Tilt-up construction is the method that the wall structures are fabricated horizontally on site and placed at specified location using heavy lifting equipment. Tilt-up method generally has several advantages, such as of productivity improvement, labor savings, shortened the construction period the and cost savings. In this study, Tilt-up method is used for wall construction of detached house. Result shores the substantial improvement on construction period. The use of Tilt-up method led construction period reduction of 20%.
Now, there are many cases where materials are maintained at construction sites or standard construction prices are not in accordance with the applicable regulations, resulting in a lot of fine dust. Therefore, a particulate matter measurement system is applied not only to manage particulate matter at construction sites but also to reduce particulate matter .This study aims to evaluate the applicability of this particulate matter measurement system to the construction site through long-term measurement experiments using a light scattering method particulate matter measurement instrument at the construction site.
Sewage facilities are positively necessary for environment improvement such as rainwater removal, sewage disposal, preservation of the qualify of water and health of the citizens in present-day. Meanwhile, a deterioration of the concrete sewer pipe is increasing rapidly due to the chemical and physical attack and especially biochemical attack that is to say biodeterioration. In this study, researches for the development of antibiotics and antimicrobial concrete were conducted to reduce biochemical corrosion of sewage concrete. First of all, desired performance, such as watertightness, antibiosis, homogeneity, workability and harmlessness, was proposed and performance of antibiotics and antimicrobial concrete were evaluated by them. And developed antimicrobial concrete was applied to actual construction field. As results of this study, dispersibility and antibiosis of liquid antibiotics superior to powdery antibiotics. Antibiosis of antimicrobial concrete was verified, and amount of elution of harmful and effective ingredients was little. In workability, setting time of antimicrobial concrete was delayed. Compressive strength and resistance to carbonation of antimicrobial concrete were more increased than ordinary concrete. Finally, as there were no problems in quality and construction progress of antimicrobial concrete produced in plant, applicability of antimicrobial concrete to actual construction field was verified.
건설R&D 사업은 1994년에 12억원으로 시작하여 2007년에는 1,648억원을 투자하였다. 그동안 연구개발자는 연구성과 실적을 한국건설교통기술평가원에 제출하였고, 이를 기반으로 건설R&D성과 관리가 이루어져 왔다. 건설R&D사업 성과실적이 연구자의 주관적인 분석결과와 보고자료에 의존함으로써 건설R&D 성과의 객관성 및 신뢰성 확보가 어려웠다. 따라서 본 연구는 건설R&D 성과 중 개발기술의 현장적용 비용절감액 분석과 객관적이고 신뢰성있는 경제적 파급효과를 분석하고, 건설R&D의 현장적용 활성화 방안을 마련하였다.
최근 건축물이 대형화되고 비정형화됨에 따라 기존의 2차원 도면으로 3차원을 표현하는 데 한계가 있고 설계오류파악, 공사 물량과 공사비 오차의 발생, 시공오류의 예측 부재, 기둥, 보, 기계설비 배관 등의 부재간의 충돌 등의 문제점을 개선하고자 건설 현장에서 BIM(Building Information Modeling; 이하 BIM)이 사용되고 있다. 그러나 실질적으로 건설 공사 현장의 직원들을 대상으로 BIM의 사용법을 교육하고 평가하여 실질적인 구현 방법을 충분히 숙지하게 한 이후에 BIM을 공사 현장의 공사 관리 업무에서 사용하게 하여 BIM 사용에 따른 효과를 분석한 연구는 전무하다. 이에 본 연구는 BIM의 교육, 평가, 실시에 따른 공사현장에서 BIM의 효과를 설문조사를 통하여 실증적으로 분석하고 개선방향을 제시하고자 한다.
최근 상당기간과 공사비를 최소화할 수 있는 비정형 건축물의 설계와 시공이 새로운 기술로 구현되고 있다. 이는 비정형 건축물의 최적화 설계와 부재화를 통한 공장 생산 시스템과 현장 조립 및 설치 기술로 가능하다. 비정형 건축물의 구현을 위한 연구가 진행되어 왔으나 여전히 비정형 건축물 시공은 설계오류와 시공자의 도면이해 부족, 시공경험 및 공법의 부재 등으로 인하여 시공 품질과 공기, 공사비 증가 등의 잠재적 리스크를 포함하고 있다. 비정형 건축물의 시공품질 향상과 공기단축 및 시공비 상승의 문제점을 해결하기 위한 3D 디지털 설계와 제작 기술을 적용하는 것이 중요하다. 이에 본 연구는 비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스를 제안한다. 궁극적으로 본 연구는 비정형 구조물의 구조검토, CNC(Computerized Numerical Control) 가공에 의한 부재의 정밀제작, 설치, 시공의 오차관리로 최적 시공의 근간이 되는 비정형 건축물 외피 시스템 구현을 위한 최적화 설계 프로세스를 제시한다.본 연구는 비정형 건축물을 구현한 사례를 살펴보고 디지털 설계 프로세스와 적용 프로그램을 살펴본다. 비정형 건축물의 설계도의 3D 디지털 데이터 구축과 디지털 최적화 구현 사례로 4대강 대표 물문화관(The ARC)을 중심으로 설계단계에서 적용된 최적화 기법을 순차적으로 분석하여 비정형 건축물의 3차원 좌표제어에 대한 방법론을 제시한다.
본 연구는 최근 고층 건축물의 외장 마감으로 사용되는 커튼월 중, 유니트 커튼월 방식의 양중 문제 해결을 위하여 커튼월의 수직부재인 멀리온을 레일로 활용하고자 하였다. 커튼월 멀리온의 레일 적용에 따른 양중 가능 여부는 Mock-Up Test의 진행을 통해 20m/sec의 풍속에도 양중이 가능한 것으로 나타났으며, 비교를 위해 선정된 현장 기준으로 공사 기간은 약 20% 단축이 가능하며 투입 인원은 약 33%를 줄일 수 있을 것으로 분석되었으며, 10,000㎡의 설치를 가정하면 80% 이상의 시공비용 절감이 가능한 공법으로 판단된다.
타워팰리스 III 현장은 현존하는 국내 건축물로는 가장 높은 초고층 주상복합건물이다. 초고층 현장에는 일반현장과는 다른 시공기술 및 엔지니어링 기술의 적용이 요구되는 바, 타워팰리스 III 현장은 지금까지 축적된 기술을 바탕으로 보다 발전된 시공기술과 엔지니어링 기술, 그리고 공정관리기법을 통하여 마감공사 포함 충 당 13.4일이라는 공사 속도를 달성하였다. 이와 같은 공사를 성공적으로 수행하기 위하여 적용된 첨단 시공기술로 1) 골조공사 및 외벽공사의 3-Day Cycle을 달성하기 위한 여러 가지 공법, 2) 초고층 주거건물의 마감공사 공정관리를 위한 Tact 공정관리 시스템, 3) 현장관리 시스템으로 물류관리 및 정보공유 시스템 등이 적용되었다. 또한 엔지니어링 요소기술로 1) 고유동 무다짐 콘크리트와 국내 최초의 압축강도 $800kgf/cm^{2}$의 초고강도 콘크리트 등의 New Material, 2) 냉각수 순환형 파이프쿨링 시스템 등의 New Method, 3) Smart Fan Control 주방환기 시스템을 포함한 Mechanical System 4) False Car System을 포함한 Electrical System 등이 있다.
건축물의 화재발생 시 건축물 붕괴방지 및 인명의 피난시간 확보를 위하여 내화구조(내화피복재)를 시공하도록 하고 있으나 실제 규모와 가까운 내화시험의 특성으로 건축물 시공현장에서 내화구조(내화피복재)의 품질을 확인할 수 있는 현장품질방법이 부재하다. 따라서 근-적외선분광분석을 통하여 현장에서 적용할 수 있는 일치성 분석기법 연구를 통해 정확하고 간편한 과학적 내화구조현장관리 시험방법을 제시하고자 함.
Top-down construction is a useful method of utilizing the working space, economic benefits and shorten the construction period. Precision construction of the elevator core is very important for safety of the top-down structure. In this study, the layout system for the field-BIM(Building Information Modeling) was used to precisely construct the elevator core in the basement and the ground. Through the layout system, it was possible to process the construction status, review the design results and construction errors, and confirm whether there is or not within the construction error range for elevator installation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.