Proceedings of the Korea Water Resources Association Conference
/
2016.05a
/
pp.309-314
/
2016
본 연구에서는 확률강우량 산정을 위한 빈도해석 시 보다 타당하고, 신뢰도 높은 강우자료를 선정하여 수공구조물 설계 및 재난방재계획에 합리적인 기준을 제시하고자 이상치 적용에 따른 확률강우량을 산정 비교하였다. 이상치검정의 비교를 위하여 Grubbs and Beck 방법과 미국 수자원평의회 방법을 적용하였으며, 적용결과에 따라 강우자료를 조정하여 확률강우량을 산정 비교하여 타당성을 검토하였다. 본 연구의 수행으로 이상치검정에 따라 강우자료 년수에 변화가 있었으며, 기존의 방법과 확률강우량을 비교하였을 때, 증감이 나타났다.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.9
/
pp.669-679
/
2016
Architectural firms that would like to adopt the BIM are currently in an unfavorable position because of reduced orders, polarization of orders, and low price design. This study was conducted to evaluate plausible methods for supporting introduction of BIM into small sized firms. Before suggesting plans for support, we analyzed support projects and laws relating to support for small sized firms, after which we conducted a survey of small sized firms that support the project. The survey was completed by 242 architects and consisted of questions regarding the following aspects: current status and problems associated with BIM utilization, preference of certain policies for BIM introduction support, and reasonable level of support. After the survey, it was concluded that architectural firms are willing to use BIM and agree with the need for financial support for BIM program purchase and education, as well as to support BIM experts and fund low interest loans. In conclusion, it is proposed that support plans for small sized architectural firms in the areas of BIM introduction consulting, financial funding for the introductory process, provision of education and experts, order support, and promotions for accomplishment be provided.
Korean Journal of Construction Engineering and Management
/
v.16
no.4
/
pp.89-97
/
2015
This paper analyzes the duration of the construction document (CD) phase of 42 large public building projects delivered by the total solution service of Public Procurement Services in Korea from 2009 to 2014. The quality of construction documents significantly affects the quality of construction and facility management. Thus, securing appropriate time for the CD phase during project planning is important for the quality of a project. Currently, the duration of the CD phase is planned based on the construction costs of a project following a notice of the Ministry of Land, Infrastructure and Transport. However, our analysis results showed that the correlation between the actual duration of the CD phase and construction costs is very weak. The actual CD phase takes 1.33-1.79 times longer than the planned duration. The practitioners who were interviewed, were already aware that the correlation between the duration of the CD phase and the construction costs is weak. They identified the complexity of the project, the extent of the design changes, project type, client characteristics, and others as more influential factors on the CD phase than the construction costs. To improve the quality of CDs, a new guideline for determining an adequate CD phase duration should be studied and developed.
Park, Sang Mi;Kim, Hyeon Seung;Han, Seon Ju;Kang, Leen Seok
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.6
/
pp.1109-1117
/
2017
Recently, 3D printer technology has been attracting attention in various industrial fields, and research papers are being conducted to utilize 3D printers in the construction industry. Actual structures such as bridges and buildings are being printed to 3D printers, and various applications such as mock-up structures using 3D printers are being proposed. In order to utilize 3D printer technology in the construction field, a 3D model is required, and the 3D BIM data produced at the design stage can be printed by a 3D printers, saving the cost and time of 3D model generation. However, 3D BIM data often does not satisfy the conditions for 3D printer output, causing many errors on output. In this paper, authors propose a problem analysis for 3D BIM model output to 3D printer and a method for reducing errors in 3D printing process of 3D BIM model. In addition, this paper presents a practical application of 3D model output from 3D printer.
Bulletin of the Society of Naval Architects of Korea
/
v.32
no.4
/
pp.57-63
/
1995
극지개발을 위해서는 극지의 혹독한 자연환경을 대상으로 하는 과학지식과 극지에서 사용되는 특수시설과 장비를 설계, 시공 그리고 운용하는 공학기술이 요구된다. 극지관련 공학기술은 저 온용재료 관련기술, 도로나 교량, 건축물과 같은 극한지 천연자원의 시추와 생산, 수송을 위한 해양구조물과 파이프라인 관련기술, 그리고 얼음의 재료특성에 관한 이론 및 실험으로 크게 구 분할 수 있다. (Table 1). 극지용 구조물과 빙해항행선박 (쇄빙선) 은 일반 해역에서 운용되는 구조물에 비해 형상, 구조강도, 의장, 저온특수설비 등에서 새로운 개념의 기술이 요구되기 때 문에 금후 국내 조선해양산업계가 지향해야 할 고도의 기술집약형 건조물이다. 또한 최근 들어 국내에서도 시베리아 천연자원의 해상운송을 위해 빙해역을 운항할 수 있는 유조선이나 일반 화물선을 확보해야할 필요성이 대두되고 있으며, 또한 국내 조선업계의 생산기술이 비약적으로 발전함에 따라 외국으로부터의 빙해항행선박의 수주도 이루어지고 있으나 아직 이들 선박의 설계를 위한 독자적인 기술은 미흡한 현실이다. 극지개발은 이론적 접근과 함께 실험에 의한 신뢰성 있는 자료를 축적해야 한다. 이를 위해서는 빙해수조(,ice model basin)의 건조나 빙역학 실험을 위한 냉동실험실 (cold room)의 건립을 위한 초기투자가 절실히 요구되며 산업계의 수 요에 따른 포괄적인 산학협동연구가 진행되어야 할 필요가 있다. 빙해수조와 냉동실험실은 빙 해역에 직접 접하지 않은 국가에서 극지공학 연구에 참여하기 위한 필수적인 시설인데 table 2에 대표적인 빙해수조의 설치장소와 규모에 대하여 정리하였다. 이 글은 우리 나라가 쉽게 접할 수 없는 극지환경을 이해하고 가까운 장래에 예상되는 수주경쟁에 대비하여, 국내외의 극지개발 동향을 분석하고 이에 대한 국내의 극지관련 연구의 현황과 앞으로의 전망을 살펴보기 위하여 준비된 것이다. 이 글에서는 극지공학 일반보다는 조선해양분야에 관련된 내용만으로 국한한다.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.5
/
pp.3619-3626
/
2015
The coal shed at thermal power plant(T.P.P) is the biggest building on size among nuclear, coal and other power plant industry buildings. This the coal shed of indoor type is mass volume, the size of 6 soccer fields and 73 meter in height. Structural and functional elements take priority over aesthetic factors. The shed is built to make mighty space for structural safety and functional store by using the concrete, $75,000m^3$ on the total of central retaining wall and sub buttress, and the steel frame used by 11,744-ton P.E.B. system. The design requirement on its wall and frame, P.E.B. system's feature, and specific data of main process followed by construction are inquired. The aim of this study is to suggest the design requirement and guide for the indoor type of the coal shed.
Journal of the Korean Institute of Traditional Landscape Architecture
/
v.40
no.2
/
pp.59-66
/
2022
The purpose of this study was to suggest the landscaping repair work classification, the standard for securing the independence of and establishing the scope of landscaping repair works. Standard construction specifications currently specify the landscaping repair work classification around the planting construction, while standard work estimate does not include the field of landscaping. The landscaping construction specifications and the standard work estimate in the construction industry should be, however, applied, so it is difficult to specifically understand what is the landscaping repair work classification in the cultural heritage industry. From 1961 to 1980, not only the tree planting but also a variety of landscaping facilities had been specified as the landscaping repair works, and it was found that all of these work classifications are established as the landscaping repair work classifications in the construction industry. A total of 20 work classifications were verified by comprehensively arranging those specified in notices of tender for working drawing services for cultural heritages during three years, from 2018 to 2020, except for those for the maintenance and Dancheong of architectures, plant protection and conservation. All 20 work classifications corresponded to the landscaping work classifications in the construction industry. On the basis of the landscaping work classifications in the construction industry, this study divided the landscaping repair work classifications into site-building and shaping, planting work, facility construction, paving work, ecological landscape architectural construction and vegetation maintenance, by considering the specialty of cultural heritage space.
Korean Journal of Construction Engineering and Management
/
v.17
no.2
/
pp.31-38
/
2016
In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.9
/
pp.333-340
/
2018
Recently, free-form buildings have been designed with complex shapes due to digitization of the construction industry. Exterior and interior components of free-form buildings have free cross sections and curved shapes. Therefore, structural members with curvature are frequently seen. In the modeling and stability evaluation of these structures, commercial programs using classical finite element analysis are not able to perform rapid shape modeling, resulting in a decrease in productivity. Therefore, in this study, pre- and post-processing modules were developed using a prior study to rapidly model the surface of a free-form building and to automatically generate frame structures that make up the cladding. The developed modules use a subdivision algorithm with spline curves. This algorithm is used to automatically generate analytical elements from the configuration information of NURBS curves. In addition, the deformation after analysis can be viewed more realistically. The modules can quickly construct complex curved surfaces. An analysis model of the frame structure was also automatically generated. Therefore, the modules could contribute to the productivity improvement of free-form building design.
Park, In-Sook;Kim, Whoi-Yul;Kim, Byeoung-Su;Ahn, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.791-796
/
2007
As large-scale buildings, skyscrapers, and multi-purpose buildings recently increase in numbers dramatically, the internal space of such buildings becomes more and more large and complicated accordingly. Since such structures usually accommodate a number of random people, the potential possibilities of disastrous tragedies are high, and the rates of injury and physical damage caused by the complicated system of the building also increase as well. However, most of the shelter designs of the existing buildings are based on the specifications according to the assigned laws and involved regulations. In this case, only general criteria are referred to regardless of the characteristics of each structure while other disaster-related features are not taken into consideration sufficiently. Since any actual fire may cause a terrible calamity, in such plans, shelter inducement can be neither safe nor effective. Thus, this study examines and analyzes currently run disaster prevention systems and shelter inducement facilities with COEX Mall as its subject, and analyzes the responding system to each situation based on the fire scenarios by means of As-Is Model. Through this analysis, presented are the measures to solve the problems of current disaster prevention systems and to improve shelter inducement methods effectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.