• Title/Summary/Keyword: 건축단계

Search Result 940, Processing Time 0.022 seconds

Factor Deduction of the Checklist for Environmental Management in Construction Phase (시공단계 환경관리를 위한 체크리스트 항목 도출)

  • Kim, Chang-Won;Lee, Myungdo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.139-141
    • /
    • 2013
  • Construction industry has been participated in the effort for the reduction of environmental pollution such as introduction of green building certification, enactment of environment related regulation. However these efforts are focused on the design and maintenance phases of entire life cycle, construction phase that can occur intensive environmental impact in a short period is insufficient. Therefore this study aim to derive environmental management factors in construction phase and assess them using reliability analysis and factor analysis. As a results, the 20 factors was classified into 4 superordinate such as 'plan and supervision', 'environmental factor management', 'licensing management', 'surrounding environment management'.Based on result of this study, further study should be developed the checklist for effective environmental management in construction phase.

  • PDF

Normalization References for Environmental Index of Construction Projects (시공단계 환경성능지수 개발을 위한 정규화 기준값 산정)

  • Lee, Sanggyu;Kang, Goune;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.142-143
    • /
    • 2013
  • Green building certifications and environmental assessments are extensively implemented and studied to decrease the environmental impact during the life cycle of buildings. However, most of them are not appropriate to assess the environmental performance during the construction phase due to the difference of environmental factors. To develop an environmental index of construction projects, normalization should be conducted to compare the relative impact of each factor. As a first step, this study deduced normalization references of 4 environmental factors : noise, waste, greenhouse gas, and dust.

  • PDF

Greenhouse Gas Management Policy during Construction Execution Phase -Focused on Green Building Rating Systems and Japanese Case- (건축물 시공단계에서의 온실가스 배출 관리 방안 -국내외 친환경 인증제도와 일본 현장의 대응 방안을 중심으로-)

  • Song, Sang Hoon
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.139-150
    • /
    • 2010
  • Until now, the eco-friendly construction (green construction) has been focused on reducing environmental impacts in use(operation and maintenance) phase. Considering the environmental influence along the life cycle of construction project, the impact in execution phase is rather lower than that in use phase. However, that impact is thought to be greatly decreased by well-organized activities. Based on its urgency and requirement for timely action, this study aimed to discuss the greenhouse gas (GHG) reduction plan in execution phase from a broad perspective. To achieve this purpose, the green building rating systems in domestic and foreign countries have been reviewed, and the practice in Japan was investigated. In order to improve current on-site greenhouse gas management, the integration among construction phases, participants, and environmental factors, and institutional supports are required as well as the contractor's efforts.

The Improvement Plan of Design Process by Case Study of Steel Structural Work (현장조사를 통한 철골공사 설계프로세스 개선방안)

  • Bang, Sung-Won;Kim, Jin-Ho;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.111-118
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying time and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

Review of effectiveness at the Construction implementation design VE study by the selected target through CostModeling in the Pre-functional analysis Phase (건설공사 실시설계 VE시 기능분석 이전 단계에서 CostModeling을 통한 핵심 쟁점 사항 도출에 의한 효용성에 관한 고찰)

  • Jeong, Yeon-Goo;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.244-245
    • /
    • 2021
  • Design VE (Value Engineering) has been basic design and implementation design separately, but due to the recent change in guidelines, it is changing to implement only once in the implementation design stage. However, in the implementation design stage, construction costs, plans, and specifications based on the volume details are almost completed. Therefore, it is effective to perform the function analysis step after identifying information analysis and key issues through CostModeling based on functional center for the selected target in the process of implementing the VE performance procedure.

  • PDF

Vibration Reduction for a Railway Depot Building (II): Design Parameters (철도인공대지에 건설된 아파트의 방진대책(II): 설계변수)

  • Kim, Jeung Tae
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.5
    • /
    • pp.358-364
    • /
    • 2013
  • In the second part of the paper, a design strategy for an apartment complex constructed at a railway depot is proposed for vibration reduction purposes. Various design parameters such as the vehicle operating speeds, artificial land behavior, housing support structure, and apartment sub-structures are individually examined to reduce the transmission of vibrations through building structures. Building construction on an artificial land should be subjected to regulations that require the application of a vibration reduction scheme based on the mechanics that govern the vibration transmission phenomena. The implementation of these parameters at an early design stage will provide a quiet living environment for residents who may be exposed to excessive noise and vibration.

A study on the reshaping the prospect of a leading hospital in Korea - a case study : Seoul National University Hospital Master Plan - (한국의 선도병원으로서의 위상 재구축에 관한 연구 - 서울대학교 병원 마스터 플랜 사례 -)

  • Lee, Jung Man;Kim, Kevin
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.8 no.2
    • /
    • pp.61-66
    • /
    • 2002
  • 서울대학병원의 마스터플랜 재구성에 대한 프로젝트로서 기존의 환경에 대한 조사와 분석 그리고 외국사례와의 비교를 통해 앞으로 서울대학병원이 나아가야 할 목표 및 방향을 단기(1-2년), 중기(2-5년), 장기(10년 이상)계획으로 나누어 각 단계별 항목들을 분석, 구체화하였다. 단계계획에서는 응급실의 확장과 어린이 병원증축에 대한 내용을 제시하였고, 중기계획에서는 외래진료센타(ambulatory care center)에 대한 공간구성을 통하여 기존 마스터플랜이 나아가야 할 방향을 제시하였다. 장기계획에서는 어린이 병원의 이전, 캠퍼스 기능구획을 연구, 교육, 병원으로의 분류, 공급시설의 개선과정을 제시하였다. 이 연구를 통하여, 한국의 병원시장에 대한 경향을 다음과 같이 분석할 수 있었다. 1) 증축공간이 부족한 도심에 밀집한 한국병원의 경우, 리노베이션을 통한 마스터플랜은 다양한 시설물을 개선, 관리, 통합할 수 있는 방법이다. 2) 편리성, 환자의 프라이버시, 전문성, 방문자 오락시설, 통합적인 치료환경의 구축이다. 3) 예방 의약품의 증가, 건강센타, 건강중심의 프로그램, 확장된 진료시설 등 건강유지분야의 개발이다. 마스터 플랜은 계속 진행되는 과정의 일부분이며, 변화하는 조건 속에서 적용되어, 수정되어져야 할 것이다.

  • PDF

A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project - (건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 -)

  • Yoon Jun-Seon;Yoo Byoung-Eok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.93-99
    • /
    • 2006
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

A Study on the Development of the Use Index of Closed School Facilities Using Big Data -Focused on Text-Mining Techniques- (빅데이터를 활용한 폐교시설의 지표 개발에 관한 연구 -텍스트마이닝 기법을 중심으로-)

  • Kim, Jae-Young;Lee, Jong-Kuk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.18 no.2
    • /
    • pp.1-11
    • /
    • 2019
  • The purpose of this study is to make objective decisions in the use of closed schools through the development of utilization indicators for the efficient use of closed schools, which is expected to increase continuously. The research phase was largely carried out by drawing preliminary indicators for use in closed schools, drawing final indicators using big data, and quantifying indicators, and finally objectifying them through quantification. The institution intends to apply and verify the facility based on future indicators. This study has implications for the application of big data analysis methods that have not been attempted in planning and research for the use of closed school facilities to date.