A Study on the Problem Analysis and Improvement Plan Development of the Construction Cost Saving Policy in the Public Educational Facilities Projects (공공교육시설 건설공사비 절감방안의 문제점 분석과 개선방향에 관한 연구)

  • Ock Jong-Ho;Han Seung-Hyen
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.98-106
    • /
    • 2001
  • The Ministry of Education and Human Resource Development has implemented the Construction Cost Saving Policy since 1998. The National Universities and Regional Education Committee have been required to follow the details of the Policy in constructing educational facilities in their jurisdiction. While the Policy has positive effect on construction cost saving of the entities, it has been criticized from the beginning of the Policy implementation because of its negative impact on project quality, education quality, trust in the public sector construction business, and solvent operation of the private construction companies which build the educational facilities in the entities. The research aims at investigating the pitfalls of the Policy and suggesting more reasonable approaches that can satisfy both the governmental entities and the private companies.

  • PDF

Development of CM Model for BTL Projects in a Public Educational Facilities (공공교육시설 BTL사업의 CM적용모델 개발)

  • Shin, Nam-Kyoung;Woo, Kwang-Min;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.338-341
    • /
    • 2006
  • After the revision of Private Investment Law in January 2005, BTL is introduced to expand the social infrastructures as a major business procedure. Especially, the size of the public educational infrastructure ordered by each city education office is increased by 45% compared to last year, so it is major in BTL Project. However, in the process of practicing BTL Project by now, there are a lot of problems specially in the public educational infrastructure. As a result, this study gives the solutions in the process of BTL Project, the CM models to support the Education Office${\square}{\square}$job and the suggestions for the working scope of the participating construction companies.

  • PDF

A Model for Improving Performance Structure of Build-Transfer-Lease in Small Public Educational Facilities (소규모 공공교육 시설 임대형 민자사업(BTL)의 수행구조 개선모델)

  • Kim, Seung-Sup;Jung, Sang-Min;Koo, Choong-Wan;Koo, Kyo-Jin;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.116-124
    • /
    • 2007
  • It is Increasing that requirements of social infrastructure which includes educational, welfare, cultural facilities for public. Government introduced BTI(Build-Transfer-Lease) as a PFI(Private Financial Initiative) system. This research is about BTL projects in small public educational facilities. Some problems when BTL system is applied to small public educational facilities are identified, and the reason of those problems are examined. This research proposes alternatives in a institutional way and it proposes improvements in contractual structure of consortium when BTL system is applied. Based on reasonable system, it promotes creativeness and effectiveness of a project, and it makes local minor construction companies participate in BTL project without difficulties as mentioned.

A Study on Developing a Management System of Maintenance Historical Data for Effective Maintenance Performance of Building Managers (시설 관리자의 효율적인 유지관리 업무 수행을 위한 건축물 유지관리 이력정보관리 시스템 개발 연구)

  • Lee, Chun-Kyong;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.312-315
    • /
    • 2007
  • This study is aimed at developing a web-based management system of maintenance historical data, for effective maintenance performance and smooth exchange of information and communication between public facilities and public educational facilities managers. The current management state of maintenance historical data and its business process were investigated and analyzed, through interviewing with the persons in charge of managing each facility, by recognizing problems of maintenance historical data management that is able to be applied as a basis to judge facility deterioration and performance. In addition, this study suggests a maintenance historical data system of which DB may be applied to the practical business, by reflecting requests of the persons in charge of managing facilities, setting up the scope of system usage by facility, business phase and level of facility managers, and establishing a maintenance business process system.

  • PDF

분당 신도시 9월 입주에 대비한 관계부처 종합점검 회의자료(건설부장관 주재, 관계부처 차관회의)

  • 한국주택협회
    • 주택과사람들
    • /
    • s.11
    • /
    • pp.88-92
    • /
    • 1991
  • 1. 이 자료는 최초입주하게 되는 2,500여세대 주민들에게 불편이 없도록 공공시설과 생활편익 시설을 차질없이 설치하고자, 분당현지에서 건설부장관이 주재하에 3월 8일 오후 2시 관계기관 차관회의를 개최한 내용임. - 회의일시: 1991.3.8 $14:00{\~}16:00$. - 회의장소: 분당신도시내 토지개발공사 건설현장사무소 . - 참석: 12개기관 국무총리 행정조정실장 경제기획원차관 내무부차관 교육부차관 동력자원부차관 체신부차관 환경처차관 철도청장 경기도지사 서울특별시 부시장 경기도교육위 교육감 한국토지개발공사 사장. 2. 이번 회의에서는 다음 사항들을 중점 논의할 계획이다. - 분당신도시 건설사업의 종합적인 추진대책의 협의. - 최초 입주자에게 불편이 없도록 편익시설$\cdot$기반시설의 적기 설치. $\cdot$ 학교, 동사무소, 우체국, 파출소 등 필수 공공시설. $\cdot$ 도로, 상하수도, 난방 등 도시기반시설. $\cdot$ 병원, 상가 등 생활편익시설.

  • PDF

A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage (교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Chung-Yung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.91-99
    • /
    • 2006
  • The purpose of this study is propose an Artificial Neural Network(ANN) model for the construction estimate of the public educational facility at conceptual stage. The current method for the preliminary cost estimate of the public educational facility uses a single-parameter which is based on basic criteria such as a gross floor area. However, its accuracy is low due to the nature of the method. When the difference between the conceptual estimate and detailed estimate is huge, the project has to be modified to meet the established budget. Thus, the ANN model is developed by using multi-parameters in order to estimate the project budget cost more accurately. The result of the research shows 6.82% of the testing error rates when the developed model was tested. The error rates and the error range of the developed model are smaller than those of the general preliminary estimating model at conceptual stage. Since the proposed ANN model was trained using the detailed estimate information of the past 5 years' school construction data, it is expected to forecast the school project cost accurately.

농어촌연구원 국제융합수리시험센터 현장실습 교육프로그램(HIGH Center ACE+) 체험후기

  • 천재연
    • Water for future
    • /
    • v.56 no.9
    • /
    • pp.47-51
    • /
    • 2023
  • 2023년 1학기(2023년 3월 2일~2023년 6월 20일) 동안 한국농어촌공사 농어촌연구원 국제융합수리시험센터(안산)에서 현장실습을 한것을 바탕으로 후기를 작성하였다. 현재 농어촌연구원은 농어촌 지역개발, 수자원의 효율적 이용과 관리, 농업 신기술 교육, 스마트팜 기술 보급, 친환경 농업, 남북협력 사업 등 농어업인의 환경 개선과 올바른 정책 방향성을 제시하기 위하여 다양한 분야의 연구를 수행하는 공공기관이다. 이번 현장실습을 경험한 국제융합수리시험센터는 1959년에 국내 최초로 수리모형실험을 시작하였으며, 2018년 대형 실험시설이 추가 증축되어 규모나 시설(장비) 측면에서 국내는 물론 세계 최상위 수준의 인프라를 보유하고 있다. 또한 댐, 하천, 해양, 신재생에너지 등과 관련하여 다수의 실험 실적 보유하고 있어 수 공학 분야의 국가경쟁력 강화에 견인하고 있다. 이번 현장실습은 수리실험 이론 교육, 실험장비 교육, 실험실습, 안전교육으로 구성되어 있다. 교육프로그램(HIGH Center ACE+)에 따른 학교에서 배운 전공 이론을 수리실험 분야에 어떻게 적용할 수 있는지 직접 실습하면서 배울 수 있었다. 4개월간 현장실습 교육프로그램에 참여하면서 수리실험 등 수공학 분야의 다양한 경험을 할 수 있었고, 이는 향후 전공과 관련된 직장을 준비하는 데 많은 도움이 될 것으로 생각된다.

  • PDF

A Value-For-Money Model of BTL Projects for Educational Facilities (교육시설 BTL 사업의 투자가치 평가모형 구축)

  • Kim, Jang-Young;Son, Ki-Young;Kook, Dong-Hoon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.87-91
    • /
    • 2006
  • After reformation of 'the law of private investment on social infrastructure' on January 2005, BTL of educational facilities can improve the education circumstance at early stage, however there are trial and error, problems of execution as well. The key of this problem is not only related to whether BTL project is more reasonable, but it also leads to the proper performance of eligibility analysis on BTL. Therefore, it lead to the proper carryout of eligibility analysis on BTL. In order to promote effective BTL project of educational facilities, this study analyzes problems of existing model and creates the evaluation model for solving this problem. In this study, the evaluation model of investment on BTL has more quick ,accuracy and useful effect than previous one, if it is applied on eligibility stage. Moreover, this method could be applied to public building, SOC facilities effectively based on being modified as each characteristics of structure suitably.

  • PDF

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

Development of Maintenance Management System Module in BTL Project for Educational Facilities (교육시설물 BTL 사업의 유지관리 시스템 모듈 개발)

  • Lee, Eun-Dong;Son, Jae-Ho;Kim, Jae-On
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.132-141
    • /
    • 2007
  • According to the public information of the Ministry of Education & Human Resources Development, the construction project of educational facilities from 2005 to 2007 will use BTL (Build-Transfer-Lease) contract. Budget of those projects will be the worth over 13 trillion won. In this research, the estimation standards for the public health maintenance expenses are established which is the part of the operation and maintenance cost in the total BTL project cost. Also, a system core module using the developed standard was introduced in this paper. A comparative analyses were conducted with the several possible estimation case to validate the system developed.