The Development of Productivity Prediction Model for Interior Finishes of Apartment using Deep Learning Techniques (Deep Learning 기반 공동주택 마감공사 단위작업별 생산성 예측모델 개발 - 내장공사를 중심으로 -)

  • Lee, Giryun;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.3-12
    • /
    • 2019
  • Despite the importance and function of productivity information, in the Korean construction industry, the method of collecting and analyzing productivity data has not been organized. Also, in most cases, productivity management is reliant on the experience and intuitions of field managers, and productivity data are rarely being utilized in planning and management. Accordingly, this study intends to develop a prediction model for interior finishes of apartment using deep learning techniques, so as to provide a foundation for analyzing the productivity impacting factors and predicting productivity. The result of the study, productivity prediction model for interior finishes of apartment using deep learning techniques, can be a basic module of apartment project management system by applying deep learning to reliable productivity data and developing as data is accumulated in the future. It can also be used in project engineering processes such as estimating work, calculating work days for process planning, and calculating input labor based on productivity data from similar projects in the past. Further, when productivity diverging from predicted productivity is discovered during construction, it is expected that it will be possible to analyze the cause(s) thereof and implement prompt response and preventive measures.

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

건축관계 법규에서의 아파트 난방배관 방식 중심 -배관설비 규정에 관한 문제점 및 대책

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.40
    • /
    • pp.50-56
    • /
    • 1993
  • 장인상 대한주택공사 기계설치 1처 과정은 모든 건축물의 고층화가 가속화되고 있는 가운데 배관설비 규정의 내용과 제정 배경을 살펴보고, 규정 적용상의 효과와 문제점을 검토함으로써 공동주택 배관시스템 개발의 방향을 제시한 원고를 (사)공기조화$\cdot$냉동 공학회의 기술자료(제22권 제3호)에 게재, 본지에서는 그 내용중 일부를 요약 발췌 게재한 것임을 밝혀드립니다.

  • PDF

Economic Analsys of Cooling-Heating System Using Ground Source Heat in Multi Family Apartment (공동주택에서 지열 냉난방 시스템 적용시 경제성 분석)

  • Park, Yongboo;Park, Jongbae;Lim, Haesik;Baek, Sungkoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.3
    • /
    • pp.11-18
    • /
    • 2007
  • This paper studied the economical efficiency of ground source heat pump system under various conditions in apartments which have important effects on the housing market. And this study analysed the initial cost increase, saved managing cost and recovery time of initial cost. Analysis result showed as time of heating-cooling and water heating increases, the amount of saved managing cost increased much than the initial construction cost, so recovery time shortened. And as the net area of apartment increases, the recovery time increased. The study of the relation between the installation type and recovery time of initial construction cost showed when heat-cooling system adapted ground source heat and water heating system adapted waste heat, the initial construction cost was recovered most quickly. When Ground Source Heating system was used for the heating-cooling and water heating system, ground source heating system was used for the heating-cooling and waste heat used for water heating, and ground source heating system was used for the heating-cooling and LNG used for water heating, the construction cost increased 72,000, 66,900 and 62,300 won each per $m^2$ compared to the current system (package air-conditioner, heating and water heating using LNG).

  • PDF

Development of a Cash Flow Forecasting Model for Housing Construction (공동주택 공사의 현금흐름 예측 모델 개발에 관한 연구)

  • Jang, Joo-Hwan;Kim, Ju-Hyung;Jee, Nam-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.257-265
    • /
    • 2012
  • Many construction companies are simultaneously carrying out numerous projects in the housing construction industry. It is essential to accurately forecast the cash flow of a project through optimal process management and resource input in order to manage funds rationally and enhance the competitiveness of a company. Current cash flow forecasting methods offer lower accuracy due to a large gap between the revenue and expenditure element. Expenditure elements depends on the real-time changing actual cost for work performed. This research survey was conducted on the actual state of construction management of K company to investigate the problems of cash flow forecasting. To achieve this, the work process and construction management system were integrated to improve the cost management system of K company. To accurately forecast the cash flow of a project, revenue and expenditure elements were displayed in the total cash flow forecast window. This research is expected to assist in the implementation of a system of cash flow forecasting on housing construction by excluding negative elements of revenue and expenditure.

화장실 양변기 배수 및 세정소음

  • 박명식;김태희
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.32 no.10
    • /
    • pp.17-21
    • /
    • 2003
  • 국내 화장실 양변기의 배수 및 세정소음에 관한 실험실 측정결과를 소개하고자 한다. 1989년 대한주택공사에서 조사한 설문조사에 의하면 공동주택에서 외부로부터 들리는 소음에 대한 불만을 조사한 결과, 바닥충격음, 급배수설비 소음, 그리고, 공기전달음의 순으로 나타났다. 이와 같이 급배수시 발생소음은 공동주택 입주자의 주요한 민원중의 하나이다. 급배수설비 소음은 유체의 유동에 의하여 발생하며, 직접 공기중을 전파하여 가는 “공기전달음”과 배관지지 재료 및 구조체 등을 통해 재차 공기중을 전파하여가는 “고체전달음” 으로 구분된다. 여기서 “공기전달음”이란 실내에서 발생한 소리가 구조체를 진동하고 구조체는 인접실의 구조체 주변의 공기를 진동하여 소리가 방사되거나 또는 인접실간에 열려 있는 통로를 거쳐 전달되는 소음을 말하고 “고체전달음”이란 음원이 접하고 있는 건물구조체를 통하여 진동의 형태로 전달되는 소음을 일컫는다. 공동주택에서 배수관은 아래층 천장배관에 해당되므로 배수관에서 발생하는 소음은 아래층으로 직접 전달된다. 이러한 배수설비 소음은 배관재의 종류, 배관스페이스의 구조 및 위치 등에 따라 소음레벨이 달라지게 된다.(중략)

  • PDF

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

Preliminary Checklist For Vertical Extension of Elevator in Apartment Buildings (공동주택의 엘리베이터 수직 확장 공사를 위한 사전 검토항목)

  • Park, Jin-Gu;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.813-816
    • /
    • 2008
  • The increasing number of vehicles owned by individuals in association with the rising income resulted in an acute shortage of parking spaces. We are not only seeing a serious traffic congestion arising from the vehicles parked in the streets adjacent to apartment buildings, but also the social issues of not being able to properly prepare for the emergency such as breakout of fires. Although remodeling of old apartment buildings are being discussed in measures to these problems, the research of parking space expansion is still insufficient. In a survey on remodeling of old apartment buildings, over 30 percent of those who answered cited the parking space as the most needed improvement and said they preferred direct entry as a way to expand parking space among lateral underground expansion methods. The direct entry is a method in which one directly enters the apartment house from the parking lot through the elevator and it requires extended operation of elevators. However, because there are no established systematic processes for elevator extension and works of such kinds are not common, elevator extension works are being done in an inefficient manner. In this research we reanalyzed the processes in order to present the items to be examined for more efficient elevator extension works, and through interviews of experts in the field, we produced the examination items by process from the perspectives of management and technology. This research will be used as a reference material for elevator extension works associated with expanding underground parking lot of apartment buildings.

  • PDF

2014 달라지는 제도 - 건설.중소기업 관련 분야별 제도, 올해부터 이렇게 달라진다

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.282
    • /
    • pp.78-79
    • /
    • 2014
  • 올해부터, 수직증축 리모델링이 허용돼 15층 이상의 공동주택은 최대 3개층 14층 이하의 공동주택은 최대 2개층까지 증축이 가능해지며, 건축 설비 환경 에너지 등의 업체가 참여해 에너지 성능 향상 리모델링 공사에 참여하는 그린리모델링 사업이 본격 추진된다. 또한 선도지역 8곳에서 도시재생사업이 본격화되어 정부 예산 243억원이 집중 지원될 예정이다. 한편, 하도급법 개정으로 하도급 부당특약이 금지되며 지급보증금 미지급 문제로부터 하도급업체가 보호받게 된다. 본지는 올해부터 달라지는 건설 중소기업 관련 각종 제도 개편을 게재한다.

  • PDF

An Analysis on Work Delay Factors in Apartment House Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.159-166
    • /
    • 2007
  • Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.