• Title/Summary/Keyword: 건축 정보 모델링

Search Result 179, Processing Time 0.029 seconds

플로팅 건축설계에서의 BIM기반 통합설계 프로세스 적용 가능성에 관한 연구

  • Jeon, Gi-Hyeong;Kim, Jeong-Gil
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.10a
    • /
    • pp.302-304
    • /
    • 2012
  • 수해양공간이라는 특수한 환경에서 이루어지는 플로팅 건축은 외부환경인자 증가 및 복잡한 공정으로 인한 정보전달 및 의사결정을 위한 협업이 중요하다. 협업 중심의 BIM기반 통합설계프로세스의 적용은 플로팅건축 설계를 효율적으로 진행하게 할 것이다.

  • PDF

BIM-Based VE Proposal Management Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.

  • PDF

Case studies on BIM-based architectural environment performance analysis (건축정보모델링(BIM)기반 건축 환경 성능 사례 분석)

  • Moon, Hyun-Jun;Choi, Min-Seok;Park, Jin-Woo;Ryu, Seung-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1412-1417
    • /
    • 2009
  • BIM(Building Information Modeling) is considered a new paradigm and a powerful method in building design, construction and maintenance. However, it is still hard to implement environmental performance analysis using BIM in design stages. This study aims to reveal practical problems and evaluate interoperability between building design information and performance analysis with case studies. Three case studies are performed using two environmental analysis programs (IES/VE, EnergyPlus) and BIM-based architectural design programs (Revit, GoogleSketchUp) in this paper.

  • PDF

A Study on the 'Level of Information' in BIM-based Design Process (BIM 기반 설계프로세스의 단계별 정보 수준에 관한 연구)

  • Koh, In-Lyong;Kim, Myoung-Keun;Min, Young-Gi;Chung, Tae-Seung
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.3
    • /
    • pp.111-117
    • /
    • 2012
  • The study presents the way to maximize the functionality and the effectiveness of the BIM model, and the type of information used in the overall process of construction projects. If the designing process is the generator of architecture information, then the step-by-step BIM model created in the process is the container for formation and property information. BIM written rules and methods are proposed in order for the architectural BIM model structured in the early stages of designing to go through a process of review and collaboration, and to be seamlessly linked to the basic designing steps. Accordingly, the BIM model construction and operation strategy suggested will substantially reduce the work of designing, structuring, and collaborating, that will be shared and linked.

3D Architecture Modeling and Quantity Estimation using SketchUp (스케치업을 활용한 3D 건축모델링 및 물량산출)

  • Kim, Min Gyu;Um, Dae Yong
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.7 no.6
    • /
    • pp.701-708
    • /
    • 2017
  • The construction cost is estimated based on the drawings at the design stage and constructor will find efficient construction methods for budgeting and budgeting appropriate to the budget. Accurate quantity estimation and budgeting are critical to determining whether the project is profitable or not. However, since this process is mostly performed depending on manpower or 2D drawings, errors are likely to occur and The BIM(Build Information Modeling) program, which can be automated, is very expensive and difficult to apply in the field. In this study, 3D architectural modeling was performed using SketchUp which is a 3D modeling software and suggest a methodology for Quantity Estimation. As a result, 3D modeling was performed effectively using 2D drawings of buildings. Based on the modeling results, it was possible to calculate the difference of the quantity estimation by 2D drawing and 3D modeling. The research suggests that the 3D modeling using the SketchUp and the calculation of the quantity can prevent the error of the conventional 2D calculation method. If the applicability of the research method is verified through continuous research, it will contribute to increase the efficiency of architectural modeling and quantity Estimation work.

A System Dynamic for Investigating to Use of Building Information Modeling (BIM) for Hanok Construction (시스템 다이내믹스 기반 한옥건축의 BIM 접목 활성화 방안 연구)

  • Seo, Seung-Ha;Bang, Yei-Dam;Hyen, Ju-Hwan;Yu, Chaeyeon;Lee, Donghoon;Kim, Sungjin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.3-11
    • /
    • 2023
  • Building information modeling (BIM) can help to visualize and manage the building-related information at the object-based level, and it is possible to help link the tasks in the network of Hanok construction. While many studies have significant interest in using BIM for modern construction, there is only few studies to observe the use of BIM for traditional construction, commonly called Hanok construction in South Korea. Hence, the main goal of this study is to develop a system dynamic model for investigating how the BIM can be widely used for Hanok construction. To this end, this study identified the factors influencing the BIM uses for the Hanok construction, developed a causal loop diagram (CLD) to investigate the interrelationships among the factors, and provided a final model based on the mathematical definitions. Based on the scenario analysis, it is demonstrated that the support to building Hanok and education cost for BIM positively influence activating and using the BIM for the Hanok construction. Based on the dynamics of the factors identified in this study, it is important to consider expanding support for Hanok construction and education cost for BIM to successfully integrate and utilize BIM in the construction industry.

3D Digital Restoration of Traditional Wooden Building Using Parametric Modeling (Parametric 모델링 방식을 이용한 전통목조건축물의 3D 디지털 복원)

  • Lee, Kang-Hoon;Cho, Sae-Hong
    • Journal of Korea Multimedia Society
    • /
    • v.12 no.8
    • /
    • pp.1164-1171
    • /
    • 2009
  • This paper proposes an efficient implementation way of traditional wooden building using Parametric modeling method which uses the relations of numerical value ratio between building materials. Building structures and order of construction for Geunjungjeon of Kyuungbok Palace is digitally implemented proving the efficiency of the suggested proposal. Although the existing digital modeling methods for traditional wooden building emphasize the exterior modeling of the building, our modeling method constructed numerous wooden materials and arranged those pieces orderly so that people can see the interior structures of the building which usually is beyond one's vision. The suggested Parametric modeling method, Multi-Object Texture Mapping, Physical Camera Restoration, and GI Renderer for implementing Geunjungjeon of Kyuungbok Palace can be practically used for digital implementation for other traditional wooden buildings.

  • PDF

Basic Study about BIM Introduction by Awareness Change Analysis in Civil Engineering (엔지니어링업체 인지도 변화분석을 통한 토목분야 BIM 도입 기초연구)

  • Seo, Myoung-Bae;Song, Jong-Kwan;Yang, Sung-Hoon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1207-1208
    • /
    • 2012
  • 최근 건설분야에 화두가 되고 있는 건축정보모델링(BIM, Building Information Modeling)은 건설산업의 패러다임 전환을 통한 새로운 성장동력의 미래로 부각되고 있으며, 건축분야는 서울시, 용인시, LH공사 등 BIM을 활용한 공공 발주사례가 확산되는 추세다. 토목분야는 건축보다 기간이 길고 비용이 크며 이해당사자가 너무 다양해서 발생하는 정보의 양이 방대할 뿐만 아니라 활용분야를 다양화하지 못하고 이를 뒷받침해주는 제도나 지침의 부재 등으로 인해 건축분야보다 BIM도입이 늦어지고 있다. 이에 토목분야에서 활용할 수 있는 3차원 형상정보와 관련된 정보모델표준, 지침, 가이드를 개발하기 위해 BIM 적용시 가장 효과가 크고 도입의지가 강한 엔지니어링사의 BIM에 대한 인지도 분석을 통해 토목분야 BIM 도입을 위한 기초자료로 활용하고자 한다.

3D Thermo-Spatial Modeling Using Drone Thermal Infrared Images (드론 열적외선 영상을 이용한 3차원 열공간 모델링)

  • Shin, Young Ha;Sohn, Kyung Wahn;Lim, SooBong;Lee, Dong-Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.4
    • /
    • pp.223-233
    • /
    • 2021
  • Systematic and continuous monitoring and management of the energy consumption of buildings are important for estimating building energy efficiency, and ultimately aim to cope with climate change and establish effective policies for environment, and energy supply and demand policies. Globally, buildings consume 36% of total energy and account for 39% of carbon dioxide emissions. The purpose of this study is to generate three-dimensional thermo-spatial building models with photogrammetric technique using drone TIR (Thermal Infrared) images to measure the temperature emitted from a building, that is essential for the building energy rating system. The aerial triangulation was performed with both optical and TIR images taken from the sensor mounted on the drone, and the accuracy of the models was analyzed. In addition, the thermo-spatial models of temperature distribution of the buildings in three-dimension were visualized. Although shape of the objects 3D building modeling is relatively inaccurate as the spatial and radiometric resolution of the TIR images are lower than that of optical images, TIR imagery could be used effectively to measure the thermal energy of the buildings based on spatial information. This paper could be meaningful to present extension of photogrammetry to various application. The energy consumption could be quantitatively estimated using the temperature emitted from the individual buildings that eventually would be uses as essential information for building energy efficiency rating system.