In this paper, to verify the field application of a displacement estimation technique based on the relationship between displacement and strain, static and dynamic field load test are performed on three-span continuous real bridge structures. The superstructure types of the test bridges are IPC girder highway bridge and steel box girder AGT bridge. LVDTs and strain gauges are attached to them; then, the responses due to test vehicle are measured. To obtain the displacement-strain relationship of the test bridges, the bridges are modeled as grillage system with 6 DOFs for the purpose of structural analyses. Static and dynamic displacements, which are estimated using both the calculated displacement-strain relationship and the measured strain signal, agree well with the values measured by LVDT. This study demonstrates that the displacement estimation technique using the strain signal can be effectively applied to the displacement measurement of bridge structures that cross rivers/roads/railways or have high clearance.
Monorail System has many advantages compared with other Urban Lightweight Transit Systems, such as the friendliness of the vehicle's appearance, slenderness of the bridge structures, it's low construction cost and short construction period. So, lots of city governments have reviewed or proposed the Monorail System as the attractive alternative system. And recently, Daegu Metropolitan City Government have chosen the Monorail System for the Urban Railroad Line 3. According to these trends on Urban Lightweight Transit Systems, this paper has introduced the outline of the planning and design of Monorail Bridges. At first, trends of overseas Monorail Bridges have been reviewed and the principal design criteria adopted in the basic design of the Urban Railroad Line 3 for Daegu have been introduced. And next, the methods of planning, design, fabrication of the guideway beams which are made of PSC Beam or Steel Beam have been explained. We hope this paper be helpful for the Engineers who are interested in the Monorail Bridges.
Proceedings of the Korean Environmental Sciences Society Conference
/
2006.11a
/
pp.34-39
/
2006
1. 철도, 도로, 항공, 해운 등 교통수단별 현황을 조사한 결과, 현재까지의 교통정책이 도로교통 우선 위주였기 때문에 철도는 뛰어난 환경성 및 경제성을 가지고 있음에도 불구하고 수송분담율이 비교적 저조한 편이었다. 그러나, 향후 정부의 사회기반시설 구축에 있어서 국가 기간 철도망 확대와 대도시 지하철 및 경량전철 건설을 통한 도심철도망과 간선철도망의 연결 등을 통하여 철도의 이용이 훨씬 용이해질 것으로 보이며 이에 따라 철도의 이용률도 크게 상승할 것으로 예상된다. 2. 교통수단별 일반현황은 다음과 같다. 1) 철도교통은 여객수송량이 다소 증가하고 있는 추세였는데, 2004년 KTX의 개통으로 인하여 여객수송량이 급증하였으나, 화물수송은 약간 감소하는 추세이다. 2) 도로교통은 공로의 경우 이용량이 크게 감소하고 있으나, 자가용의 경우에는 승용차의 급증에 의하여 도로의 분담률이 증가하고 있다. 그러나, 도로망의 확충이 자동차의 증가량을 따르지 못하는 것과 자동차가 도시에 밀집됨에 따른 교통체증에 따라 자가용 차량의 1일 평균 주행거리가 짧아지는 등 수송량이 크게 증가하지는 않고 있다. 3. 각 교통수단별 환경경제성을 조사한 결과는 다음과 같았다. 1) 단위수송량당 에너지 소비율은 여객의 경우 철도가 75.97kcal/인 km에 불과한 반면에 버스는 415.43, 택시는 1,192.24kcal/인 km에 달하여 각각 철도의 5.5배 및 15.7배나 많은 에너지를 소비하는 것으로 나타났다. 화물의 경우에도 철도는 105.98kcal/톤 km에 불과한 반면에 도로는 1,674.21kcal/톤 km에 달하여 철도의 무려 15.8배의 에너지를 사용하는 것으로 나타나, 철도가 에너지 효율성 면에서 도로 교통수단보다 월등히 앞서는 친환경적이면서 경제적인 교통수단임을 알 수 있다. 2) 도로와 철도의 단위수송량 당 CO의 배출량은 도로가 1,531.2kg/백만인 km로 철도의 167.4kg/백만인 km에 비하여 9배나 되었다. 그러나, 탄화수소의 경우는 도로가 216.5kg/백만인 km으로 철도의 68.0kg/백만인 km의 3배를 넘는다. 미세먼지의 경우는 도로가 철도보다 약간 더 많은 수준이었으나, NOx와 $SO_2$는 오히려 철도가 오히려 약간 더 높게 나타났다.
Traffic congestions in local cities have been getting worse since 1990s, so many local governments have considered the introduction of an LRT system. So far, there is no city operating the LRT due to social environments, financial reasons, feasibility and so on. But still many cities have examined LRT or started the construction. Until now, more than 30 cities are constructing LRT or planning the introduction of LRT and it becomes 96 routes, approximately 700km. With the support of MLTM, KRRI has developed automatic LRT system with rubber-wheels, K-AGT as a result of "LRT system technology development project" from 1999 to 2005 by investing 50.32 billion wons(the public 37, the private 13.32) and finished running durability test of 100,000km at Kyeong-san test line. Currently, two trains, coupled two cars respectively have running and signaling tested. K-AGT was appointed to supply for an extension line at Busan Subway Line 3(Minam-Anpyeong section) with 17 trains(six-unit car) 102 cars. However, except for Minam-Anpyeong section, other cities such as Uijeongbu, Yongin, Daegu(Line 3) and Kwangmyeong decided to use the foreign systems, not to use the product, a result of national R&D project. This results in a huge waste of foreign currency and it is expected to require much additional cost for maintenance. If local governments use the products of national R&D projects, many national benefits such as reducing imports and protecting home industries could be expected, therefore in this paper, some plans to encourage to use products of national R&D projects were dealt with.
The purpose of this study is to develop conflict management considering justification of planning decision by public involvement (PI) in the context of Korea as an approach to prevent conflicts for railway projects and to achieve consensus building between public and governments. In this study, to evaluate the effectiveness of conflict management in the process of railway planning, we examined the before and after survey on the light rail transit (LRT) planning that was previously conducted. We first conducted estimation on the causal relationships among factors related to acceptance of LRT planning by structural equation model. The estimation results show that conflict management activities and acceptance are positively related. We also discussed as follows: the level of recognition of railway project influences positive effects regardless of conflict management activities, the most important factor with respect to the acceptance is awareness for planning necessity.
Today, ever growing population density in Seoul or areas near Seoul is problematic. To overcome the problem, the government tries to construct so called, 'New-towns'near Seoul to spread out the population over larger areas. But building new-towns created another problem of traffic between Seoul and New-towns. It can be solved if more public transportation systems such as urban railroads are constructed. In order to succeed in urban railroad construction, we have to make a perfect plan through in depth research on characteristics of the urban train and the construction site. In this paper, we propose a method to design the Decision Support Systems(DSS) using Geographic Information Systems(GIS) and Spatial Analysis for the planning of urban railroad construction.
In this paper, the inductive power collector using electromagnetic induction for vehicle such as the electric railway vehicle system is suggested and some ideas for power collector design to improve the power transfer performance are presented. The inductive power of secondary part is related to amount of linked flux to secondary part by the length of air-gap, which is expected by such a system parameter as mutual inductance. This paper will study for the transfer characteristic of power from input to output and equation including mutual inductance.
Light Rail Transit is system that offer target Performance and function because various sub-system such as vehicles, power supply, signaling, communication, mechanical, track, civil is consisted as large complex system. Light Rail Transit and the complex system of safety, reliability to be a behavior, and target performance and function properly to system's configuration, design, manufacture, installation and test verification, through operations system requirements to accurately describe what It is more important. With this study, light rail system KSX ISO/IEC 15288 system life cycle process by applying engineering techniques utilizing light rail system in the early stages of construction from the concept, design, production, operation, maintenance and end-use to the disposal stage throughout the entire life cycle, from the beginning of construction until the end of construction of the stakeholder to define requirements, analyze the introduction of the system developers and system requirement of those who wish to be described accurately by selecting the best system and system requirement in order to achieve their purpose.
Journal of the Korean Society of Systems Engineering
/
v.8
no.1
/
pp.9-19
/
2012
The Light Rail Transit Project is a large scaled project which takes several years in building a system. After construction, LRT system is operating for several tens of years. For these characteristics, the right application of systems engineering to LRT project greatly effects the project success. In this paper, we present systems engineering application model to LRT project i.e. SELRT which include systems engineering technical process, core technology management process, project support process. SELRT also has a module for the exchange of outputs in SE tool and PM tool. Systems engineering processes in SELRT mainly base on ISO/IEC 15288. In future, we expand the range of SE processes and improve the usability in SELRT. We expect that this model will contribute to improve the efficiency in LRT project and to success the LRT project.
Journal of the Korean Society of Systems Engineering
/
v.7
no.2
/
pp.13-19
/
2011
A LRT(Light Rail Transit) is one of the Future Urban Railway Development Project. The project's goal is to reduce a transportation congestion in the center of the city. New transportation is intensely required in order to overcome a limit of the ground transportation that is the existing public transportation, A LRT(Light Rail Transit) construction project to be based on an unmanned driving system is the large composition system that a vehicle, a signal, communication, electric, track etc. were organically integrated as echo-friendly urban transportation systems. It also put a huge budget, which is a large-scale infrastructure projects. It is international trend that Light Rail Transit projects apply a technique in System Engineering for a schedule, cost, quality elevations, and to approach in viewpoints of life-cycle from initial construction steps to operation, abolition. This paper intends to analyze RAM requirements taking into consideration ISO/IEC 15288 throughout life-cycle from concept, design, manufacture, operation and maintenance to the final phase, decommissioning, and the study seeks to suggest directions of efficient use to domestic LRT projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.