The Constitutional Directions of Construction Information Management System Between Design and Construction in the Building Project (설계/시공간의 효율적인 정보통합관리를 위한 건설정보처리시스템 구축 방안)

  • Oh Seung-Jun;Lee Kyung-Kook;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.464-467
    • /
    • 2002
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. This research proposed the optimization method of building system which is satisfied with performance of building, cost, constructability, and proposed the information management plan which is connected with that. And The construction information in this research is restricted to design/construction information which is considerate in design step.

  • PDF

The Life Cycle Cost Optimization Methodology as a Tool for Designing Apartment Units (공동주택 단위세대의 생애 비용 최적화 방법론 연구)

  • Park Tae Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.80-86
    • /
    • 2000
  • The future costs of energy and the cost of the repair of apartment buildings are expected to rise continuously in proportion to the initial costs. Therefore it has become important for these increasing costs to be incorporated and reflected in the design of the building. Systems such as structure and services for the buildings remain constant, but a number of the walls and windows can vary and thus have a major influence on the total construction and running costs of a building. The critical factor in the apartment unit design for the optimization of life cycle cost (LCC) is the ratio of the x and y axis of the walls in the unit plan. This paper demonstrates how to achieve the optimal size and thus optimize the LCC of the building.

  • PDF

Constitutional Directions of Decision Support System for Cooperative Design in Architectural Design Phase (건축협력설계 의사결정 지원시스템 구축방안)

  • Chun Jae-Youl;Oh Seung-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.91-98
    • /
    • 2003
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore The final object of this study is to propose the establishment method of decision support model for the cooperative design in order to provides improved design coordination and optimize the building system.

Establishment of Collaborative Decision Making Support Process in Pre-Final Design Step (건축 중간설계단계의 협력 의사결정 지원 프로세스 구축)

  • Oh Seung-Jun;Kwon Won;Kim kyung-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.315-318
    • /
    • 2003
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore The final object of this study is to propose the establishment method of decision support process for the cooperative design in order to provides improved design coordination and optimize the building system.

  • PDF

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.

A Study on the Accuracy Comparison of Object Detection Algorithms for 360° Camera Images for BIM Model Utilization (BIM 모델 활용을 위한 360° 카메라 이미지의 객체 탐지 알고리즘 정확성 비교 연구)

  • Hyun-Chul Joo;Ju-Hyeong Lee;Jong-Won Lim;Jae-Hee Lee;Leen-Seok Kang
    • Land and Housing Review
    • /
    • v.14 no.3
    • /
    • pp.145-155
    • /
    • 2023
  • Recently, with the widespread adoption of Building Information Modeling (BIM) technology in the construction industry, various object detection algorithms have been used to verify errors between 3D models and actual construction elements. Since the characteristics of objects vary depending on the type of construction facility, such as buildings, bridges, and tunnels, appropriate methods for object detection technology need to be employed. Additionally, for object detection, initial object images are required, and to obtain these, various methods, such as drones and smartphones, can be used for image acquisition. The study uses a 360° camera optimized for internal tunnel imaging to capture initial images of the tunnel structures of railway and road facilities. Various object detection methodologies including the YOLO, SSD, and R-CNN algorithms are applied to detect actual objects from the captured images. And the Faster R-CNN algorithm had a higher recognition rate and mAP value than the SSD and YOLO v5 algorithms, and the difference between the minimum and maximum values of the recognition rates was small, showing equal detection ability. Considering the increasing adoption of BIM in current railway and road construction projects, this research highlights the potential utilization of 360° cameras and object detection methodologies for tunnel facility sections, aiming to expand their application in maintenance.