delay but also serious quality problem by unknown errors. This study tries to dissolve problems, that of cost increase. process delay and a falling-off in quality by investigating cause of design errors and presenting a scheme for reducing design errors.

  • PDF

Application of Utility Theory for Asset Management of Deteriorated Infrastructure (노후인프라 자산관리를 위한 효용이론 적용 방안)

  • Cha, Yongwoon;Park, Wonyoung;Park, Taeil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.311-312
    • /
    • 2021
  • As the number of deteriorated infrastructures increases, research on decision-making methods for efficient budget allocation is required. Thus, this study considered the application of utility theory for asset management of deteriorated infrastructure. In decision-making, methods that enable quantitative measurement were proposed, attributing the aging, economic feasibility, and ripple effects. This study is meaningful as a basic study of decision-making methods, and we will conduct research applied to case studies in the future.

  • PDF