• Title/Summary/Keyword: 공급자비용

Search Result 4, Processing Time 0.017 seconds

Cost Function of Congestion-Prone Transportation Systems (혼잡현상을 갖는 교통체계의 비용함수)

  • Mun, Dong-Ju;Kim, Hong-Bae
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.6
    • /
    • pp.209-230
    • /
    • 2007
  • This paper analyzed the social cost function of a congestion-prone service system, which is developed from the social cost minimization problem. The analysis focused on the following two issues that have not been explicitly explored in the previous studies: the effect of the heterogeneity of value-of-travel-times among customers on the structure of cost functions; and the structure of the supplier cost function constituting the social cost function. The analysis gave a number of findings that could be summarized as follows. First, the social marginal cost for one unit increase in system output having a certain value-of-travel-time is the sum of the service time cost for that value-of-travel-time and the marginal congestion cost for the average value-of-service-time of all the system outputs. Second, the marginal congestion cost equals the marginal supplier cost of system output under the condition that supplier compensates the customers for the changed service time costs which is incurred by the marginal capacity increase necessary for economically facilitating an additional system output. Third, the compensated marginal cost is the multiple of the marginal capacity cost and the inverse of system utilization ratio, if the service time function is homogeneous of degree zero in its inputs.

Process Simulation and Economic Feasibility of Upgraded Biooil Production Plant from Sawdust (톱밥으로부터 생산되는 개질 바이오오일 생산공장의 공정모사 및 경제성 분석)

  • Oh, Chang-Ho;Lim, Young-Il
    • Korean Chemical Engineering Research
    • /
    • v.56 no.4
    • /
    • pp.496-523
    • /
    • 2018
  • The objective of this study is to evaluate the economic feasibility of two fast pyrolysis and biooil upgrading (FPBU) plants including feed drying, fast pyrolysis by fluidized-bed, biooil recovery, hydro-processing for biooil upgrading, electricity generation, and wastewater treatment. The two FPBU plants are Case 1 of an FPBU plant with steam methane reforming (SMR) for $H_2$ generation (FPBU-HG, 20% yield), and Case 2 of an FPBU with external $H_2$ supply (FPBUEH, 25% yield). The process flow diagrams (PFDs) for the two plants were constructed, and the mass and energy balances were calculated, using a commercial process simulator (ASPEN Plus). A four-level economic potential approach (4-level EP) was used for techno-economic analysis (TEA) under the assumption of sawdust 100 t//d containing 40% water, 30% equity, capital expenditure equal to the equity, $H_2$ price of $1050/ton, and hydrocarbon yield from dried sawdust equal to 20 and 25 % for Case 1 and 2, respectively. TCI (total capital investment), TPC (total production cost), ASR (annual sales revenue), and MFSP (minimum fuel selling price) of Case 1 were $22.2 million, $3.98 million/yr, $4.64 million/yr, and $1.56/l, respectively. Those of Case 2 were $16.1 million, $5.20 million/yr, $5.55 million/yr, and $1.18/l, respectively. Both ROI (return on investment) and PBP (payback period) of Case 1(FPBU-HG) and Case 2(FPBU-EH) were the almost same. If the plant capacity increases into 1,500 t/d for Case 1 and Case 2, ROI would be improved into 15%/yr.

An Estimation of the Congestion Tolls Considering External Costs in Seoul (외부비용을 반영한 도시내 도로의 혼잡통행료 추정: 서울시를 대상으로)

  • PARK, Chanwoon;KIM, Sungsoo
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.6
    • /
    • pp.520-530
    • /
    • 2015
  • This paper formulates the methodologies to estimate optimal congestion tolls from long-run and short-run perspectives and applies them to the highways of Seoul. An optimal long-run congestion toll is estimated with an optimal volume-capacity-ratio to minimize the total costs which consist of two components: road construction and maintenance costs and traveler costs. By contrast, an optimal short-run congestion toll is estimated with a supply-demand equilibrium which is determined by using a speed-flow function and a disaggregate modal choice model. The results of a long-run analysis for the Seobu urban expressway suggest the optimal volume-capacity-ratio of 1.35 and the optimal congestion toll of 503 Won per automobile kilometer. By contrast, those of a short-run analysis for the Mia-ro urban arterial suggest 1.31 and 420 Won, respectively. Although our results are to some degree dependent on the interest rate and time value assumed, one basic conclusion holds up: the congestions toll tested could generate substantial gains in social welfare if applied to Seoul.

Studies on the Appraisal of Stumpage Value in the Forest Land - With Respect to Kyung-Ju Area - (산원지(山元地) 임목평가(林木平価)에 관(関)한 연구(研究) - 경주지방(慶州地方)을 중심(中心)으로 -)

  • Rha, Sang Soo;Park, Tai Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.52 no.1
    • /
    • pp.37-49
    • /
    • 1981
  • The purpose of the study is to find out the objective method of valuation on the forest stands through the analysis of logging costs that is positively related to timber production. The two forest (Amgog, Whangryoung), located nereby, but forest type, logging and skidding conditions being slightly different, were slected to carry out the study. The objective timber stumpage value were determined by investigating the appropriate timber production costs and profits of logging operations. The main result obtained in this study are as follows: 1. The rate of logging cost in consisting of timber market price is 13.15% in the area of Amgog logging place and 19.48% in Whangryoung. 2. The rate of the other production cost excluding logging cost is 15.36% in the area of Amgog logging place and 28.85% in Whangryoung. 3. The total rate of timber production cost in consisting of the market price is more than 28.51% in the area of Amgog logging place and 48.33% in Whangryoung, 4. Though the productivity of forest land is affected by the selection of tree species, tending, treatments and effective management of forest land, the more important problem is improvement of logging condition. 5. The rate of production cost in timber price is so high that we should endeavore to improve the productivity of labour and its quality, and minimize the difference of piece work per day in accordance to the various site condition. 6. Although the profit of forest industry is related to the period of recapturing investment, it is more closely related to the working condition, risk of investment and continuous change of social investment interest. 7. If the right variables which are related to the timber market, are objectively obtained, the stumpage value of mature forests can be objectively caculated by applying straight line discounting method or compound discounting method in caculating the stump to market price.

  • PDF