• Title/Summary/Keyword: 건축시공 현장적용

Search Result 341, Processing Time 0.027 seconds

Application of Tilt-Up Construction Method for Building Single-Family house (단독주택의 구조체 공사에 있어 Tilt-up 공법의 현장적용)

  • Jeon, Se Mi;KIm, Myeong Gil;An, Youn-soo;Sho, Kwang-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.136-137
    • /
    • 2015
  • Tilt-up construction is the method that the wall structures are fabricated horizontally on site and placed at specified location using heavy lifting equipment. Tilt-up method generally has several advantages, such as of productivity improvement, labor savings, shortened the construction period the and cost savings. In this study, Tilt-up method is used for wall construction of detached house. Result shores the substantial improvement on construction period. The use of Tilt-up method led construction period reduction of 20%.

  • PDF

A Study on the Field Application of particulate matter Measurement Instruments in Light Scattering Method (광산란법 미세먼지 계측기의 현장 적용성 평가에 관한 연구 )

  • Liu, Bao-lin;Lee, Chung-Won;Lim, Hyo-Jin;Tae, Sung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.201-202
    • /
    • 2023
  • Now, there are many cases where materials are maintained at construction sites or standard construction prices are not in accordance with the applicable regulations, resulting in a lot of fine dust. Therefore, a particulate matter measurement system is applied not only to manage particulate matter at construction sites but also to reduce particulate matter .This study aims to evaluate the applicability of this particulate matter measurement system to the construction site through long-term measurement experiments using a light scattering method particulate matter measurement instrument at the construction site.

  • PDF

Development of Antimicrobial Concrete for Sewage Structures and Application to Construction Field (하수구조물용 항균콘크리트의 개발 및 현장적용)

  • Kim Moo-Han;Kim Gyu-Yong;Lee Eui-Bae;Lee Seung-Hoon;Sohn Yu-Shin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.3 s.21
    • /
    • pp.91-97
    • /
    • 2006
  • Sewage facilities are positively necessary for environment improvement such as rainwater removal, sewage disposal, preservation of the qualify of water and health of the citizens in present-day. Meanwhile, a deterioration of the concrete sewer pipe is increasing rapidly due to the chemical and physical attack and especially biochemical attack that is to say biodeterioration. In this study, researches for the development of antibiotics and antimicrobial concrete were conducted to reduce biochemical corrosion of sewage concrete. First of all, desired performance, such as watertightness, antibiosis, homogeneity, workability and harmlessness, was proposed and performance of antibiotics and antimicrobial concrete were evaluated by them. And developed antimicrobial concrete was applied to actual construction field. As results of this study, dispersibility and antibiosis of liquid antibiotics superior to powdery antibiotics. Antibiosis of antimicrobial concrete was verified, and amount of elution of harmful and effective ingredients was little. In workability, setting time of antimicrobial concrete was delayed. Compressive strength and resistance to carbonation of antimicrobial concrete were more increased than ordinary concrete. Finally, as there were no problems in quality and construction progress of antimicrobial concrete produced in plant, applicability of antimicrobial concrete to actual construction field was verified.

Analysis of Economic Effectiveness in the Results of Construction R&D (건설R&D성과의 경제적 파급효과 분석)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.71-81
    • /
    • 2010
  • In 1994, Korean construction research and development (R&D) projects received investments amounting to 1.2 billion KRW, an amount that rose to 164.8 billion KRW in 2007. Under the current system, construction researchers submit the application records of Construction Research and Development (R&D) in construction projects to the Korea Institute of Construction & Transportation Technology Evaluation and Planning. The performance of Construction R&D projects has thus been dependent on the subjective reporting of the results by the researchers themselves. For this reason, it is difficult to secure confidence in the records of Construction Research and Development. Therefore, this research suggested measures for revitalizing Construction Research and Development, analyzed approaches to cost-saving in Construction Research and Development, and analyzed economic effectiveness in the results of construction R&D.

Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field (건축공사 현장의 공사관리를 위한 BIM (Building Information Modeling) 적용과 효과 분석)

  • Choi, Jaehyun;Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.115-121
    • /
    • 2015
  • As recent buildings have been enlarged and free-formed, it is hard to represent three-dimensional buildings with two-dimensional drawings and identify design errors, construction errors, difference of construction quantity and construction cost, clash with columns, beams, pipe machinery, and so on. In order to overcome the limitations, BIM(Building Information Modeling) has been used in construction industry. However, BIM in the construction site is not fully facilitated after practical implementation in process control including training, evaluation and analysis of the process. Therefore, in this study, the effect of BIM applied in the construction site is analyzed empirically throughout the survey at the construction site in accordance with the training, evaluation, and implementation of BIM.

3D Digital Design Optimization Process Considering Constructability of Freeform Structure (비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.35-43
    • /
    • 2013
  • Nowadays the widely used media in architecture include visualizations, animations and three-dimensional models. 3D digital methods using active CAM(Computer Aided Manufacturing) and CNC(Computerized Numerical Control) imaging have been developed for accurate shape and 3D measurements in freeform buildings. In contrast to a conventional building using auto CAD system and others, the proposed digital optimization method is based on a combination of 3D numerical data and parametric 3D model for design and construction. The objective of this paper is therefore to present digital optimization process for constructability of freeform building. The method can be useful in the effective implementation of an error-proofing process of freeform building during design and construction phase. 3D digital coordinate data can be used effectively to identify correct size of structural and finish members and installation location of each members in construction field. In addition, architects, engineers and contractors can evaluate design, materials, constructability and identify error-proofing opportunities. Other project participants can also include representatives from all levels of management, departments as well as workers and key subcontractors' personnel, if necessary. The 3D digital optimization process is therefore appropriate to serious variations in freeform shape. For future study, the developed digital optimization method is necessary to be carried out to verify the robustness and accuracy for constructability in construction field.

A Study on the Economic and the Field Application Feasibility of Unit Curtain Wall Mullion Rail Lift System (유니트 커튼월 멀리온 레일 양중 시스템의 경제성 및 현장 적용 가능성에 관한 연구)

  • Jung, Ui-In;Kim, Hea-Na;Kim, Bong-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.1
    • /
    • pp.41-49
    • /
    • 2021
  • This study was to solve the lift problem of the existing unit curtain wall type by using the vertical material mullion as a rail in curtain wall, which is recently used as an external finishing material for high-rise buildings. It has been shown that the application of the curtain wall mullion's rail can be quantified even at 20m/sec wind speed through the Mock-Up test. Based on the sites selected for comparison of construction methods, it was analyzed that the construction period could be shortened by 48 days, or about 20 percent. It was analyzed that the number of construction workers could be reduced by about 33 percent from the previous nine to six. Based on these results, assuming the installation of curtain wall units of 10,000㎡, it is judged that construction cost can be reduced by 80% or more.

Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

A Study of Identification Test Method for Fire Resistive Paint in Near-Infrared Spectroscopy (적외선분광법을 이용한 내화피복재 일치성 평가방법 연구)

  • Cho, Nam-Wook;Jeon, Soo-Min;Kang, Sung-Hun;In, Ki-Ho;Rie, Dong-Ho
    • Fire Science and Engineering
    • /
    • v.24 no.3
    • /
    • pp.20-24
    • /
    • 2010
  • When the fire occurred in building, the fire-resistance-structure has to be constructed to prevent collapse of building and to have a time for evacuation of peoples. because of the features of the fireresistance test is similar with real scale, there is no way to confirm quality of fire-resistive-structure in building construction site. Therefore the purpose of this study, a study by spectroscopic analysis using near-infrared spectroscopy (NIR), is to suggest of useful and scientific testing-methods in building construction site by identification-analysis-study for fire resistive paint.

Case Study of the Field-BIM for Precision Construction of Elevator Core Wall in Top-down Project (Top-down 공법 현장에서 엘리베이터 코어월 정밀 시공을 위한 시공 BIM의 적용 사례 연구)

  • Shim, Hak-Bo;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.108-109
    • /
    • 2019
  • Top-down construction is a useful method of utilizing the working space, economic benefits and shorten the construction period. Precision construction of the elevator core is very important for safety of the top-down structure. In this study, the layout system for the field-BIM(Building Information Modeling) was used to precisely construct the elevator core in the basement and the ground. Through the layout system, it was possible to process the construction status, review the design results and construction errors, and confirm whether there is or not within the construction error range for elevator installation.

  • PDF