• Title/Summary/Keyword: 공공건설

Search Result 875, Processing Time 0.028 seconds

Analysis of Major Factors of Window Work in Construction Phase Considering Recurrence of Defects in the Maintenance Phase (유지관리단계의 하자 재발생을 고려한 창호공사 시공단계의 중점관리요소 분석)

  • Jeong, U Jin;Kim, Dae Young;Lim, Jeeyoung;Park, Hyun Jung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.653-664
    • /
    • 2021
  • As the construction standards for energy-saving eco-friendly housing have recently been strengthened, the proportion of window work has increased with the demand for high-efficiency housing. Windows have high frequency of use, and there is the potential for many defects to occur depending on the characteristics of construction. According to a government agency's survey of defects in public rental apartment housing, defects in the windows work accounted for the highest portion of complaints received. Accordingly, related previous studies were considered, and it was found that the existing studies in Korea lacked research that reflected the construction characteristics of window work and the importance of maintenance. In addition, existing overseas studies considered both the constructor and the resident's position, considering the cost aspect together, and showed a trend of structuring the relationship between defects and causes. Therefore, this study will analyze the causes of defects that can occur in the construction phase of the windows work, reflect the construction characteristics, and derive major factors that consider the importance of maintenance based on the possibility of recurrence after repairing defects. Ultimately, this research will contribute to preventing defects in the construction phase and reducing maintenance costs by presenting a highly effective defect management plan through selecting the major factors for each defect type that can be intuitively judged by analyzing the causal relationship between defect types and causes.

Development of Verification Method for ADCP (ADCP 유량 측정기기의 검정 방안 개발)

  • Noel Kang;Chi Young Kim;Kyung Min Kang;Yo Han Cho;Chang-Hwan Kim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.305-305
    • /
    • 2023
  • 수문조사기기 검정은 강수량, 수위, 유량 등과 같은 수문자료를 관측하는 수문조사기기가 대상지역의 수문상황을 정확하게 관측하는지를 검사하는 일련의 과정으로 「수자원의 조사 계획 및 관리에 관한 법률」 제12조에 법적 기반을 두고 있다. 검정 대상은 강수량, 수위, 유속, 유사량, 토양수분량, 증발산량, 증발량 측정기기 총 7종이며, 환경부장관으로부터 한강홍수통제소가 검정업무를 위임받고, 한국건설기술연구원과 한국수자원조사기술원이 위탁받아 운영중에 있다. 최근에는 증발산량, 토양수분량 및 유량 측정기기기 등이 첨단화되어 기존 검정 방식에 대한보완 및 신설에 대한 요구가 증가하고 있다. 특히, 유량 측정시 기존에 사용하였던 회전식 유속계는 ADCP(Acoustic Doppler Current Profiler) 유량측정기기로 대체되어 활용률이 2013년 24%에서2021년 67%로 약 2.8배 급격히 증가하였다. 하지만 수문조사기기 검정 관련 고시 내 ADCP에 대한검사방법 및 허용오차 등의 규정이 부재하여 수문조사기기의 검정 공백이 발생하는 등의 문제가 존재하고 있다. 이에 본 연구에서는 ADCP 운영 및 기술 현황, 현행 법령, 국외 사례 등을 검토하여 ADCP 유량측정기기의 검사방법 및 허용오차에 대한 방안을 제시하고자 한다. ADCP 검사방법은 총 5단계로 외관검사, 자가진단 검사, 온도센서 검사, 수심측정 검사, 유량비교측정 검사에 따라 검정을 실시한다. 첫 번째 외관검사시에는 기기 외관과 센서 등 물리적 손상을 점검하고, 두 번째 자가진단 검사에서는 센서 변환 매트릭스 값, 수신부 센서 테스트, RAM/ROM 테스트, 통신 테스트 등에 관한 정상값 산출 여부를 확인한다. 세 번째 온도센서 검사에서는 검증용 온도센서를 이용한 값과 ADCP에 부착된 온도센서 값과 차이를 확인하고 ±2℃초과시 재검사 또는 적절한 조치를 취한 후 다음 단계의 검사를 진행한다. 네 번째 수심측정 검사에서는 수조 내 수심 측정을 확인하여 실제 수심과의 오차를 확인하고 ±1% 초과시 재검사 또는 적절한 조치 후 다음 검사를 실시한다. 유량비교 측정검사에서는 각 기기 간의 평균유량의 상대오차를 평가하는 것으로 ±5%미만에는 합격, ±5이상 ±10%미만에서는 재검사, ±10%이상에서는 공장수리를 권고하도록 하고, 1~5 단계의 검사를 통과한 기기를 대상으로 인증서를 발급하도록 한다. 유량비교 측정검사시에는 매년 ADCP를 사용하는 일반기업 및 공공기관 등이 모여 ADCP의 성능을 상호간 비교하는 'ADCP 기술협력 워크숍'을 확장하여 실시할 수 있다. 각 검사 단계의 허용오차는 USGS 또는 제조사 기준과 2022년 ADCP 기술협력 워크숍 성능검사 분석 결과를 토대로 하였다. 본 ADCP 검정 방안은 향후 ADCP 모델별로 단계별 시범 검토를 통해 세부사항에 대한 제시가 필요하며, 온도센서 검사, 수심측정 검사, 유량 비교측정검사에 대한 허용오차에 대한 타당성에대한 검증 및 검토가 이루어져야 할 것으로 사료된다.

  • PDF

Investigation on Weathering Degree and Shear Wave Velocity of Decomposed Granite Layer in Hongsung (홍성 지역 화강 풍화 지층의 풍화도 및 전단파 속도에 관한 고찰)

  • Sun, Chang-Guk;Kim, Bo-Hyun;Chung, Choong-Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6C
    • /
    • pp.431-443
    • /
    • 2006
  • As part of a fundamental characterization for subsurface layers in Korea, the weathering degree and shear wave velocity ($V_S$) were evaluated from the X-ray fluorescence analyses and the site investigations containing boring and in-situ seismic tests, respectively, for decomposed granite layer in Hongsung. The subsurface layers at Hongsung were composed of 10 to 40 m thickness of weathered layer in most sites. According to the results of weathering degree analyses in Hongsung, it was examined that three chemical weathering indexes such as MWPI, VR and WIP generally increased with decreasing depth. From the in-situ seismic tests, the $V_S$ was determined as the range between 200 and 500 m/s in weathered layer. Based on the $V_S$ and N value at borehole seismic testing sites, N-$V_S$ correlations were established for weathered layer. Furthermore, the relationships of three representative weathering indexes with the $V_S$ and N value indicated that the MWPI, WIP and 100/VR increased linearly as increasing $V_S$ and exponentially as increasing N value.

Comparative Analysis on NIMBY Facility and Location - Suyeong·Nambu·Haeundae Sewage Disposal Plants Cases - (기피시설 입지의 지역별 비교 및 결정요인 분석 - 수영·남부·해운대하수처리장 사례중심 -)

  • Choi, Yeol;Choi, Jae Do
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.491-497
    • /
    • 2006
  • The goal of this research is to explore the opinions of the resident's neighboring within sewage disposal plants, to investigate the differences in accordance with each location of sewage disposal plants, and to examine the determinants to impact on the sewage disposal plants. The multivariate analysis of variance model and regression model are employed as the empirical analysis for this research. The major findings are as follows; as a rule, most of residents represented the sewage disposal plants are essential public facilities. The sewage disposal plants could be positively considered under proper compensation and negotiation, It is found that the satisfaction level against accomplishing process of the sewage disposal plants facilities are very low. In addition, it was revealed that the determinants to impact on the sewage disposal plants showed differently according to each current location of sewage disposal plants. It means that there are no absolutely concrete reasons to oppose the sewage disposal plants and they can be somewhat different by the each local characteristics. Therefore, these findings provide for the policy makers related with the NIMBY facilities including the sewage disposal plants with valuable information.

Research on status and characteristics of wastewater discharger cost in Local Government (국내 기초자치단체 하수도 원인자부담금 현황 및 특성 분석 연구)

  • Jiyeol Im;Dong Hyun Lee;Kyungik Gil
    • Journal of Wetlands Research
    • /
    • v.25 no.4
    • /
    • pp.230-236
    • /
    • 2023
  • The sewage system was continuously distributed as a concept of public service and protection for water system such as wet-land, resulting in deterioration of the management of sewage management institutions. Accordingly, under the leadership of the central government, various sewage policies are being promoted to streamline the management of sewage management institutions. The main points were related to costs, and typical characteristics include wastewater cost and wastewater discharger cost. In this research, the current status and characteristics of the wastewater discharger cost of 71 local governments in Korea were analyzed. As a result, 41 places (57%) were found to be less than 1,000,000 won/m3 to 2,000,000 won/m3, with an average was 1,990,653 won/m3 (median was 1,918,000 won/m3). In addition, the rate of wastewater discharger cost was increased when the wastewater discharger cost was higher stage. The influential parameters of local governments, which were relatively correlated with the wastewater discharger cost, were analyzed as the rate of recovering wastewater cost and financial independence rate. The results of this research could be used as basic data for wastewater discharger cost, and future researches are needed on how to calculate the appropriate level of wastewater discharger cost.

A Study on the Estimation Method of the Repair Rates in Finishing Materials of Domestic Office Buildings (국내 업무시설 건축 마감재의 수선율 산정 방안에 관한 연구)

  • Kim, Sun-Nam;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.52-63
    • /
    • 2015
  • Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.

An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project (초고층 개발사업 추진을 위한 단계별 리스크 요인의 특성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.103-115
    • /
    • 2016
  • The 106 buildings of 200 meters' height or greater were completed around the world in 2015 (CTBUH, The Council on Tall Buildings and Urban Habitat). They beat every previous year on record, including the previous record high of 99 completions in 2014. This brings the total number of 200-meter-plus buildings in the world to 1,040, exceeding 1,000 for the first time in history and marking a 392% increase from the year 2000, when only 265 existed. South Korea recorded three completions during 2015 - improving slightly over 2014, in which it had one. This study focused on the fact that high-rise building development project risks have not reduced in Korea in spite of numerous studies and measures. And it attempted to examine whether existing studies and measures have been presented on the basis of the accurate analysis of existing studies and measures and classify and analyze the characteristics of each phase' s risk factors in the hope that its results would be one reference point as to the measure to prevent high-rise building development project risks in the future. A high-rise building development project is the high risk project as compared with the low-rise project. Because a high-rise development project takes long and is very sensitive to the changing environment. Therefore, in order to succeed the project it becomes necessary to effectively manage the risk involved in the process of the high-rise building development project. The result of this study can be used as the guideline to make the risk management system for the high-rise development project.

Problems Analysis and Revitalization Plan of Urban Development Projects by the Land Readjustment Method (환지방식에 의한 도시개발사업의 문제분석 및 활성화대책)

  • Kim, Hyoung-Soo;Lee, Young-Dai;Lee, Jun-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.37-46
    • /
    • 2009
  • This research will focus on the public agencies, designers, supervisors, building cooperation, and contractor who involved in urban development plan. By understanding the complexity and the priorities in urban development process, all problems of the urban development projects can be solved or improved. These priorities are specified using AHP (Analytic Hierarchy Process). A questionnaire survey is employed to identify the problems of urban development process and the methods of revitalizing urban in this research. Through the survey, 35 issues are drawn out. Factor analysis technique is applied to extract the underlying interrelationships possibly existing. Using latent root criterion and varimax rotation method, 9 factors are extracted(by using 34 issues after deleting 1 issue less than 0.4 of factor loading) These 9 factors named as PIF (Problem Improvement Factor) consist of integration estimation (PIF1), cooperation operation capability (PIF2), contractor corporation capability (PIF3), capital for infrastructure investment (PIF4), misunderstanding of effective land use (PIF5), financial capability (PIF6), obscure goal of project (PIF7), shortage of cooperation expertise (PIFS), administrative procedures (PIF9). PIF 6 is the most important factor and PIF 1 is the most widely effective factor to succeed urban land development projects. It is recognized that administrative office is most responsible for PIF1 cooperation is most responsible for PIF2, 7, 8 and 9; contractors is most responsible for PIF3 and PIF6; administrative agencies is most responsible for PIF4; cooperation and consultants are responsible for PIF5. From findings in this study, some suggestions are proposed for the revitalization methods of urban development projects through the land readjustment method.

A study on the feasibility evaluation technique of urban utility tunnel by using quantitative indexes evaluation and benefit·cost analysis (정량적 지표평가와 비용·편익 분석을 활용한 도심지 공동구의 타당성 평가기법 연구)

  • Lee, Seong-Won;Chung, Jee-Seung;Na, Gwi-Tae;Bang, Myung-Seok;Lee, Joung-Bae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.61-77
    • /
    • 2019
  • If a new utility tunnel is planned for high density existing urban areas in Korea, a rational decision-making process such as the determination of optimum design capacity by using the feasibility evaluation system based on quantitative evaluation indexes and the economic evaluation is needed. Thus, the previous study presented the important weight of individual higher-level indexes (3 items) and sub-indexes (16 items) through a hierarchy analysis (AHP) for quantitative evaluation index items, considering the characteristics of each urban type. In addition, an economic evaluation method was proposed considering 10 benefit items and 8 cost items by adding 3 new items, including the effects of traffic accidents, noise reduction and socio-economic losses, to the existing items for the benefit cost analysis suitable for urban utility tunnels. This study presented a quantitative feasibility evaluation method using the important weight of 16 sub-index items such as the road management sector, public facilities sector and urban environment sector. Afterwards, the results of quantitative feasibility and economic evaluation were compared and analyzed in 123 main road sections of the Seoul. In addition, a comprehensive evaluation method was proposed by the combination of the two evaluation results. The design capacity optimization program, which will be developed by programming the logic of the quantitative feasibility and economic evaluation system presented in this study, will be utilized in the planning and design phases of urban community zones and will ultimately contribute to the vitalization of urban utility tunnels.

A Study on Status of Landscape Architecture Industry with National Statistics (국가통계자료를 활용한 조경산업 현황 연구)

  • Choi, Ja-Ho;Yoon, Young-Kwan;Koo, Bon-Hak
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.5
    • /
    • pp.40-53
    • /
    • 2022
  • This study carried out to provide the methodology and basic status material of using Korean national statistics needed to find the actual state of the landscape architecture industry. The landscape architecture industry was classified into 'Design', 'Construction Management', 'construction', 'Maintenance & Management', 'Materials', 'Research', 'Education', and 'Administration' areas. In each field, business types were systemized and associated in accordance with Korean standard industrial classification and legislations pertinent to construction. Among them, the business types directly defined in the construction related legislations under the Ministry of Land, Infrastructure and Transport were focused on, and the establishment, association, integration, distribution, duplication, and omission of national statistics were analyzed. As a result, the business types of statistical analysis were selected. In order for commonality of statistical items and minimized error of interpretation, semantic analysis was conducted. Finally, the number of registered business types, the number of workers, and sales were selected. Based on them, the analysis framework applicable to fundamental analysis and evaluation of the actual state of the industry was proposed. Actual national statical data were applied for analysis and evaluation. In 2019, the number of registered business types related to the landscape architecture industry was 12,160, the number of workers by business type was 106,296, and the sales by business type were 8,308.5 billion KRW. The number of registered business types and the number of workers had been on the rise from 2017, whereas the sales had been on the decrease. It is required to come up with a plan for industrial development. This study was conducted with the national statistics established by multiple public institutions, so that there are limitations in securing consistency and reliability. Therefore, it is necessary to establish systematic and consistent national statistics in accordance with 「Landscaping Promotion Act」. In the future, it will planned to research application and development plans of national statistics according to subjects including park and green.