• Title/Summary/Keyword: 공공측량

Search Result 99, Processing Time 0.032 seconds

A Study on the Accuracy of GNSS Height Measurement Using Public Control Points (공공기준점을 이용한 GNSS 높이측량 정밀도 분석 연구)

  • WON, Doo-Kyeon;CHOI, Yun-Soo;YOON, Ha-Su;LEE, Won-Jong
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.2
    • /
    • pp.78-90
    • /
    • 2021
  • In order to construct a precision geoid, it has been diversified into land, sea, aviation, and satellite gravity measurement methods, and measurement technology has developed, making it possible to secure high-resolution, high-precision gravity data. The construction of precision geoids can be fast and conveniently decided through GNSS surveys without separate leveling, and since 2014, the National Geographic Information Institute has been developing a hybrid geoid model to improve the accuracy of height surveying based on GNSS. In this study, the results of the GNSS height measurement were compared and analyzed choosing existing public reference points to verify the GNSS height measurement of public surveys. Experiments are conducted with GNSS height measurements and analyzed precision for public reference points on coastal, border, and mountainous terrain presented as low-precision areas or expected-to-be low-precision in research reports. To verify the GNSS height measurement, the GNSS ellipsoid height of the surrounding integrated datum to be used as a base point for the GNSS height measurement at the public datum. Based on the checked integrated datum, the GNSS ellipsoid of the public datum was calculated, and the elevation was calculated using the KNGeoid18 model and compared with the results of the direct level measurement elevation. The analysis showed that the results of GNSS height measurement at public reference points in the coastal, border, and mountainous areas were satisfied with the accuracy of public level measurement in grades 3 and 4. Through this study, GNSS level measurement can be used more efficiently than existing direct level measurements depending on the height accuracy required by users, and KNGeoids 18 can also be used in various fields such as autonomous vehicles and unmanned aerial vehicles.

Improvement on Surveying Performance Evaluation for Public Surveying of Underground Facilities (지하시설물의 공공측량 성과심사 방법 개선에 관한 연구)

  • Jung, Choong Ho;KIM, Chong-Mun;KIM, Ki-Su;CHOI, Yun-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.2
    • /
    • pp.15-23
    • /
    • 2019
  • When the public surveying system was introduced in 1961, large scale surveying performances, such as infrastructure construction work, were dominant. However, due to changes in the environment, most of the current surveying performances focused on small scale underground facilities. The method of surveying underground facilities is as follows: "method of measurement before refilling after burying the pipeline" and "method of using exploration after refilling." There are advantages and disadvantages to each method. It became difficult to obtain the accuracy of the location of the underground facilities due to the fact that there were sections of the pipeline that had not been observed through exploration. Therefore, the 2017 performance evaluation regulations were revised. The revision included the addition of the "Underground Facilities Creation Period," a system that allows for surveys to be evaluated based on actual measurements. However, in this particular field, concerns about the advantages of exploration and the purpose of this study was to investigate the background and purpose of the limitations of the survey have been continuously raised. The purpose of this study was to investigate the background and purpose of the public surveying system and to identify the proportion of underground facilities surveying in comparison to public surveying. This study conducted surveys on the implementers of public surveying and those who did the actual surveying. The researcher has summarized the improvements that incorporate the analysis results and the field comments in the revised performance evaluation regulations in 2017.

A Study on the Site Calibration of Network RTK Surveying (네트워크 RTK 측량의 사이트 캘리브레이션 방안에 관한 연구)

  • Choi, Han Jun;Lee, Byoungkil;Yeon, Sang Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.99-107
    • /
    • 2013
  • With the expansion of the development and use of surveying equipment recently, by the establishment of infrastructure for network RTK surveying of the NGII, network RTK surveying has been widely used in surveying industry. Currently, in public surveying regulations, site calibration with minimum 5 evenly spaced bench marks is needed for using network RTK surveying results as leveling. But the range between and the number of bench marks for site calibration can be varied according to the geoid undulation. In this study, in order to verify this, Incheon area having regular geoid undulation and Taebaek area having irregular geoid undulation are selected as study area and network RTK surveying have been done. Then the accuracy of site calibration by range between and the number of bench marks have been compared. As a result of this study, in order to meet a tolerance of vertical precision (0.1m) that has been set in public surveying regulations, there is a necessity for improving the regulations so that the range and number of bench marks, to be used for site calibration of network RTK surveying, can be applied complementarily.

저가의 후처리 GPS를 이용한 매핑 시스템 연구

  • 임수봉;이봉희
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2003.11a
    • /
    • pp.431-435
    • /
    • 2003
  • GPS측량 방법은 크게 나누어 후처리 방법과 실시간 처리 방법으로 구분되며 후처리 방법은 다시 Static, Stop&Go 및 동적(Kinematic) 방법으로 세분되고 실시간 처리 방법은 DGPS(Differential GPS)와 RTK(Realtime Kinematic) 방법으로 세분된다. 이와 같은 여러 가지 측량법 중 우리나라의 실무에서는 유독 후처리 방법 중의 Static 측량과 실시간 처리방법중의 DGPS 측량이 주로 사용되어 왔는데, 그런 배경에는 여러 가지 원인이 있으나 무엇보다도 가장 큰 원인은 공공측량 작업규정 등의 측량 관련 법규에서 다양한 종류의 GPS측량기법을 제도적으로 인정하지 못함으로 인하여 일반 측량기술자들의 GPS에 대한 인식이 결여된 때문이라 볼 수 있다.

  • PDF

Analysis of Network-RTK(VRS) Positioning Accuracy for Surveying Public Control Point (공공기준점 측량에 적용을 위한 VRS(가상기준점) 방식의 Network-RTK 정확도 분석)

  • Han, Joong-Hee;Kwon, Jay-Hyoun;Hong, Chang-Ki
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.18 no.2
    • /
    • pp.13-20
    • /
    • 2010
  • Currently, NGII(National Geographic Information Institute) provides VRS(Virtual Reference System) service using 44 CORS(Continuously Operating Reference Stations). Since the VRS provides high-precision coordinate in a short time, the users and applications are expected to be rapidly increasing. The accuracy analysis on the VRS service, however, was not sufficiently performed yet. Therefore, in this study, the VRS data is acquired from various circumstances and its accuracy is analyzed. According to analysis, it was concluded that the VRS could be applied to public control point survey. Furthermore, it was found that the PQ(Position Quality) which represents variance of estimated coordinates rather than GDOP(Geometric Dilution of Precision) is more relevant as a factor to determine the accuracy of coordinates. Based on the analysis of data from four manufacturers (TRIMBLE, MAGELLAN, LECIA, TOPCON), it was confirmed that the standard deviations better than 3cm. Therefore, VRS Survey apply to public control point survey.

Automation of Sampling for Public Survey Performance Assessment (공공측량 성과심사 표본추출 자동화 가능성 분석)

  • Choi, Hyun;Jin, Cheol;Lee, Jung Il;Kim, Gi Hong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.95-100
    • /
    • 2024
  • The public survey performance review conducted by the Spatial Information Quality Management Institute is conducted at the screening rate in accordance with the regulations, and the examiner directly judges the overall trend of the submitted performance based on the extracted sample. However, the evaluation of the Ministry of Land, Infrastructure and Transport, the evaluation trustee shall be specified by random extraction (Random Collection) is specified by the sample. In this study, it analyzed the details of the actual site and analyzed through securing actual performance review data. In addition, we analyzed considerations according to various field conditions and studied ways to apply the public survey performance review sampling algorithm. Therefore, detailed sampling criteria analysis by performance reviewers is necessary. A relative comparison was made feasible by comparing the data for which the real performance evaluation was performed with the outcomes of the Python automation program. This automation program is expected to be employed as a foundation program for the automated application of public survey performance evaluation sampling in the future.

Accuracy Analysis of GNSS-based Public Surveying and Proposal for Work Processes (GNSS관측 공공측량 정확도 분석 및 업무프로세스 제안)

  • Bae, Tae-Suk
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.6
    • /
    • pp.457-467
    • /
    • 2018
  • Currently, the regulation and rules for public surveying and the UCPs (Unified Control Points) adapts those of the triangulated traverse surveying. In addition, such regulations do not take account of the unique characteristics of GNSS (Global Navigation Satellite System) surveying, thus there are difficulties in field work and data processing afterwards. A detailed procesure of GNSS processing has not yet been described either, and the verification of accuracy does not follow the generic standards. In order to propose an appropriate procedure for field surveys, we processed a short session (30 minutes) based on the scenarios similar to actual situations. The reference network in Seoul was used to process the same data span for 3 days. The temporal variation during the day was evaluated as well. We analyzed the accuracy of the estimated coordinates depending on the parameterization of tropospheric delay, which was compared with the 24-hr static processing results. Estimating the tropospheric delay is advantageous for the accuracy and stability of the coordinates, resulting in about 5 mm and 10 mm of RMSE (Root Mean Squared Error) for horizontal and vertical components, respectively. Based on the test results, we propose a procedure to estimate the daily solution and then combine them to estimate the final solution by applying the minimum constraints (no-net-translation condition). It is necessary to develop a web-based processing system using a high-end softwares. Additionally, it is also required to standardize the ID of the public control points and the UCPs for the automatic GNSS processing.

A Study on Improvement of Order System for Survey Service (측량용역 발주제도 개선에 관한 연구)

  • Park, Tai-Sik;Han, Soung-Man
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2008.10a
    • /
    • pp.236-242
    • /
    • 2008
  • 설계용역과 통합하여 발주되는 측량용역의 입찰 제도를 보면 계획기관에서 설계예산서를 작성하여 해당 부처 분임경리관을 경유하여 공개경쟁입찰 또는 입찰참가자격제도(PQ) 등으로 발주하게 된다. 이 과정에서 측량용역과 설계용역을 분리하지 않고 측량용역 비를 설계용역비에 통합예산으로 발주 처리하고 있어 측량회사는 설계용역사로부터 불법으로 하도급 받고 있다. 설계용역회사는 엔지니어링등록과 측량업(공공측량)을 동시에 등록하여 용역수주를 하므로 기술력이 부족한 측량용역을 당연히 저가하도급으로 처리하는 커다란 모순이 발생하고 있다. 따라서 저가하도급으로 인한 측량성과의 부실은 건설공사의 부실시공으로 이어져 커다란 공사비손실과 안전 및 유지관리에 큰 문제점을 야기하고 있다. 이와 같은 문제점을 해결하기 위하여 본 연구에서는 측량용역 등록업체의 현황 및 현행 발주제도 방법 등의 분석을 통하여 발주제도의 개선방안을 제안하고자 한다.

  • PDF

Application of Rapid Static Method on Minor Control Point Surveying Using the Global Positioning System (GPS측량기를 이용한 고속스테틱법에 의한 공공기준점 측량 및 응용)

  • 최윤수;김경진
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.15 no.2
    • /
    • pp.195-206
    • /
    • 1997
  • By this time, in order to measure baseline in a few minutes, we must have used expensive dual frequency receiver. Recently, low-priced single frequency receiver have taken place of dual frequency receiver at short base-line by advancement in software development, improvements in geodetic survey receiver system. In this study, according to the observation time and measurement interval, we analyzed differences of each components of baseline by field experiment and we propose the criterion for the minor control point surveying by single frequency GPS receiver.

  • PDF