• Title/Summary/Keyword: 공동주택건설사업

Search Result 148, Processing Time 0.034 seconds

The Analysis of Risk Factors for Apartment Remodeling Feasibility Study (공동주택 리모델링 사업성 평가를 위한 위험요소 분석)

  • Lee Teck-Wn;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.84-92
    • /
    • 2002
  • Recently, apartment-remodeling project is booming since various reconstruction controls are tightened. However, the project has difficulties because management systems used for apartment-remodeling projects are not available. Identifying and analyzing risk factors that are required for risk management, this paper suggests the risk level through paired comparison performed by AHP method and probability assessment for risk level analysis. It is expected that this research will be utilized to minimize the risk of apartment remodeling project and for basic materials to perform the project and helpful to change newly build-oriented construction into sustainable industries. Hereafter using the risk factor analysis data of this paper for this research project, risk management model is considered to be constructed.

법령과 고시 - 청정건강주택(Clean Healthy House) 건설기준 제정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.240
    • /
    • pp.42-47
    • /
    • 2010
  • 국토해양부(장관 정종환)는 두통, 아토피 등 새집증후군을 예방하고 공동주택 입주민들이 건강하게 거주할 수 있도록 “청정건강주택(Clean Healthy House) 건설기준”을 제정하였으며, 올해 12월 1일 이후에 주택건설사업계획승인 신청을 하는 1천세대 이상 신축 또는 리모델링 주택부터 적용한다고 밝혔다. 국토해양부가 청정건강주택 건설기준을 마련한 것은 현재의 "다중이용시설 등의 실내공기질 관리법" 등 새집증후군 관련 규정이 건축자재에서 발생하는 일부 유해물질의 실내공기中농도만을 규제함으로써 새집증후군 문제를 근본적으로 해결하는 데는 한계가 있으므로, 주택의 설계 시공부터 입주후 유지관리 단계까지 주택을 청정하고 건강하게 건설 관리할 수 있는 기준을 제시한 것이다.

  • PDF

Suggestion of Optimum PHC Pile for 15~40 Story Shear Wall Type Apartment Building (벽식공동주택의 층수변화에 따른 최적 PHC말뚝 제안)

  • Lee, Bum-Sik;Park, Jong-Bae;Park, Yong-Boo;Kim, Sang-Yeon;Ha, Young-Bae;Choi, Geong-Ryun
    • Land and Housing Review
    • /
    • v.3 no.2
    • /
    • pp.177-185
    • /
    • 2012
  • LH applies a uniformly standardized PHC Pile to 15~25 stories of Shear-wall type Apartment Building. Recently it is predicted that LH will construct over 30~40 story Apartment Building to keep varied project condition and faces urgent needs to save construction cost for improving its competitiveness. Therefore, structural analysis and design on the upper part and foundation of apartment building were carried out in this study by subdividing story of apartment building, e.g. 15, 20, 25, 30, 35, 40 stories. Reflecting the result of basement analysis and design, the economic evaluations are performed and the optimum diameters of PHC piles are suggested. The result of this paper is considered to be applied usefully for foundation design of LH apartment housing, and the suggested PHC Piles can be used effectively by increasing efficiency and saving the construction cost of foundation.

Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project - (갈등지수 산정에 의한 사업기간 및 비용 예측 - 공동주택 재건축사업을 중심으로 -)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.87-94
    • /
    • 2012
  • The apartment reconstruction projects have the proper functions such as residential environment improvement and the new housing allocation system; however, intention of the projects are distorted by the combination of factors, like failure of relocation of the original occupants and income redistribution, speculation in real estate, sharp rise in housing price, disputation between various interested parties, inadequate system and etc and it makes the projects unable to go well. Disputations and litigations are due to spread of the small conflict. As a result of the problems, it could not going smoothly and that lead to increase or stop the period and cost. This study is to estimate the period and cost using the conflict index so as to prevent and solve the problem which is among the conflict in the reverse functions. The conflict index has estimated focus on the conflict impact and the period and cost has been estimated using an variable independent including the conflict index. Also, estimated the conflict index and estimate of the period and cost are able to succeed with a minimum of disputation and money.

A Study on The Conflict Management for Apartment Reconstruction Project (공동주택 재건축사업의 갈등관리에 관한 연구)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.467-470
    • /
    • 2008
  • Apartment Reconstruction project causes lots of conflicts among stakeholders who don't have professional knowledge on a complicated work-flow In case these conflicts occur, the project might not be well by the damage passed to parties, and so the project cost might be increased, the project might be delayed and hazy as well if the conflicts are not resolved quickly. However, the damage would be indirectly and directly brought to the main parties in apartment reconstruction project because the conflicts aren't managed. Thus, an effective conflict assessment should be preceded, and a process and a system for managing the conflicts should be developed to prevent and settle the conflicts. The purpose of this study classifies the conflicts which are occurred on each phase of the project based on principal facts, and presents the process to develop conflict management system through conflict assessment to each stakeholder.

  • PDF

Feasibility Study on Remodeling Project By Using Real Option Model : Focusing on Apartment House Remodeling (실물옵션을 활용한 공동주택 리모델링 사업성 평가에 관한 연구 - 아파트 리모델링 사례를 중심으로 -)

  • Yeon, JungHoon;Lee, Hyun-Soo;Park, Moonseo;Kim, Sooyoung;Ahn, Joseph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.39-50
    • /
    • 2014
  • After the global financial crisis, domestic construction industry has gone through a rapid recession. This resulted in gradual market shift towards architectural remodeling. Architectural remodeling not only improves residential environment but it has many advantages such as increase of each unit's exclusive area, free space within the horizontal or extension of an annex building, and increase number of household through splitting the household of bigger pyeong, etc. However, in case of the Korean market for apartment remodeling, due to various regulations and problem with business promotion procedures, majority of business is slow despite the figure that remodeling volume is not that small. Also, feasibility study which decides to push ahead public house remodeling business will have a flaw using net present value's law; it has a flaw of not considering properties of each phase of remodeling business and future's uncertainty. Hence, this research will improve the problem of traditional value assessment method of net present value's law. It will also consider one of the real options such as binomial model in order to supplement NPV which is used in current feasibility study. This research was based on real successful cases of public house remodeling and it was possible for feasibility study which was more realistic and valid. This research provided foundation for development of Korean public house remodeling market. There is high anticipation of increasing the validity by improving the problems of current feasibility study and economic efficiency assessment.

A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure - (리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 -)

  • Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.104-115
    • /
    • 2008
  • Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.

Methods for Decision making model in Apartment development projects using on Analytic Hierarchy Process (AHP기법을 이용한 공동주택 개발 사업 의사결정 평가 모델 개발)

  • Kim, Man-Jang;Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.95-103
    • /
    • 2008
  • In recent years, there has been more reconstruction and redevelopment of apartments rather than efforts to consider alternative to extend the life time oh the apartments. It is essential to try to develop ways to adequately maintain and to use the apartment facilities efficiently in order to preserve earth environment and the limited resource. However, lacking research on the effects obtained through remodelling and maintenance have interfered with the vitalizing of the market. The objective of this study is to propose criterions and methods with which to evaluate adequacy of developing method. A survey was performed to investigate important evaluating methods in order to obtain advices that can smoothly progress improve apartment developing method. This study applied AHP(Analytical Hierarchy Process) methods for reasonable dependancy of developing in apartment. Through this study, the flow of apartment market is elevated to reaching the level in advanced nation.

A study of Application to the Marketing positioning and Construction Management in Apartment remodeling (공동주택 리모델링에 관한 포지셔닝 및 건설사업관리 적용 방안)

  • Lee, Jeong-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.124-132
    • /
    • 2005
  • The efficient preservation and improvement of stock buildings including houses have become a significant national issue coming into the 21st century. The increase rate of new house demands have lessened and the efficient management and usage of old buildings have become more important. However, lacking research on the effects obtained through remodelling and the perception that it is less profitable than reconstruction have interfered with the vitalization of the market. Also, the excessive profit rate contractors insist have caused conflict between the residents and contractor and weakened market stability. This research examines the related codes, the strengths and weaknesses of marketing positioning in apartment remodelling a rational method for analyzing each project and the working process. A survey was performed to investigate preferences and priorities between the business methods in order to obtain advices that can smoothly progress each project and improve overall building quality. Through this study, the flow of remodeling market is elevated reaching the level in advanced nation.