A Study on the Improvement of Supervision Works related to Changes in Construction Projects (공공공사의 설계변경과 관련한 감리업무 개선방안에 대한 연구)

  • Kwon Chan-Soon;Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.246-249
    • /
    • 2003
  • we classified major changes into changes based on design deficiency, changes based on the different conditions between job site and contract documents, and changes based on the Owner's need. Then we compare and analyzed applicable regulations for supervision and work performance status at the site, and elicit problems of supervision performance based on mutual contradiction in regulations, bringing up a similar example. Based on the above, we brought up a way of improvement for the elicited problem, comparing and analyzing the laws/contract provisions/instructions related with the changes and the work performance at the jobsite, and verified through interviews with professionals of various fields for the improvement. Finally this study could elicit a way of improvement in the supervision work in conjunction with changes in civil works.

  • PDF

현장탐방 - 마포 석유비축기지

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.323
    • /
    • pp.56-59
    • /
    • 2017
  • 서울특별시회는 지난 4월 13일 서울시 도시기반시설본부와 합동으로 (주)동보엔지니어링이 시공 중인 '마포석유비축기지 재생 및 공원조성 기계설비공사' 현장을 방문하여 안전 및 품질점검을 실시했다. 이날 품질점검에는 발주처인 서울시 도시기반시설본부 관계자를 비롯하여 감리단장, 기계감리 등이 참석하여 시공현황을 체크했다. 서울시회 김수철 상임부회장은 (주)동보엔지니어링 정광일 대표와 김원근 현장소장에게 "다른 현장보다도 더욱 우수한 공사품질과 체계적인 현장관리, 타 공중간의 소통에 의한 긴밀한 업무협조로 준공까지 공사 진행에 차질이 없도록 솔선수범하여 우수 시공사례 현장이 될 수 있도록 심혈을 기울여 달라"고 부탁했다.

  • PDF

A Study on the Improvement of the Legal System for Digital Transformation of the Construction Inspection Works (건축공사 감리업무의 체계성 강화를 위한 법제도 개선안 연구)

  • Kim, Su-Na;Kim, Young-Jin;Lee, Woong-Jong;Roh, Young-Sook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.375-376
    • /
    • 2023
  • In this study, the legal and institutional status of construction supervising and construction inspector was identified. As a result of examining the definitions of construction supervision terms, focusing on domestic construction-related laws, it was found that there were no consistency between each laws regarding 'terminology' and 'definitions'. In addition, the scope of construction inspector's work continues to expand through the delegation provisions to lower statutes, however, responsibility, authority, and inspection cost are not taken into account properly. In addition in order to introduce digital technology to the smart construction site, which is currently active under way, it is judged that the law and institutional contents need to be improved further.

  • PDF

The Effect of the Performance of Firefighting Construction Supervision Personnel on the Completion Inspection of Firefighting Facility Construction in Apartments (소방공사감리원의 업무수행능력이 아파트 소방시설공사의 완공검사에 미치는 영향)

  • Kim, Sang-Sig;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.43-54
    • /
    • 2019
  • In this study, results of completion inspection are investigated according to the performance of the firefighting construction supervision personnel and according to the necessity of clean air supply in a performance test of the firefighting construction supervision personnel. The results of the completion inspection are measured and the causes of defects in the fire protection facilities after issuance of a completion inspection certificate are analyzed. The findings of this investigation can be used to minimize the risk of apartment fires and improve the performance of firefighting construction supervision personnel. The results of this study are summarized as follows. First, the results of the completion inspection conducted by the firefighting construction supervision personnel varies according to particular occupation. The performance of fire facility supervisors from design companies and fire construction companies were significantly higher than the fire officers. Therefore, it is necessary to employ supervisors who have experience in supervising the construction of apartments, in order to improve the performance of fire construction supervision officers. Second, the analysis of the completion inspection results according to the necessity of a clean air supply for performance tests of firefighting construction supervision personnel showed that the necessity of a clean air supply was significantly higher for fire facility supervisors from design companies and fire construction companies than for the fire officers. In order to improve, the completion inspection should be carried out up until the completion date of the building. In addition, a system needs to be established to ensure that clients are not able to demand that a completion inspection certificate be issued on the construction completion date. Finally, it is found that defects of completion inspection after issuance of a completion inspection certificate affects the result of the completion inspection. The results of the completion inspections conducted by the fire facility supervisors from design companies and fire construction companies were affected significantly less by defects than that of the general contractors. Research shows that faults have occured in firefighting facilities after the issuance of a completion inspection certificate due to the client and the construction company demanding the issuance of the completion inspection certificate.

A Study on the Improvement Contract System of to Prevent Domestic Public Construction Claims (국내의 공공건설 클레임 예방을 위한 계약제도 개선방안 연구)

  • Jung, Min-Jung;Cho, Young-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.239-242
    • /
    • 2007
  • Many contractors have overlooked the construction contract general conditions and it was a bad construction practice. Today, construction project is very complex and complicated. This requires a networked contract document and results in a complicated contract conflict hardly to be solved. Therefore, to reduce the construction dispute and to enhance construction practice, clarification of definition of Owner, several conditions to be revised, insertion of design supervision were suggested in this paper.

  • PDF

Policy Suggestions about the necessity of Separate Order for the Electrical Design (전기설계 분리발주 필요성에 대한 정책적 제언)

  • Nam, Ki-Beom;Yoo, Sang-Bong;Yang, Sun-Sik;Shin, Young-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1450-1451
    • /
    • 2015
  • 우리나라는 지난 '96년 제정한 "전력기술관리법"에 따라 전력시설물 공사에 대한 설계와 감리업무를 실시하고 있지만 "전기공사업법", "정보통신공사업법" 등에서처럼 건축 등 타 분야와의 분리발주를 명확하게 명시하고 있지 않아 발주자, 시공자, 용역업자 등 업계의 혼란을 가중시키고 있어 많은 문제점을 야기시키고 있는 것이 현실이다. 분리발주는 통합발주에 비해 각 공정별 기술력을 확보하고 중소업체와 대형업체간의 공정한 경쟁을 유도함으로써 전력산업 시장경제의 건전성을 확보하는 등 통합발주로 인해 발생시키는 불법하도급, 업계의 혼란, 타 분야와의 경쟁력 약화 등 부정적인 요소를 해결할 수 있는 방안이다. 하지만 법상에서 명확하게 명시하고 있지 않아 모든 전기설계 감리 용역에 대해 분리발주가 되고 있지 않은 것이 현실이므로 거시적 관점에서 전력산업의 미래를 본다면 분리발주가 필요할 것으로 사료된다.

  • PDF

해외건설공사 수행절차(4)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.9 s.218
    • /
    • pp.51-55
    • /
    • 2008
  • 제출된 입찰서는 대부분 공개적으로 개봉하며, 입찰자의 명칭과 입찰금액이 함께 공표된다. 감리자는 입찰서가 산술적으로 정확한지, 요구된 자재 및 입찰문서의 조건에 부합하는지를 검토하고, 입찰자와 면담 등을 통해 입찰서의 평가를 완료한 후 발주자에게 낙찰(계약)수여에 관해 추천을 한다. 발주자는 낙찰된 입찰자에게 낙찰통지서(Letter of Award) 또는 낙찰(계약)의향서(Letter of Intent)를 발급해 시공자가 작업준비를 할 수 있게 한다. 낙찰통지서를 받은 시공자는 공사이행보증서(Performance Bond) 및 선수금 보증서(Advance Payment Bond)를 제출하고, 입찰보증서(Tender Bond)를 반환 받으며, 계약체결을 완료한다.

  • PDF