• Title/Summary/Keyword: 고속도로 정책

Search Result 133, Processing Time 0.019 seconds

Development of Truck Axle Load Distribution Model using WIM Data (WIM 자료를 활용한 화물차 축하중 분포 모형 개발)

  • Lee, Dong Seok;Oh, Ju Sam
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.821-829
    • /
    • 2006
  • Traffic load comprise primary input to pavement design causing pavement damage. therefore it should be proceeded suitable traffic load distribution modeling for pavement design and analysis. Traffic load have been represented by equivalent single axle loads (ESALs) which convert mixed traffic stream into one value for design purposes. But there are some limit to apply ESALs to other roads because it is empirical value developed as part of the original AASHO(American Association of State Highway Officials) road test. There have been many efforts to solve these problems. Several leading country have implemented M-E(Mechanistic-Empirical) design procedures based on mechanical concept. As a result, they established traffic load quantification method using load distribution model known as Axle Load Spectra. This paper details Axle Load Spectra and presents axle load distribution model based on normal mixture distribution function using truck load data collected by WIM system installed in national highway. Axle load spectra and axle load distribution model presented in this paper could be useful for basic data when making traffic load quantification plan for pavement design, overweight vehicle permit plan and pavement maintenance cost plan.

Real Option Analysis to Value Government Risk Share Liability in BTO-a Projects (손익공유형 민간투자사업의 투자위험분담 가치 산정)

  • KU, Sukmo;LEE, Sunghoon;LEE, Seungjae
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.4
    • /
    • pp.360-373
    • /
    • 2017
  • The BTO-a projects is the types, which has a demand risk among the type of PPP projects in Korea. When demand risk is realized, private investor encounters financial difficulties due to lower revenue than its expectation and the government may also have a problem in stable infrastructure operation. In this regards, the government has applied various risk sharing policies in response to demand risk. However, the amount of government's risk sharing is the government's contingent liabilities as a result of demand uncertainty, and it fails to be quantified by the conventional NPV method of expressing in the text of the concession agreement. The purpose of this study is to estimate the value of investment risk sharing by the government considering the demand risk in the profit sharing system (BTO-a) introduced in 2015 as one of the demand risk sharing policy. The investment risk sharing will take the form of options in finance. Private investors have the right to claim subsidies from the government when their revenue declines, while the government has the obligation to pay subsidies under certain conditions. In this study, we have established a methodology for estimating the value of investment risk sharing by using the Black - Scholes option pricing model and examined the appropriateness of the results through case studies. As a result of the analysis, the value of investment risk sharing is estimated to be 12 billion won, which is about 4% of the investment cost of the private investment. In other words, it can be seen that the government will invest 12 billion won in financial support by sharing the investment risk. The option value when assuming the traffic volume risk as a random variable from the case studies is derived as an average of 12.2 billion won and a standard deviation of 3.67 billion won. As a result of the cumulative distribution, the option value of the 90% probability interval will be determined within the range of 6.9 to 18.8 billion won. The method proposed in this study is expected to help government and private investors understand the better risk analysis and economic value of better for investment risk sharing under the uncertainty of future demand.

Performance Evaluation of Advance Warning System for Transporting Hazardous Materials (위험물 운송을 위한 조기경보시스뎀 성능평가)

  • Oh Sei-Chang;Cho Yong-Sung
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.4 no.1 s.6
    • /
    • pp.15-29
    • /
    • 2005
  • Truck Shipment Safety Information, which is a part of the development of NERIS is divided into Optimal Route Guidance System and Emergency Response System. This research is for establishing an advance warning system, which aims for preventing damages(fire, explosion, gas-escape etc.) and detecting incidents that are able to happen during transporting hazardous materials in advance through monitoring the position of moving vehicles and the state of hazardous materials in real-time. This research is peformed to confirm the practical possibility of application of the advance warning system that monitors whether the hazardous materials transport vehicles move the allowed routes, finds the time and the location of incidents of the vehicles promptly and develops the emergency system that is able to respond to the incidents as well by using the technologies of CPS, CDMA and CIS with testing the ability of performance. As the results of the test, communication accuracies are 99$\%$ in freeway, 96$\%$ in arterial, 97$\%$ in hilly sections, 99$\%$ in normal sections, 96$\%$ in local sections, 99$\%$ in urban sections and 98$\%$ in tunnels. According to those results, the system has been recorded a high success rate of communication that enough to apply to the real site. However, the weak point appeared through the testing is that the system has a limitation of communication that is caused in the rural areas and certain areas where are fewer antennas that make communication possible between on-board unit and management server. Consequently, for the practical use of this system, it is essential to develop the exclusive en-board unit for the vehicles and find the method that supplements the receiving limitation of the GPS coordinates inside tunnels. Additionally, this system can be used to regulate illegal acts automatically such as illegal negligence of hazardous materials. And the system can be applied to the study about an application scheme as a guideline for transporting hazardous materials because there is no certain management system and act of toxic substances in Korea.

  • PDF