• Title/Summary/Keyword: 건설 프로세스

Search Result 710, Processing Time 0.028 seconds

Improvement of Six Sigma DMAIC Processes by Applying Lean Six Sigma Theory (린식스시그마의 개선영역을 통한 식스시그마 DMAIC 프로세스의 발전 방안)

  • Kwon, O-Bin;Lee, Seung-Hyun;Son, Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.551-556
    • /
    • 2008
  • Six Sigma keeps its continuous change in terms of its strategies and methodologies for 20 years since it is introduced in the industry Developing innovative business management strategies creating a higher synergy effect has been Pursued by combining Six Sigma and different business strategies. In fact, various research studies have been performed for grafting lean production theory with Six Sigma concept. Specifically, the companies which obtained positive results from the applications of Six Sigma are trying to adopt Lean Six Sigma theory for their business strategies. However, the research studies or the applications of Lean Six Sigma are insufficient in the construction industry compared to the other industries such as manufacturing. In order to deal effectively with this issue, this research study suggests the improved and restructured Six Sigma DMAIC processes by embodying the existing Six Sigma DMAIC processes applied on construction projects and improving them through the improvement territories of Lean Six Sigma studied in advance.

  • PDF

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.

Seismic Analysis Process of Steel Box girder Bridge based on BIM (강상자형 교량의 BIM기반 내진해석 프로세스)

  • Lee, Heon-Min;Lee, Jin-Kyoung;Yoo, Jae-Myoung;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.421-428
    • /
    • 2011
  • The communication of each others is lack between planing, design, construction and maintenance in domestic construction industry. This problem makes the omission of information and the loss of cost. So, the introduction of BIM can be the solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the seismic analysis process of steel box bridge for structural design of bridge construction project based on BIM. The additional process is needed for the purpose that structural data is inherent in the property information of 3D information model. This process has 3D modeling progress done by using the information decided in design phase. The design document of seismic analysis can be derived with the proposed process to steel box bridge.

A Study of Knowledge Classification Structure Improvement through Adopting BPM (BPM 도입을 통한 지식분류체계 개선에 관한 연구)

  • Hwang, Jin-Won;Choi, Hyung-Won;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.720-724
    • /
    • 2008
  • Concentration about value of invisible asset has increased in the condition of rapid business circumstance change. As one of these concentration, many company adopted knowledge management, and construction industry also tried to adopt knowledge management. However, it is difficult for construction company to get expected effects because of knowledge management system in no relation with business process. To solve this problems, this study adopted BPM that has many functions, such as business process design, operation, monitoring, sustainable improvement, to knowledge classification structure.

  • PDF

Analysis on Fluvial Geomorphological Characteristics based on Past and Present Data (과거 및 현재 자료 기반의 하천지형학적 특성 분석)

  • Lee, Chan Joo;Kim, Ji sung;Jeon, Ho Seong;Kim, Woo Ram
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.110-110
    • /
    • 2015
  • 하천 복원을 위해서는 자연 상태에서의 복원 대상 하천의 거동에 대한 지형학적 정보가 필요하다. 하지만, 국내 하천은 대부분 개수되어 있고, 참조하천으로 활용할만한 하천 역시 찾기가 어려운 실정이다. 이에 대상 하천의 과거 자연 상태에서의 자료와 현재 자료를 병용함으로써 지형학적 분석에 필요한 정보를 얻는 방법을 제시하였으며, 미호천과 내성천을 대상으로 분석을 실시하였다. 분석은 강턱하폭, 강턱유량과 하도 패턴(channel pattern), 그리고 하천의 유형과 관계된 지배적인 프로세스에 초점을 맞추었다. 분석 결과 강턱하폭은 강턱유량에 비례하여 증가하였으며, 그 경향성은 기존의 연구 결과와 대체로 일치하였다. 강턱유량과 하도경사간의 관계를 분석한 결과 미호천은 사행하천과 망상하천의 특성을 나타내는 반면, 내성천은 대부분의 구간에서 망상하천 특성을 보이는 것으로 나타났다. 하도경사와 하폭수심비 관계를 이용하여 지배적인 프로세스를 분석한 결과 미호천은 사구-연흔의 특성을 나타내고 있으나 내성천은 하류에서는 망상하천 특성이 지배적인 반면, 상류에서는 여울-소 내지는 평하상 특성이 지배적인 것으로 나타났다. 현재와 자연상태로 판단되는 과거 시점의 자료를 병용하여 분석한 결과들은 정비된 하천의 자료를 이용한 분석 결과에 비해 합리적인 것으로 나타났다.

  • PDF

Development of Business Process Model for Overseas Natural Gas Pipeline Project at the Project Planning Phase (해외 천연가스 파이프라인 사업 진출을 위한 사업계획단계 의사결정 프로세스 모델 구축)

  • Sin, Eonill;Han, Seung-Heon;Jang, Woosik;Lee, Yong-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.473-481
    • /
    • 2012
  • Demand of Natural Gas (NG) consumption is continuously increasing by long service life and low environmental impact than other fossil fuels. Because of this reasons, Gas wells exploration and huge LNG plant construction project are being boosted world-widely. Especially, overseas NG pipe-line projects are emerging by considering safe and efficiency at the inter-country sections. At the same time, Korean contractors are being achieved to record-breaking performance at 2011's overseas construction market and 80% of new-record was attained from overseas plant construction projects. Nevertheless, Korean contractors are behind than overseas leading contractors by geographical distance from gas wells and concentrated demand for storage plant. In these reasons, this paper aims to develop the standardized business process model(BPM) for overseas NG pipe-line project at project planning phase to support the project entry. To this aim, first of all, extract the BPM through the broad literature and overseas construction market review and domestic/overseas pipe-line project analysis. Second, Test-bed was performed to confirm of practical applicability by 4 experts. And then 15 experts survey were performed to validate the usability and effectiveness of BPM for overseas NG pipe-line project. Consequently, if Korean contractors are using this BPM with their own know-how and experiences, it will be returned to more reasonable and rational references for decision making in overseas NG pipe-line project.

Evaluation for Application of the Structural Interface based on BIM (BIM 기반 구조 인터페이스의 적용성 검토)

  • Cheon, Jin-Ho;Shin, Tae-Song;Eom, Jin-Up
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.379-382
    • /
    • 2011
  • 최근 건설 산업에서는 BIM 기반으로 건설프로젝트의 설계에서 부터 시공까지의 업무프로세스를 개선하기 위한 다양한 연구가 진행되고 있다. 본 연구에 앞서 건축구조물을 대상으로 구조설계, 구조해석, 상세설계 등을 수행할 수 있는 상용소프트웨어간의 구조 설계정보 교환을 위한 인터페이스 시스템을 개발하였다. 본 연구에서는 인터페이스 시스템을 실제 구조물의 설계 프로세스에 적용하여, 본 시스템에 대한 실무 활용성 및 문제점 등을 언급하는 적용 사례를 보여주고자 한다.

  • PDF

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

A Study on the Improvement of Amending Process and Depreciation Measurement Method of the Standard Estimating System (건설공사 표준품셈 제.개정 프로세스 개선 및 손율산정방안에 관한 연구)

  • Ahn, Ji-Sung;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.481-486
    • /
    • 2008
  • Standard Estimating System, which can be used for estimating a construction cost, has been pointed out having some problems such as non-reflecting a variety of construction environments and site conditions, non-adapting new technologies and methods since it was established in 1970. For solving these problems, the Korean Institute of Construction Technology(KICT) has chosen organizations for amending Standard Estimating System. However they have had many mistakes in the process of amending works because of non-establishing amending process and absence of the depreciation measurement method. This research derived the necessity to improve the amending process of the Standard Estimating System, and presented the detailed amending process and the performing method in the each process. Furthermore, this research proposed the depreciation measurement method available for the construction industry by means of analyzing researches that performed in the manufacturing industry and the measurement method for depreciation of general accounts.

  • PDF

Development of Maintenance Prototype for Dam Facilities Using NFC Technology (댐 시설물의 NFC 기반 이력관리시스템 프로토타입 개발)

  • An, Ji-Won;Park, Jin-Hong;Jang, Won-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.261-271
    • /
    • 2014
  • Construction industry becomes large and complicated as that occurred in the construction processes and operations, and the growing social demand for more systematic and efficient methods of integrated management increases. Current facility maintenance system has been regarded as large labor-intensive and fairly stagnant, and faced on several issues including inefficiency in cost and time to collect and utilize various field information. Thus, this paper presents a maintenance prototype utilizing NFC technology and smart devices to efficiently collect and manage the field information in the course of the construction processes. By choosing dam facilities as a case study, construction data for dam inspection and maintenance were classified according to dam maintenance guideline, and database structure was constructed to incorporate with the NFC tags and smart device interface. The system prototype presented in this paper would improve the quality of the dam facilities maintenance system and provide business convenience and usability by contributing increased efficiency of field information management and sharing.