A Case Study on the Application of Modular System to the Superstructure of Floating Architecture in Europe (플로팅 건축 상부시설에서 모듈러 시스템 적용 유럽 사례 연구)

  • Song, Seog-Ki
    • Journal of Navigation and Port Research
    • /
    • v.36 no.10
    • /
    • pp.873-881
    • /
    • 2012
  • This study is about the case study on the application of modular system to the superstructure of floating architecture in Europe. There are many restraints in the onsite construction of floating architecture. Then, various industrialized construction methods are needed to reduce the portion of the onsite construction in floating architecture. Among the various industrialized construction methods, the modular system can be more suitable for floating architecture. At this background, this study analysed the European cases of the application of modular system and classified the types of applied modular system. As a result, this study could classify the three types of modular system, such as, building unit modular, space unit modular and planning concept modular, and define the characteristics of three types by comparing with each other.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.