• Title/Summary/Keyword: 공사관리항목

Search Result 238, Processing Time 0.024 seconds

Principal Items of Construction Management for Developing Construction Guide of Large Spatial Roof Construction (대공간 지붕공사 시공지침서 개발을 위한 중점관리항목 도출)

  • Cha, Min-Su;Lee, Myung-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.197-198
    • /
    • 2017
  • Large spatial construction needs to consider various construction management factors through the construction guide, including high-tech roofing works for creating large space without columns and erecting large spatial structure. However, the domestic large spatial construction relies on overseas construction technologies due to the lack of construction guide of large spatial construction and experience in similar type of project. To improve the problem, we deduced principal items of construction management considering characteristics of large spatial construction as a preliminary study for developing a construction guide.

  • PDF

국가계약법 시행령 및 시행규칙 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.11 s.208
    • /
    • pp.21-28
    • /
    • 2007
  • 내역입찰제도 개선, 적격심사항목 보완, 적격심사 이행관리계획 미준수 업체 제재사유 추가, 정정공고 근거규정 마련 등을 주요 골자로 하는 국가계약법 시행령 및 시행규칙이 제.개정되어 지난 10월 10부터 시행에 들어갔다. 개정된 시행규칙은 1억원 미만 소규모 공사는 물량내역서가 계약서에 포함되지 않아 발주기관의 물량산정 오류시 설계변경이 불가능해 소규모 공사에서 경제적 피해가 많이 발생되어 민원이 제기됨에 따라 우리협회는 재정경제부에 "1억원 미만 소규모 공사도 계약서에 물량내역서가 포함되도록" 건의한 결과 우리협회의 의견이 반영되었다.

  • PDF

A study on the Improvement of the Construction Post-evaluation System in Public Construction Projects (건설공사 사후평가시스템의 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk;Yang, Sung-Hoon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.305-308
    • /
    • 2015
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 국토교통부에서는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 이를 활용할 수 있도록 건설공사 사후평가 시행지침을 기초로 한 건설공사 사후평가시스템을 구축하여 운영 중에 있다. 하지만 사후평가 시행지침의 개정에 따라 입력양식 및 관리항목이 변경되고, 축적된 사후평가 결과정보의 분석기능 등의 부족으로 유사 건설사업 수행시 활용 체계가 미흡한 실정이다. 본 연구에서는 건설공사 사후평가 시행지침의 개정과 분석 및 통계기능 강화를 위해 따라 건설공사 사후평가시스템의 개선방안을 제시하고자 한다. 이를 통해 사후평가시스템의 활용도를 제고하고 유사 공공건설사업 수행시 시행의 효율성을 도모할 수 있으리라 예상된다.

  • PDF

An Analysis on Work Delaying Factors in Apartment Building Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.496-501
    • /
    • 2006
  • Work delay is the one of facts that make the reliability of construction business decrease. Building a causal classification system of work delay and deducing the managemental item for it gives a great competition to the construction industry. It is, however, so rare to study about work delay so far. Therefore, this research analyzed a questionnaire, which is focussing on the public apartment construction, to look into the causal root factors and deduce the work delay factors. Finally, we suggest a major managing point to remove effectively the work delay factors.

  • PDF

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models (BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구)

  • Choi, Hyunjun;Yun, Seokheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.89-97
    • /
    • 2019
  • Recently, BIM has been actively introduced in construction projects. In particular, the introduction of BIM in cost estimating process is expected to improve the accuracy and efficiency of the cost estimate. However, the quantity calculation and BoQ documents preparation process still require manual work. Although the BIM model may support quantification process, it is still problematic that the level of detail of the model must be very detailed to meet the items in BoQ. To address this, it is necessary to analyse the LOD criteria and to analyze the extent to which quantity can be computed according to the level of detail in the BIM model. For the analysis of LOD-based work items, the work item grades were divided into A,B, and C. In this study, the ratio and cost of each item that can be calculated at the LOD level in the detailed design phase are reviewed for each type of work, and the method for improving the quantity calculation using BIM is proposed. In the LOD 300 stage(Detailed design stage), the largest number of items in the class B, the major improvement class, are window and glass work. In addition, the most expensive type of work was analyzed by reinforced concrete work. In the future, it is necessary to suggest appropriate improvement way for items with high item ratios and items with high cost ratios. The results of this study are expected to be used as a BIM-based cost estimation or as basic data for improving the current BoQ system.

The Time Management System Development for Effective Human Resource Management of Construction Industry (건설업의 인력운용 효율화를 위한 시간관리 시스템 구축 방안)

  • Kim, Kwang-Soo
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.339-348
    • /
    • 2009
  • 건설업은 공사수행을 포함한 대부분의 기업 활동이 인력에 대한 의존도가 높은 산업으로서 원가구성 측면에서도 외주비와 재료비를 제외하고 가장 큰 원가항목이 인건비다. 따라서, 건설업의 인력관리 강화는 효율적인 인력 운용과 원가관리를 위해서도 가장 중요한 관리항목이다. 본 연구에서는 건설업에서 체계적인 인력 및 시간관리를 통해 인력운용의 효율을 높일 수 있고, 업무시간 실적 정보에 의해 업무에 대한 성과관리의 정확성을 높일 수 있는 제도운영 및 시간관리 시스템 (TMS: Time Management System) 구축 방안을 소개하였다. 이러한 시간관리는 높은 수준의 인력 및 업무 관리를 가능하게 하고 업무에 대한 우선순위 결정과 적정 시간 분석으로 관습적이고 비효율적인 업무요소를 파악하여 효율적인 인적자원 관리를 하고자하는 건설사뿐만 아니라 프로젝트 산업 군에 속하는 여러 기업들에게 도움을 줄 것으로 기대한다.

  • PDF

Guidelines for Provisional Sum in Public Construction Projects (국내공공공사의 잠정금액(Provisional Sum) 집행기준)

  • Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.157-165
    • /
    • 2005
  • Recently, the term 'Provisional Sum(PS)' has been used in domestic public construction projects especially for civil works. Nevertheless, the guideline for PS has not been clearly stipulated in contract documents or construction-related laws. Due to these ambiguous contract situations, disputes between owners and contractors are surely expected to settle down PS in construction projects. This paper focused on suggesting a guideline to settle down PS in these ambiguous contract situations. The guideline suggested in the paper is expected to be used as a reasonable method to settle down PS avoiding nonproductive disputes about PS in construction projects

Evaluation of agricultural drought vulnerability using Entropy weight method (엔트로피 가중치 기법을 활용한 농업가뭄 취약성 평가)

  • Young-Sik Mun;Won-Ho Nam;Tae-Hyun Ha;Young-Jun Jo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.51-51
    • /
    • 2023
  • 최근 기후의 급격한 변화 및 이상기후로 인해 전 세계적으로 가뭄의 발생빈도가 증가하고 있는 추세이다. 우리나라의 경우 지역·계절별 강수량의 편차로 인해 국지적으로 극심한 가뭄이 발생하고 있으며, 향후 피해는 더욱 증가할 것으로 예측하고 있다. 농업가뭄은 농작물 생육에 따른 수확량 및 수자원 이용에 직접적인 영향을 미치고 있으며, 농업수리시설물의 의존도가 높기 때문에 저수지의 대응능력과 농경지의 수리답 시설이 농업가뭄 대응을 위한 중요한 지표로써 활용되고 있다. 본 연구에서는 수리시설물의 가뭄대응능력과 평야부 농경지의 가뭄빈도를 이용하여 농업가뭄 취약성 평가를 수행하였다. 2015년 이후 매년 가뭄이 발생하는 충청남도 태안군을 시범지역으로 선정하였으며, 논 중심의 농업가뭄을 평가하기 위해 기상영향, 가뭄발생현황, 보조수원능력, 가뭄대응능력 4가지의 관련 항목을 선정하였다. 기상영향, 가뭄발생현황, 보조수원현황 항목은 계수화를 위해 데이터 속성 정보만을 이용하여 가중치를 산정하는 엔트로피 (Entropy) 방법을 적용하였으며, 가뭄대응능력 항목은 농업수리시설물과 농경지 평균 가뭄빈도 분석을 통해 점수화를 수행하였다. 본 연구의 결과는 지역별로 선제적인 가뭄대응 우선순위를 결정할 수 있고, 용수공급의 효율화 등 논 중심의 농업가뭄 대응을 위한 기초자료로써 활용될 수 있을 것으로 판단된다.

  • PDF

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.