The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).

A Study on the Risk Examination of the Unit Price of Public Housing Construction Projects (공공주택공사에서의 도급단가 리스크 규명에 관한 연구)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.35-44
    • /
    • 2010
  • Currently, the unit price of public construction projects are not being evaluated appropriately for several reasons. First, the evaluation of the unit price differ per nature of the bidding process and its estimation process. In fact, pricing is determined to meet the total price in turnkey projects and to pass the low bid price deliberation process in unit price projects, and thus, such prices cannot be said to be reasonable prices per public project. After the contract is awarded, however, the prices determined without taking into consideration the characteristic of each bidding process and price estimate process are used for the valuation of progress payment, design changes, and escalation. Furthermore, this is also being applied to other low bid deliberation process as actual public project unit price, thereby affecting other processes as well. In effect, this system increases the risks for both the owner and the bidder who have determined the unit price. This research examines the risk factor and its extent in order to properly manage it in preparation for the future.

Development of an Information System for managing the Service Performances in Public Construction Technique Fields (공공건설기술의 용역실적관리를 위한 정보시스템 개발)

  • Kim, Seong-Jin;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5993-5999
    • /
    • 2013
  • This study presents the information management item and the business process improvement plan managed all construction technique services of Design, Construction Supervision and Construction Management which is ordered and constracted by the public institution in the field of construction and business steps. In addition, it develped the Management System of Construction Technique Service Performances based on improved processes for the Public Agencies and Construction Service Director to register, review and approve the Service Performance Information. As a result, it would be help transparently managed Technical Engineer's work duplication status of Constuction Company, and checked online without having to submit Company performance data by providing objective and reliable information.

System Modeling for Web Service based on Service-Oriented Architecture (서비스 지향 아키텍처를 기반으로 한 웹서비스 시스템 모델링)

  • Lee, Seong-Kyu;Jin, Chan-Uk;Kim, Tai-Suk
    • Journal of the Korea Society for Simulation
    • /
    • v.16 no.1
    • /
    • pp.49-57
    • /
    • 2007
  • Service-Oriented Architecture(SOA) is improving rapidly in IT Environment. Enterprise companies interest in implementation infrastructure based on SOA to adapt quick changes of large and complex distributed environment. SOA is a component model that inter-relates the different functional units of an application, called services, through interfaces and contacts between theses services. In this paper, we studied the concept of the relationship between SOA and standard web service core and therefore, we model the web service based on SOA. We implemented the application and business service architecture using web service that include the XML and SOAP. We confirmed that how the each SOA characters like interoperability, reusability, scalability and flexible business process adapted to web service and present a web service modeling that is maintained the neutrality using loose service coupling through the method of service model process and web service architecture designing methodology based on SOA.

  • PDF

Efficient 5G Ceramic Antenna Manufacturing Architecture using Blockchain and Smart Contracts (블록체인과 스마트 계약을 활용한 효율적인 5G 세라믹 안테나 제조 아키텍처)

  • Sung Yong An;Guy Ngayo;Seng-Phil Hong
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.5
    • /
    • pp.594-609
    • /
    • 2023
  • This research introduces a novel approach to address the complexities of the 5G ceramic antenna manufacturing process through the utilization of a blockchain-based 5G ceramic antenna manufacturing (B-5GAM) architecture. By seamlessly integrating blockchain technology and smart contracts, this architecture enhances transparency, security, and efficiency within the realm of 5G ceramic antenna manufacturing. The impact of applying blockchain to enhance security measures, process efficiency, and overall reliability is evident, not only optimizing the production process but also establishing a robust foundation for future advancements in communication technology. Validation of the B-5GAM architecture was achieved by manufacturing 5G antennas and implementing blockchain and smart contracts through algorithm proposals, confirming their practicality in real manufacturing environments. The results of this study demonstrate the feasibility of employing blockchain and smart contracts in the field of 5G ceramic antenna manufacturing, confirming their potential to enhance manufacturing efficiency and reliability.

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF

국내 대기업들의 IT 거버넌스 분석: 비교 사례 연구

  • Jo, Hang-Jeong;Song, Chan-Hu
    • 한국경영정보학회:학술대회논문집
    • /
    • 2008.06a
    • /
    • pp.816-826
    • /
    • 2008
  • IT 거버넌스(Governance)는 IT 관련 의사결정에 있어서 기업 내부 주체들의 권한과 책임, 의사결정 조직체계와 프로세스, 의사소통 방법, 의사결정 실현 체계, 조정과 통제, 그리고 의사결정에 대한 사후 평가 등을 통틀어 일컫는 말이다. IT가 기업 경영의 필수 인프라로 인식되고, 기업의 경쟁력 제고의 핵심 역량으로 자리잡으면서 IT 거버넌스의 중요성은 점차커지고 있다. 본 연구에서는 국내 주요 대기업들의 IT 거버넌스를 분석하였다. 4개의 국내 대기업들에 대한 심층 인터뷰를 바탕으로, 이들 기업들이 어떤 조직 체계와 과정, 의사소통 체계, 그리고 성과 측정 방법 등을 가지고 IT 관련 의사결정을 하는지를 살펴보았다. 국내 대기업들은 IT 서비스를 전문적으로 제공하는 IT 서비스 계열사를 이용하여 IT 기능을 아웃소싱하고 있었으며, IT 관련 최종 의사결정은 IT 전문 조직이 아닌 비즈니스를 담당하고 있는 경영자들이 하는 것으로 나타났다. 국내 대기업들의 IT 서비스에 대한 계약과 성과 측정은 서비스 수준 협약을 통해 이루어지고 있었으며, 국제적으로 인정되고 있는 프로젝트 관리 방법론과 균형성과 기록표 등도 널리 사용하고 있었다. 이러한 연구는 국내 대기업 내의 IT 서비스 전문 기업들의 미래 역할 정립과 정부 기관이나 공기업들의 IT 거버넌스 체계 확립에 있어서 벤치마킹 근거로 활용될 수 있다. 또한 국내 대기업들의 IT 거버넌스 체계의 효율성 등을 측정하기 위한 기초 자료로 이용될 수 있다.

  • PDF

A Study on Effective e-Trade Platform Design (효과적인 e-Trade Platform 설계에 관한 연구)

  • Back, Seo-Kyoung;Park, Yong-Jin
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2004.11a
    • /
    • pp.240-243
    • /
    • 2004
  • Recently, in the global and digital business environment, we are in need of a single window through which we can exchange market information, make a contract, exchange foreign currency, clear customs and settle accounts. The "e-Trade platform" provides all the stakeholders in international trading circles with these series of trading processes by use of any available information technologies in an effective and seamless manner. The platform collectively includes e-trade infrastructures(e-trade documents repository, e-trade messaging system, e-trade standard documents repository) enabling small and medium sized companies as well as large enterprises to interface with government organizations and global trading institutions. The IT levels of the trading companies are significantly important in terms of benefiting the quality services from the e-trade platform.

  • PDF

Improvement Plan for Domestic Construction Claims & Disputes Resolution Process - Focused on the Construction Bonds - (국내 건설클레임 및 분쟁해결 프로세스 개선방안 - 건설보증을 중심으로 -)

  • Kim, Jong-Seo;Lee Jae-Sub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.181-189
    • /
    • 2005
  • This study analyzed and summarized claims that took place during the past three years in the Korean construction-bonds market. Specifically, this study first examined the trend of construction-bonds claims. Second, the claims categorized according to the types of projects, suretyships, duration of settlement, amount of repayment and so on. Finally, based upon the analyzed results several suggestions, which will improve the efficiency of construction claim process, were provided.