• Title/Summary/Keyword: 공사감리

Search Result 198, Processing Time 0.026 seconds

전기설비의 계획과 설계 및 설계감리

  • 이순형;이찬성;문은아
    • Electric Engineers Magazine
    • /
    • v.200 no.4
    • /
    • pp.30-35
    • /
    • 1999
  • 전력시설물의 설계도서는 전기시설물을 시공할 때 전력기기나 배선 등의 배치 및 공사방법의 지시 또는 작업의 순서를 나타내는 역할을 하고 건축주 설계자의 의도를 현장감리자에게 전달하는 중요한 수단이 되는 것이다.

  • PDF

Computer Vision-based Automated Adhesive Quality Inspection Model of Exterior Insulation and Finishing System (컴퓨터 비전 기반 외단열 공사의 접착제 도포품질 감리 자동화 모델)

  • Yoon, Sebeen;Kang, Mingyun;Jang, Hyounseung;Kim, Taehoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.2
    • /
    • pp.165-173
    • /
    • 2023
  • This research proposed a model for automatically monitoring the quality of insulation adhesive application in external insulation construction. Upon case implementation, the area segmentation model demonstrated a 92.3% accuracy, while the area and distance calculation accuracies of the proposed model were 98.8% and 96.7%, respectively. These findings suggest that the model can effectively prevent the most common insulation defect, insulation failure, while simultaneously minimizing the need for on-site supervisory personnel during external insulation construction. This, in turn, contributes to the enhancement of the external insulation system. Moving forward, we plan to gather construction images of various external insulation methods to refine the image segmentation model's performance and develop a model capable of automatically monitoring scenarios with a considerable number of insulation materials in the image.

자료

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.4 s.181
    • /
    • pp.84-97
    • /
    • 1984
  • PDF

A Study on the Improvement of Supervision Works related to Changes in Construction Projects (공공공사의 설계변경과 관련한 감리업무 개선방안에 대한 연구)

  • Kwon Chan-Soon;Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.246-249
    • /
    • 2003
  • we classified major changes into changes based on design deficiency, changes based on the different conditions between job site and contract documents, and changes based on the Owner's need. Then we compare and analyzed applicable regulations for supervision and work performance status at the site, and elicit problems of supervision performance based on mutual contradiction in regulations, bringing up a similar example. Based on the above, we brought up a way of improvement for the elicited problem, comparing and analyzing the laws/contract provisions/instructions related with the changes and the work performance at the jobsite, and verified through interviews with professionals of various fields for the improvement. Finally this study could elicit a way of improvement in the supervision work in conjunction with changes in civil works.

  • PDF