A basic study on improvement of Disasters Prevention System using space information from 3D CAD - focused on Multiple-use Facilities - (3D CAD 공간 정보를 활용한 방재 시스템 개선에 관한 기초 연구 - 다중이용시설물 중심으로 -)

  • Lee, Myoung-Hoon;Ahn, Byung-Ju;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.189-193
    • /
    • 2009
  • As large-scale buildings, skyscrapers, and multi-purpose buildings recently increase in numbers dramatically the internal space of such buildings becomes more and more large and complicated accordingly. The Multi-purpose buildings are increasing rapidly in number, and concerns over the evacuation process in case of fire emergency are also increasing. However, A controller who is responsible for visitor's safety makes a decision about measures for visitor safety in human based decision making process. Many potential accidents that are caused by human error lurk in results of the process. The accidents can be decreased by changing the decision making process from human-based into technology-based. Through this study, the way to improve current disasters prevention system is presented and it can also improve shelter inducement methods effectively. SICS(Spatial Information Control System) which is being studied in other research is used as the tool for improvement.

  • PDF

Extension of Korea Standard of the CAD Drawings in Construction CALS/EC to Adopt the Port Field (항만분야 수용을 위한 전자도면 작성표준 확장 개발)

  • Moon, Jin-Seok;Han, Choong-Han
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.957-967
    • /
    • 2013
  • While a vast number of cad drawings are produced in the life cycle of construction projects from the planning, design, and construction phases to the maintenance and control phases, the creation and distribution of non-standard drawings make it difficult for the construction parties to communicate with one another and to recycle, maintain, and control drawings by project phase. The Korea standard of CAD drawing in construction CALS/EC, which stipulates the standard for construction CAD drawings, is based on roads, rivers, and railways in line- and unit-based structures, allowing the creation of standardized CAD drawings. Such standard, however, cannot be easily applied to construction projects with multiple facilities like harbors, housing sites, or lands consisting of surface forms. In particular, port field consist of complex docks and amenities located in a certain coastal area based on multiple objectives. They also contain the concept of housing sites, like background land, and are composed of various civil engineering facilities, construction facilities, and port field, so that the existing CAD drawing standard cannot be easily implemented. Therefore, the purpose of this study is to maximize the efficiency of the information related to drawing information and to ultimately support smooth information exchanges in construction design by conducting a development research on the expansion of the CAD drawing standard that meets the needs of port field.

(주)정림건축의 전산조직과 운영

  • 손병덕
    • Computational Structural Engineering
    • /
    • v.4 no.3
    • /
    • pp.48-50
    • /
    • 1991
  • 산업전반에서 전산화와 자동화의 추세가 점차로 가속화되고 있는 이 시점에서 건축설계를 전문으로 하는 업체에서의 COMPUTER의 응용과 실무에서의 적용은 이제는 전혀 새롭다거나 놀랄만한 일로 보여지지 않는 시기가 도래하였다고 보여지며, 현재는 누가 얼마나 현실적인 사용에 바탕을 둔 응용 및 개발전략으로 생산성의 향상과 업무의 효율화를 꾀하고 있는가 하는 것이 중요한 문제로 부각되어지고 있다. 주지하는 바와 같이 건축설계를 전문으로 하는 업체에서의 전산조직은 CAD와 구조계산, 견적을 그 주축으로 하고 있으며, 가장 많은 투자와 개발이 이루어지고 있는 분야이기도 하다. 따라서 본 회사의 전산조지과 그 운용에 관한 논의는 위의 각 분야별로 사용장비 및 인원구성, 현재의 이용현황, 향후 투자 및 개발계획 등을 간략하게 소개하는 것으로 대신하겠다.

  • PDF

A Protocol Analysis on the Characteristics of CAD Modeler to Aid Architectural Massing Education (건축형태구상교육을 위한 3차원 CAD모델러의 특성에 따른 프로토를 분석연구)

  • Hong S.-W.;Lee K.-H.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.10 no.4
    • /
    • pp.293-302
    • /
    • 2005
  • The research focused quantitative comparisons of protocols occurring in the architectural massing process using two different tools, three-dimensional(3D) modeler and traditional design tools, to aid architectural massing education. Through the protocol analysis from some experiments, the research identified the following conclusions: 1) Usage of traditional tools produced much higher protocol rate in proposing solution, evaluating proposed solution, explicitness of strategies. This result seemed to be from convenience of traditional tools causing faster visual cognitive cycle. 2) Usage of 3D modeler produced much higher protocol rate concerning attempts of making design vocabulary. The result indicated 3D modeler has relatively effective functions for mass generation and orientation, however it still has some weaknesses on display interface which cause designer's lower idea generations compared to traditional design tools.

3D Digital modeling Method for Concept Developing Process in Architectural Design & Drawing (설계 및 도면작성단계에서의 디지털모델링방법연구 I)

  • Koh, In-Lyong;Dong, Jae-Uk
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.1 no.1
    • /
    • pp.39-45
    • /
    • 2001
  • The purpose of this study is to suggest the possibility which can use as instrument of design by CAD system. And it proposes how makes 3D object model through 2D Drawings in Design process. This study has review the 'Study Drawing' in design process, and application method of CAD as the Architectural Design Integration System. The Architecture can work in ani of the traditional 2D representations as well as in 3D and immediate visual feedback of his work in isometric and perspective projrctions.

  • PDF

A Study on Obstacle Reasons of BIM in Construction Phase (시공단계에서의 BIM 도입 저해요인에 관한 기초연구)

  • Kim, Ji-Sun;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.61-62
    • /
    • 2011
  • Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.

  • PDF

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

A basic study 3D model advancement method for nuclear power plant (원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

A Strategy to Improve Customer Service for Apartment Building Units (GIS를 기반으로한 실시간 실내공간관리 시스템 개발 - COEX Test Bed -)

  • Na, Kido;Lee, Gwang-Gook;Kim, Whoi-Yul;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.269-272
    • /
    • 2009
  • The environment of Ubiquitous in terms of improvement is being expanded to various fields and time enabled system. Thus, a real-time spatial information management system has been developed by integrating a human movement detection system into a SICS(Spatial Information Control System) engine that can integrally manage inside spatial information extracted from 3D CAD and outside spatial information of GIS. The add-on program was developed to extract spatial information necessary for the SICS engine from 3D CAD information, and a human movement detection system was developed. Test bed was operated for 2weeks and indoor human flow information was found out by zone. Also, the direction of future research was decided through a test bed.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF