• Title/Summary/Keyword: 공사비 산정방법

Search Result 164, Processing Time 0.03 seconds

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

Cost Estimating method for the Public Office building at the early stage (공공건축물의 초기공사비 산정방법 연구)

  • Koo, Won-Yong;Kim, Jung-Gon;Lee, Jun-Seok;Park, Hyeong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.261-266
    • /
    • 2007
  • In this research, we studied an estimating method in client's sight to estimate the total construction cost which is based on the historical cost data at the early stage of the office buildings as a public phase. It is very difficult to analyze the estimation accurately and logically. When a client estimates a project, he/she has to consider there are many issues at the planning step, according as office buildings become gradually diversified as well as their roles continuously extended. Therefore, those are usually make problems for wasting the budget in accordance with the cost estimation errors. Moreover, many kinds of public construction projects, especially such as school, office, sports complex, and the others, have been invested the private finances defined as BTL(Build Transfer Lease) method that are required to manage the detailed process more strictly from initial planning. In order to make an effective planning, the long-term users amount and the building life cycle at the beginning of project should be considered previously and then it may enable to achieve an appropriate project plan. But actually considering overall variables in a building planning is impossible. Accordingly, suggesting a regression model based on the historical cost data from many similar types of office building to support client's role known as estimating the total cost at the early stage. And then performing the test against the proposed model to research the reasonability as using the historical cost data of Japan office buildings.

  • PDF

Calculation of Construction Cost Rate to Telecommunications Engineering Service (엔지니어링대가 공사비 요율 산출방법 고찰)

  • Hong, Wan-Pyo;Choi, Kwang-Don
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.12
    • /
    • pp.2121-2125
    • /
    • 2006
  • This paper shows the calculation system of construction cost rate to telecommunications engineering service that is based on the tenth article of the Engineering Technique Promotion Law. The existing construction cost rate had been calculated using the experiential statistics or quoted the foreign construction cost rates. This paper apply the theoretical method to calculate the construction cost rate instead of the existing method. To calculate it more reasonably, this paper apply the characteristic own of the current construction cost rate. The result of this paper can be introduced to calculate the construction cost rate for the telecommunication engineering service.

Field Drought Vulnerability Analysis Using Entropy Weighting Technique (엔트로피 가중치 기법을 적용한 밭 가뭄 취약성 분석)

  • Shin, Hyung Jin;Lee, Gyu Min;Lee, Jae Nam;Jeong, Gi Moon;Ha, Chang Young;Lee, Gyu Sang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.300-300
    • /
    • 2022
  • 가뭄 취약성은 다양한 평가 요소가 반영되는 다기준 구성으로 개념화될 수 있으며 관련하여 수반되는 영향을 집계하여 측정해야 하므로 여러 변수가 제공하는 정보를 통합해야 한다. 따라서 가뭄 취약성 평가의 일반적인 절차에는 (1) 고려할 변수 선택, (2) 가중치 체계 정의 및 (3) 변수 집계가 포함된다. 여기서 가중치 산정은 평가결과에 막대한 영향을 미칠 수 있는 중요한 과정이다. 각 평가 요소는 내재된 의미가 다르기 때문에 모두 동일한 가중치를 가지고 있다고 가정 할 수 없다. 따라서 각 평가 요소별로 영향력을 가늠하는 가중치를 찾는 것이 다기준 평가에서 주요한 연구 분야이다. 본 연구에서는 밭 가뭄 취약성 평가를 위한 평가 요소의 자료로부터 각 요소를 통계적 기법으로 분석하여 평가 결과에 반영함으로써 주관적인 가중치를 적용하는 평가기법에 따른 편향 가능성을 해소하고자 한다. 객관적 가중치 산정기법인 Entropy, PCA 기법을 적용하였다. 평가 결과는 가중치 산정기법에 따라 차이가 발생하였으며 특히 Entropy 가중치의 경우, 다른 방법에 비하여 차이가 많이 나타났으며 이 같은 차이는 Entropy 가중치 산정기법상 정보의 변화량이 많은 평가인자에 과도한 가중치가 반영된 결과로 판단된다. 본 연구에서 제시한 밭 가뭄과 연관되는 지표를 적용하여 가뭄취약성을 평가하는 방안은 각 지역에 내재된 밭 가뭄취약정도를 파악하여 사전에 대응하기 위한 정책 수립 등에 기여할 수 있다.

  • PDF

A Study on The Estimate of Risk Index by job classification for Apartment Construction (아파트공사의 직종별 위험도 산정에 관한 연구)

  • Kim, Dong-Ryeong;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.9-23
    • /
    • 2013
  • 건설공사는 인력의존도가 가장 높으며 타 산업에 대비하여 자동화가 매우 낮고 외기에 노출된 작업 환경으로 추락 등의 중대재해 위험이 가장 높은 산업이다. e-나라지표에 의하면 2006년부터 2012년까지 전체 산업의 약 21.9%를 차지하는 건설 근로자가 생산 활동에 종사하고 있으며, 이직 및 인력의 이동이 매우 잦은 특성을 갖고 있다. 2006년~2012년까지의 재해발생 통계에 따르면 전체적으로 타 산업은 매년 다소간의 증감은 있으나 재해가 감소하는 추세이지만, 건설공사의 경우는 지속적으로 증가하고 있다. 특히, 사고성 사망재해의 경우는 7년간 전체 산업에서 발생하는 사고성 사망재해의 평균 40.9%를 건설업이 차지하고 있어 가장 높아 매우 심각한 수준이다. 또한 건설현장과 건설회사의 안전보건경영의 운영방법 및 제도가 매우 단순하고 정성적인 수준으로 타 산업에 비하여 안전경영의 정량화에 대한 노력이 매우 미약하다. 과거 재해사례 및 통계를 분석하여 앞으로의 재해 위험 요소를 제거하거나 안전한 상태로 형성하여야 하나, 발표되는 재해사례나 통계를 구호 또는 슬로건으로 전파, 교육하는 수준에 머물고 있다. 본 연구에서는 아파트공사를 대상으로 2006년~2011년의 과거 재해통계(8,687건)를 분석하여 데이터베이스화하고, 실제 공사한 아파트공사 샘플현장의 자료(89,375명)를 데이터베이스화하여 현 실정에 부합한 정량적 직종별 위험도를 산정하는 연구를 진행하였다. 따라서 아파트공사의 직종별 위험도를 정량적인 데이터로 산출하고, 과학적인 방법으로 현장 위험수준을 실시간 모니터링 함으로써 건설현장의 주된 생산력인 근로자의 생명과 건강을 보호할 수 있는 효과적인 재해예방이 이루어 질 것으로 기대된다.

  • PDF

A Study on Prediction of Earth Retaining Work Cost in the Project Planning Stage -Focusing on Apartment Construction Projects in Seoul- (사업기획단계에서 흙막이 공사비 예측에 관한 연구 -서울시내 아파트 건설사업을 중심으로-)

  • Lee, Jin-Kyu;Yang, Kyung-Jin;Park, Ki-Hyeon;Kim, Chan-kee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.385-392
    • /
    • 2021
  • In general, earth retaining work in construction works enables the construction of structures, prevents the displacement of the surrounding ground to the maximum extent, and plays an important role in ensuring the safety of the surrounding structures and field workers. The earth retaining work and the construction method differ according to the various ground characteristics, surrounding topographical characteristics, repair environment, and design conditions. In particular, in the case of Seoul city, the environments and ground conditions differ according to the area. This study analyzed the earth retaining work cost mainly for the apartment construction project in Seoul and calculated the approximate earth retaining work cost at the project planning stage. A model was developed to predict the cost of earth retaining work that matches the characteristics of Seoul City and predict the construction cost for earth retaining work. This paper presents the predicted earth retaining work cost using a multiple regression model that applies 10 project outlines as independent variables. The error rate of the prediction result of the earth retaining work cost of the apartment construction project in Seoul using multiple regression models was 10.75%.

A Method of Assigning Weight Values for Qualitative Attributes in CBR Cost Model (사례기반추론 코스트 모델의 정성변수 속성가중치 산정방법)

  • Lee, Hyun-Soo;Kim, Soo-Young;Park, Moon-Seo;Ji, Sae-Hyun;Seong, Ki-Hoon;Pyeon, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.53-61
    • /
    • 2011
  • For construction projects, the importance of early cost estimates is highly recognized by the project team and sponsoring organization because early cost estimates are frequently a foundation of business decisions as well as a basis for identifying any changes as the project progresses from design to construction. However, it is difficult to accurately estimate construction cost in the early stage of a project due to various uncertainties in construction. To deal with these uncertainties, cost estimates should be made several times over the course of the project. In particular, early cost estimates are essential process for successful project management. For accurate construction cost estimates, it is necessary to compare cost estimates with actual costs based on historical project data. In this context, case-based reasoning (CBR), which is the process of solving new problems based on the solutions of similar past problems, can be considered as an effective method for cost estimating. To obtain this, it is also required to define the attribute similarities and the attribute weights. However, no existing method is capable of determining attribute weights of qualitative variables. Consequently, it has been a well-known barrier of accurate early cost estimates. Using Genetic Algorithms (GA), this research suggests the method of determining the attribute weight of qualitative variables. Based on building project case studies, the proposed methodology was validated.

A computation model for Resource-based Lifting loads of the lift-cars for super high-rise buildings (초고층 건축물 리프트카 양중계획수립을 위한 자원기반의 양중부하 산정 모형)

  • Han, Choong-Hee;Lee, Jun-Bok;Won, Seo-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.135-143
    • /
    • 2012
  • Constructing super-tall buildings is significantly different from constructing general ones in every technological and managerial aspects. Especially lift-car operations planning and management is one of core parts among various management techniques required during the course of the whole construction process of the super-tall buildings because vertical movements of physical resources enormously affect the efficiency of the construction processes. However, discrepancy between lifting plans and actual lifting operations causes serious efficiency problems. As an effort to solve the problem, this research suggests an improved method of estimating resource-based lifting load. The computing model developed as a result of this research facilitates more accurate computation of the total operation time and the maximum lifting capacity of the lift-cars. Further, this research can be developed as a decision support system for the total lift-car operations management.

A Study on Information Systematization of Detail Drawings for Connectivity between BIM Libraries and Technical Contents based on Information Framework (BIM 라이브러리-기술콘텐츠 연계를 위한 정보프레임워크 기반의 정보 체계화 연구-부분상세를 중심으로)

  • Jo, Chan-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.54-60
    • /
    • 2016
  • Building information modeling (BIM) has the advantage of having been utilized for various scenarios through a single model. Although extracting 2D drawings from BIM is one of the advantages, there are many difficulties when utilized in practical work. Architectural detail drawings are an important factor for expressing interior finishing materials and complicated construction methods, as well as for cost estimations. However, creating detail drawings does not have a standard, and each design company establishes its own detail drawings, so it is hard to share or exchange information in the construction industry. Therefore, this study suggests a systemized method for making detail drawings, and explains how it can be utilized as back data for quantity take-off and construction expenses linked with BIM libraries.

Quantitative Estimaton of Amount of Sediment Loss around Round Revetment for Various Inflow Velocities (접근유속에 따른 호안 주변 매립토 유실량의 정량적 평가 방안)

  • Kim, Dong Hyun;Cho, Jae Nam;Kim, Gyu-Seon;Lee, Seung Oh
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.106-106
    • /
    • 2016
  • 매립공사시 매립토의 유실로 인한 공사기간의 지연, 공사비 증액 등이 발생할 수 있다. 이에 대한 정량적인 예측은 매우 중요하나, 그에 대한 연구는 상대적으로 미비하다. 본 연구에서는 매립토의 유실은 유입된 유사와 호안 표면의 유사가 흐름에 의해 공사구간을 빠져나간 양이라 정하였다. 매립공사에서 유실량의 산정은 매립물량 산정과 직결되며 이는 경제성 부분에서 매우 중요하다. 그러나 국내에서는 경험에 의존한 유실율을 기준으로 매립물량을 결정하고 있는 실정이고, 현장계측으로도 유실량을 정량적으로 판단하기 쉽지않다. 따라서 본 연구에서는 호안 주변의 흐름 특성을 고려한 매립토의 유실량을 정량적으로 평가하기 위한 방안으로 실험적 연구를 수행하였다. 수리실험은 길이 13.0 m, 폭 5.0 m의 직사각형 단면의 광폭 수로에서 수행하였으며 일정한 양의 유사를 유입하기 위해 자체 제작한 유사공급장치를 사용하였다. 매립토의 특성을 고려하기 위하여 일반모래($d_{50}=0.621mm$, SG=2.72)와 안트라사이트($d_{50}=1.547mm$, SG=1.61) 두 가지 유사를 사용하였고, 매립토 유실요인 중 흐름특성에 의해 외부로 유실되는 양을 보다 명확히 규명하기 위해 유사를 유입하기 전과 후의 양을 각각 직접 채취하는 원시적인 방법과 3D 스캔을 통한 방법을 이용하여 평가한 유실율과 비교 검토해 보았다. 두 가지 방법에 대한 상대오차는 최대 3.12%로 나타났다. 흐름조건에 따른 매립토의 유실율은 살펴보면 두 가지 유사 모두 한계유속(Vc)을 넘어서는 순간, 급격히 유실율이 증가하였고, 일반모래는 약 10 % 안트라사이트는 약 30%로 각각 나타났다. 향후 매립토의 특성인자의 영향을 명확하게 구분하기 위해 다양한 매립토를 활용하여 보다 많은 조건하에서 실험을 수행한다면 매립토의 유실량 산정의 정확성을 높일 수 있을 것이라 기대된다.

  • PDF