• Title/Summary/Keyword: 고층철골구조물

Search Result 16, Processing Time 0.036 seconds

Discrete Optimal Design of Tall Steel Structures subject to Lateral Drift Constraints (횡변위 구속조건을 받는 고층철골구조물의 이산형 최적설계)

  • 김호수
    • Computational Structural Engineering
    • /
    • v.11 no.4
    • /
    • pp.229-237
    • /
    • 1998
  • 본 연구는 횡변위 구속조건을 받는 고층철골구조물의 이산형 최적설계를 위해 효율적인 쌍대알고리즘을 제시하고자 한다. 양함수형태의 횡변위 구속조건을 설정하기 위해 가상일의 원리가 적용되면 고층철골조의 설계변수의 수를 줄여주기 위해 쌍대알고리즘내에 단면특성관계식이 추가된다. 이 알고리즘의 검증을 위하여 횡하중을 받는 네 가지 형태의 고층철골조 예제가 제시되며, 반복과정에서 수렴된 최종물량을 기존의 최적설계방법과 비교해 봄으로써 제시된 알고리즘의 효율성이 검토된다.

  • PDF

A Study on the Behavior of High-rise Buildings Considering Soil-Structure Interaction (지반-구조물 상호작용을 고려한 고층 구조물의 거동에 관한 연구)

  • Kim, Se-Hyun;Park, Sung-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.4
    • /
    • pp.243-251
    • /
    • 2005
  • In the seismic design the pile foundation system of the buildings generally have been modeled to have a fixed end for its convenience and conservativeness. But it is necessary to consider the soil-structure interaction for more reliable design. In this study, the framed tube building and brace tube building with pile foundation system under earthquake were analyzed considering soil-structural interaction by 3 pile foundation modeling methods; fixed-end model, 6 springs model and p-y springs model. And 2 soil conditions were used in analysis. For each cases, displacements, drifts, maximum stress, periods and 1st mode mass participation ratios were compared.

Evaluation of inelastic performance of moment resisting steel frames designed by resizing algorithms (재분배 기법 적용에 따른 모멘트 저항골조의 비선형 특성 평가)

  • Seo, Ji Hyun;Kwon, Bong kwon;Park, Hyo Seon
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.3
    • /
    • pp.361-371
    • /
    • 2006
  • In recent years, to overcome drawbacks related to the aplicati on of classical structural optimization algorithms, various drift design methods based on factores of member displacement participation factors have been developed to size members if they satisfy stiffness criteria. In particular, a resizing algorithm based on dynamic displacement participation factors from the response spectrum analysis has been applied in the drift design of steel structures subjec ted to seismic lateral forces. In this aproach, active members are selected for displacement control based on the displacement participation fa ve members may be taken out and added to the active members for the drift control. The resizing algorithm can be practically and effectively applied to drift design of high-rise buildings however, the inelastic behavior o f the resizing algorithm has not ben evaluated yet. To develop the resizing algorithm considering the performance of nonlinearity as well a s elastic stifness, the evaluation model of resizing algorithm s is developed and aplied to the examples of moment-resisting steel frame, which is one of the simplest structural systems. The inelastic behavior of moment-resisting steel frame designed by the resizing algorithm is also discussed.

Amplitude Dependent Dynamic Properties of Tall Building by Random Decrement Method (RD법에 의한 철골조건물 동적특성의 진폭의존성)

  • 윤성원
    • Computational Structural Engineering
    • /
    • v.17 no.1
    • /
    • pp.34-38
    • /
    • 2004
  • 국내에서 2003년 9월 12일 태풍 매미는 부산 지역에서 많은 재산상의 피해와 아울러 강풍으로 인한 건물의 진동으로 인하여 거주자의 사용성문제가 발생하였다. 또한 신문 보도에 의하면 15층 이상의 고층에 거주하는 시민들은 강풍으로 인한 진동으로 인하여 극도의 공포감에 시달린것으로 알려져 있다. 부산 남구 용호동 L아파트 24층 거주자의 경우는 2003년 9월 12일 오후 10시경부터 아파트 지하 주차장으로 2시간여 동안 대피했다. 천장의 전등이 좌우로 흔들리고 변기 속의 물이 출렁거릴 정도로 아파트가 심하게 진동하였기 때문이다. 아파트의 진동으로 인한 어지러움도 호소하는 경우도 있었다.(중략)

A Work Process Model for a Quality Management in Steel Frame Work (철골공사의 품질관리 업무 프로세스 모델 개발)

  • Kim, Jong-Seong;Kim, Hyoung-Joong;Byun, Eun-Jung;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.150-158
    • /
    • 2007
  • As higher and bigger buildings, steel structure is so for a basic building structure. Quality management of the steel frame work is started from pre plan phase. And classification and relation of works is very important in quality management. The purpose of this study is developing a quality management model for the better quality management in a steel frame work. This model consider a interrelationship of works and $input^{\circ}{\S}utput$ information, and based on the actual condition of current quality management.

Behavior and Failure Mode of Steel Coupling Beams Joint with FBP (FBP가 설치된 철골 커플링보 접합부의 거동 및 파괴모드)

  • Song Han-Beom;Yi Waon-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.17 no.6 s.90
    • /
    • pp.1001-1009
    • /
    • 2005
  • The usefulness of walls in the structural planning of multistory buildings has long been recognized. When walls are situated in advantageous positions in a buildings, they can be very efficient in resisting lateral load. Specially coupled shear wall system is the primary lateral load resisting system of buildings. It is customary to refer to such walls as being 'coupled' by coupling beams. The coupling beams must exhibit excellent strength, stiffness ductility and energy dissipation capacity. To achieve these demands for steel coupling beam, steel coupling beam with Face Bearing Plate(FBP) embedded in the reinforced concrete walls is proposed. A comprehensive experimental test involving 2 steel coupling beam with and without FBP has been performed. Through experimental study, the evaluation of the advantage of that was establish and proposed the failure mode.

Size Optimization Design Based on Maximum Stiffness for Structures (구조물의 최대강성 치수최적설계)

  • Shin, Soo-Mi;Park, Hyun-Jung
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.1
    • /
    • pp.65-72
    • /
    • 2009
  • This study presents a structural design optimizing sizes of high-rise steel plane truss members by maximizing stiffness subjected to given volume constraints. The sizing optimum design is evaluated by using a well-known optimality criteria (OC) of gradient-based optimization methods. In typical size optimization methods, truss structures are optimized with respect to minimum weight with constraints on the value of some displacement and on the member stresses. The proposed method is an inversed size optimization process in comparisons with the typical size optimization methods since it maximizes stiffness associated with stresses or displacements subjected to volume constraints related to weight. The inversed approach is another alternative to classical size optimization methods in order to optimize members' sizes in truss structures. Numerical applications of a round shape steel pipe truss structure are studied to verify that the proposed maximum stiffness-based size optimization design is suitable for optimally developing truss members's sizes.

Risk-Targeted Seismic Performance of Steel Ordinary Concentrically Braced Frames Considering Seismic Hazard (지진재해도를 고려한 철골 보통중심가새골조의 위험도기반 내진성능)

  • Shin, Dong-Hyeon;Hong, Suk-Jae;Kim, Hyung-Joon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.5
    • /
    • pp.371-380
    • /
    • 2017
  • The risk-targeted seismic design concept was first included in ASCE/SEI 7-10 to address problems related to the uniform-hazard based seismic concept that has been constructed without explicitly considering probabilistic uncertainties in the collapse capacities of structures. However, this concept is not yet reflected to the current Korean building code(KBC) because of insufficient strong earthquake data occurred at the Korean peninsula and little information on the collapse capacities of structures. This study evaluates the risk-targeted seismic performance of steel ordinary concentrically braced frames(OCBFs). To do this, the collapse capacities of prototype steel OCBFs are assessed with various analysis parameters including building locations, building heights and soil conditions. The seismic hazard curves are developed using an empirical spectral shape prediction model that is capable of reflecting the characteristics of earthquake records. The collapse probabilities of the prototype steel OCBFs located at the Korean major cities are then evaluated using the risk integral concept. As a result, analysis parameters considerably influence the collapse probabilities of steel OCBFs. The collapse probabilities of taller steel OCBFs exceed the target seismic risk of 1 percent in 50 years, which the introduction of the height limitation of steel OCBFs into the future KBC should be considered.

A Study on the Development of Checklist for Safety Management of Frequently occured Accident Process in Steel Structural Work (철골공사 재해다발공정의 안전관리를 위한 체크리스트 개발에 관한 연구)

  • Hong Hyun-Seok;Yeo Seong-Jin;Jeong Young-Heun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.552-555
    • /
    • 2004
  • As the scale of building construction is larger and more complex, accident is increasing on the steel structure work process. But Safety-Inspection has been carried out through many other checklists in the workplace, it hasn't been used actively. Because checklist wasn't written at the level of specific work and applied scope is Insufficient. So, we must grasp accidental cause about detailed work for making safety management checklist accurately. For this study, we are confining a range to steel structure work of all the building construction. We will classify steel structure process into the detailed work for preventing accident. And we will grasp accidental cause about detailed work for developing the checklist in the future.

  • PDF

A Case Study on the Demolition of Power Plant with Blasting Method for the First Time in Korea (국내 최초 발파공법 적용 발전소 해체 사례)

  • Oh, Ki-Taek
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.87-88
    • /
    • 2023
  • 서해안 최고의 동백정해수욕장과 마량리 동백나무숲은 1970년대 오일쇼크 이후 에너지 자립을 위해 발전소를 건설하면서 사라졌다. 그 당시 준공된 화력발전소는 전력공급 이라는 소임을 완수하고 2021년 부터 동백정의 아름다운 옛 모습 그대로 지역주민에게 돌려 주기위한 친환경 사업으로 발전소 철거공사를 시작, 동백정 복원공사를 추진 하기로 했다. 고층 및 중량물의 건축물 및 구조물을 안전하게 해체하기 위해서는 국내 최초 발전소 철골구조물에 대한 발파·전도공법을 채택 하였다. 철거작업은 고위험 공종으로 참여 주체인 발주자, 설계자, 감리자, 시공자 및 근로자 전 계층의 참여로 사전 위험성평가를 통해 근원의 위험요인 발굴 및 안전대책 수립, 수립된 안전대책 100% 이행을 통해 무재해 준공 달성 하기를 기대한다.

  • PDF