• Title/Summary/Keyword: 공사수행방안

Search Result 513, Processing Time 0.028 seconds

A Study on the Factors Affecting the Detailed Design Price of Road Construction Project (국내 도로공사 실시설계 대가영향요인에 관한 연구)

  • Lee, Mi-Young;Seo, Jung-Hoon;Oh, Se-Wook
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.44-54
    • /
    • 2018
  • In the construction project, the design field has a crucial effect on the success or failure of the final product, and it is becoming more important as a core area of national industrial development because it creates high value added by technology. In addition, since the design work is carried out based on professional technical personnel, in order to secure the quality and competitiveness of the design, it is necessary to continuously input the excellent manpower and develop the technology, and above all, the appropriate design cost must be ensured. However, as a result of reviewing the current status of the design cost criterion in Korea, problems such as mixed cost calculation method, inaccuracy of construction cost ratio method, and inactivation of cost plus fixed fee method were analyzed. Therefore, it is difficult to calculate the fair value reflecting the characteristics of the project when calculating the construction design price. Therefore, the price criterion should be improved so that the fair value of the design can be determined according to the contents of the project, By analyzing the correlation and multiple regression analysis of the projects and price information of the completed road construction design, the factors influencing the design price and the level of influence were analyzed.

연구원_2015 연구과제 ⑦ - 기계설비건설업 관련법규 개선방안 연구

  • Lee, Yeong-Jun;Han, Seong-Ae;Park, Jong-Il
    • 월간 기계설비
    • /
    • s.310
    • /
    • pp.112-114
    • /
    • 2016
  • 대한기계설비산업연구원(원장 이언구)은 지난해 4월 연구심의위원회에서 선정된 ${\triangle}$기계설비건설업 동향분석을 위한 기초연구 ${\triangle}$기계설비건설업체의 부도예측 모형 연구 ${\triangle}$기계설비건설공사 시공상세도면 작성비 산정기준 연구 ${\triangle}$플랜트 건설현장 외국인력 고용 개선방안 ${\triangle}$녹색기술 기준에 근거한 연구과제 도출을 위한 기초연구 ${\triangle}$대용량 지열설비 이용을 위한 지중열교환기 용량 설계 툴 개발 ${\triangle}$기계설비배관 및 장비 단열 기준 연구 등의 기본과제와 외부기관과 공동으로 수행한 ${\triangle}$플랜트 건설현장 외국인력 고용 개선방안 ${\triangle}$기계설비건설업 관련법규 개선방안 연구를 추진했다. 지난 2월호에 시작된 연구원의 연구결과 요약 보고서는 이번호로 연재를 마친다.

  • PDF

An Application Plan of Cost Information through Actual Date Information DB Construction (공사실적정보 DB구축을 통한 원가정보 활용방안)

  • Kim, Soung-Jik;Kim, Tae-Hui;Min, Kyung-Seok;Kim, Ok-Gyu;Kim, Chan-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.495-498
    • /
    • 2007
  • The latest parceling-out price upper limit ancestor memorial service enforcement, Sale in lots circle is elated interest of society each floor for construction working expenses by open etc. but private investment law for society basis facilities, because circle that is presenting in parceling-out price upper limit ancestor memorial service back is different system (configuration item), cross is expected. A lot of study results connected with cost control expense arbor in the mountains etc. were presented until present, but persistent DB expulsion prohibition. Cost information is standardization unpreparedness of system. It is real condition that is hoarded since research and development by practical use plan presentation unpreparedness etc. Therefore, in this study, desire does actual date use plan presentation by purpose through DB construction after process by information form of good quality so that can collects efficiently and manages and utilizes at construction production step flag firm' s results data which is achieved. Can utilize to data of tool development that maximize ultimately comprehension about employer' s business and business order ability through persuasion, and diverts in cost control business hereafter.

  • PDF

Construction Supervision Improvement Methodology of Public Installment Buildings (분양건축물에 대한 감리제도 개선 방안)

  • Bu Seung-Hyon;Ryu Han-Guk;Lee Hyon-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.365-368
    • /
    • 2003
  • The supervision system due to the Building Law was introduced in 1963. As the building came to be more various from the side of use, efficiency and the size, it came to be complicated. Construction Technical Managemen Law started in 1994. and it introduced a responsibility supervision system. And Residential Building Promotion Law improved quality of Buildings. But these facts are limited in part in the supervision objective building, and supervision system is restricted. This research investigates the current problem of supervision system, and the improvement program will go far toward solving the problem.

  • PDF

Design Optimization of Earth Retaining Walls Using the Taguchi Method (다구찌 기법을 활용한 흙막이 가설공법 최적설계 방안)

  • Moon, Sungwoo;Kim, Sungbu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.83-89
    • /
    • 2017
  • Temporary structures provide the accessible working area when building a permanent building structure in the construction operation. Executed in a natural environment, the temporary structure is prone to the external influence factors of underground water, soil conditions, etc. These factors should be carefully considered in designing the temporary structure. The objective of this study is to apply the external influence factors in designing a more reliable earth retaining wall. The research methodology is based on the Taguchi method that has been studied to improve product quality in the industry. An orthogonal array was developed to analyze the interaction between the external influence factors and the internal influence factors. A sample case study demonstrated that the Taguchi method can be used in planning a more reliable temporary structure for earth retaining walls.

Study on Internal Corporate Venture Business in Public Companies;Based on A Public Company (공공기관의 사내벤처제도 개선방안;A사 사례연구)

  • Lee, Jong-Keon;Lim, Chan-Soo
    • 한국벤처창업학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.111-140
    • /
    • 2007
  • This paper was analyzed to improve internal corporate venture system in public companies. The problems of internal corporate venture systems in a public company were as follows: First, lack of the CEO's willingness in venture business was shown. The culture of venture business also was not mature; Second, the employees were behind the effort to develop their business ability; Third, the objective views are needed to screening venture items and evaluation; Fourth, to measure performance of internal corporate venture, a clear basis and measure system were needed. Fifth, the reward was restricted; Finally, the mother-company did not invest any money for the spin-outed ventures The results of the paper were as follows: First, the CEO's support and effusion of venture culture were needed for successful internal corporate venture system; Second, a public company has to provide education program for venture and information--sharing system; Third, outside consultant may be utilized in finding venture items and feasibility evaluation. Fourth, each venture team may be provided a clear object and specific evaluation system based on characteristic of each team; Fifth, performance-base reward system is needed to enhance motivation; Finally, the public company has to provide find for the spin-off venture by utilizing government system and forming venture capital funds.

  • PDF

Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation (물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안)

  • Jeong, Ki-Chang;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.540-545
    • /
    • 2008
  • The purpose of this study is to suggest problems and improving plan of process of calculating escalation rate of the Historical Cost by price fluctuation. In order to implement this research, we analyzed problems by calculating the rate of price fluctuation with Historical Cost and measurement applying method making on-site with historical cost data were included as samples and suggested improving plan to the adjustment of contract cost. The results of research according to this are same as followings:1) Of all construction details, it is more appropriate to calculate price fluctuation by applying measurement method to the contents of historical cost unit. 2) To avoid confusion in calculating method, it was indicated that amendment in part should be achieved in order to calculate by measuring the part of calculating escalation rate of Historical Cost at related law and regulation.

  • PDF

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

A Study on the Safety Countermeasures in Advanced Warning Area by Analyzing Driving Simulation in Work Zone (주행시뮬레이션을 이용한 고속도로 공사장 주의구간 교통안전표지 설치 방안 연구)

  • YOUN, Seok Min;PARK, Hyun Jin;OH, Cheol;CHUNG, Bong Jo
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.4
    • /
    • pp.278-291
    • /
    • 2017
  • Effective installation and operations of traffic safety signs in the advance warning area is of considerable interest for safer traffic management at freeway work zones. This study evaluated the feasibility of traffic safety sign installation based on a driving simulation experiment to take drivers' responsive characteristics into consideration. Both the compliance rate for speed limit and a lane-changing safety index were used for evaluating a set of driving simulation scenarios. It was identified that providing speed limit signs to reduce speed in advance and afterward guiding lane-changing could lead to safer maneuvering of vehicles entering work zones. The outcomes of this study are expected to be useful for revising freeway work zone management policies toward crash prevention.

Projection of Activity Duration Utilizing Historical Cost Data (자원투입 비용을 고려한 공정관리 작업기간 산정)

  • Moon, Sung-Woo;Kang, Sang-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.444-447
    • /
    • 2006
  • Construction managers need to pay a close attention to the resource utilization in order to deliver the construction project successfully. Construction scheduling is crucial for resource control in that it provides information when and how much to bring down work force to sites. In scheduling, activity duration is projected based on the productivity of historical data or the intuition of scheduler. This paper studies the opportunity of applying cost-based productivity for estimating activity duration. For cost-based productivity, the cost of resource is used as an input and the work quantities as an output. Out of historical data, regression model has been developed to understand the validity of applying cost-based productivity in projecting activity duration. The result of study will work as a prerequisite for implementing the environment of database-based construction scheduling.

  • PDF