• Title/Summary/Keyword: 건설통합관리

Search Result 633, Processing Time 0.035 seconds

Strategy Planning for the Development of the Facility-Based Lifecycle Integrated Project Information Portal (시설물 기반 생애주기 통합 건설정보 체계 구축 전략 연구)

  • Kim, Sung-Il;Cho, Jung-Hee;Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.9
    • /
    • pp.26-36
    • /
    • 2019
  • Since more than 30 different information systems are collecting and providing construction related information, it is difficult for information users to figure out where and how to acquire the required information. Even if the user find the information, it is hard to meet users demand. Because the current systems accumulate the data just as administrative data and can do not connect the information from the different phases of the lifecycle for the specific facility. The information collected and managed in different information systems should be integrated in terms of lifecycle of the facility to improve money for value of public investment, the quality of life by improving quality of the facility and to provide the foundation for big data utilization in the construction industry. This paper suggested strategic planning for the development of the (assumed name) "The Lifecycle Integrated Construction Information Portal" as a foundation to use the data in construction industry, by investigating prerequisites and suggesting conceptual framework of the system.

열정! 건설현장 - 태영건설 시스템, 감성, 열정의 안전관리 전개

  • Jeong, Tae-Yeong
    • The Safety technology
    • /
    • no.194
    • /
    • pp.21-23
    • /
    • 2014
  • 창원시와 마산시, 진해시가 합쳐져 지난 2010년 출범한 통합 창원시. 3개시가 통합되면서 인구 110만명에 달하는 거대 기초단체가 설립됐다. 이에 발맞춰 이곳에서는 각종 사회기반시설, 생활편의시설들이 속속 들어섰고 이 가운데에는 신(新) 주거문화의 중심을 이끄는 것도 포함돼 있다. 바로 태영건설이 야심차게 시공하고 있는 '마산메트로시티 2단지 아파트'가 그것이다. 특히 이곳은 경남에서는 최초의 초고층아파트(최고층 55층)라는 상징성까지 갖고 있다. 때문에 이곳을 시공하는 태영건설에서는 안전에 남다른 관심과 노력을 기울이고 있다. 조그마한 사고도 이런 명성에 오점을 남길 수 있기 때문이다. 무재해 준공을 목표로 하고 있는 이곳의 안전관리가 어떻게 전개되고 있는지 찾아가 봤다.

  • PDF

A Study for Integrated Operation of SWG program based on Scenario (시나리오 기반 SWG 프로그램 통합 운영에 대한 연구)

  • Kang, Hyun Joong;Gwon, Yong Hyeon;Jung, Ji Won;Jung, Seung Kwon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.638-638
    • /
    • 2015
  • 스마트워터그리드는 기후변화 등 한정된 수자원을 효율적으로 활용하기 위해 정보통신기술을 이용하여 효율적인 물 관리 인프라 시스템 구축하는 연구로써 수자원관리에 필요한 여러 가지 프로그램들이 개발되어지고 있다. 수자원 관리와 정보통신기술의 패러다임 변화에 따라 양방향 통신의 다차원적인 접근 전략과 더불어 수자원의 효율적인 관리를 위해 스마트워터그리드의 여러 프로그램을 통합적으로 운영 관리하는 기술이 필요하다. 따라서 본 연구에서는 시나리오 기반으로 스마트워터그리드 프로그램의 입 출력 데이터를 연계 운영하고, 동일한 개발환경인 플랫폼기반으로 구축하여 프로그램의 통합 운영이 가능하도록 하였다. 통합적인 운영을 위한 시나리오는 다중수원의 실시간 계측과 수용가의 상수도 사용량을 실시간 계측하여 DB서버에 저장되고, 이 자료를 물부족 위험평가 프로그램의 입력자료로 활용하여 다중수원의 부존량이 산정된다. 부존량은 다시 가용수량 산정프로그램에 입력 데이터를 사용되고, 출력데이터는 수처리조합공정을 걸쳐 워터루프를 통하여 배분 및 공급하도록 시나리오를 수립하였으며. 이러한 시나리오를 기반으로 스마트워터그리드의 여러 프로그램을 통합 운영하였다. 본 연구를 통해서 수자원 생산, 배분, 공급 등 관리에 필요한 각각의 스마트워터그리드 프로그램이 통합 운영됨으로써, 국내 통합 수자원 관리에 효율적으로 활용될 수 있을 것으로 기대된다.

  • PDF

Earned Value Management Systems Using 4D-CAD (4D CAD 활용을 통한 공정-원가 통합 시스템)

  • Park Ji-Ho;Jung Young-Soo;Kim Sung-Mo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-508
    • /
    • 2003
  • Cost and schedule are the major concerns for the successful construction project management. The four dimensional CAD (4D CAD) integrating graphical data and scheduling data has also been an area of research interests for improving construction controls. In order to achieve the benefits from these areas in an integrated way, this study proposes a 4D-EVMS system for the owners. Managerial requirements for cost and schedule control for the owners are identified first. A 4D-EVMS model is then proposed which provides functional flexibility in order to enhance the efficiency of the system. Lessons learned and practical implications are briefly summarize.

  • PDF

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

도시가스안전관리기준통합고시 중 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.140
    • /
    • pp.29-36
    • /
    • 2002
  • 도시가스안전관리기준통합고시 중 일부가 산업자원부고시 제2002-31호가 지난 3월 9일 개정되었다. 이 고시에는 그 동안 우리 협회 가스시공위원회(위원장 이영일)가 PE관 버트 융착 시공기준에 따른 문제점을 건의한 것이 받아들여져 2002년 3월 1일부터 착공되는 공사부터 PE관은 동일한 호수의 관종류를 사용토록 개정되었다.

  • PDF

Management of Governance for Integrated Water Management of Rural Water (농촌용수 통합물관리 거버넌스 운영)

  • Maeng, Seung Jin;Kim, Da Ye;Hong, Eun Bi;Kim, Min Soo;Ihm, Kyoung Mook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.498-498
    • /
    • 2022
  • 통합물관리를 위한 농촌용수 이 치수 관련 거버넌스를 체계화하고 기반을 마련하고자 지역 내 거버넌스 및 통합물관리에 대한 사례조사, 의견 수렴, 토론 및 소통 등의 과정을 거쳐 사회적으로 수용성이 높은 '농촌용수 통합물관리 거버넌스의 운영 방안' 모델 개발을 중심으로 수행하였다. 우리나라의 물관련 거버넌스는 해당 유역과 단체의 물문제를 중심으로 활동하고 있으며, 국가적 차원의 통합물관리 체계에 발맞춰 나가기 위해서는 농업인 거버넌스 활성화가 필요하다. 또한 농업인 거버넌스는 농업용수 등 물관련 문제 해결에 적극 참여하여 협력과 소통을 기반으로 농업용수부문의 주도권을 확보하여야 할 것이다. 지역 물관리 현황 분석 및 현안 과제를 도출하기 위해 최근 농업용수와 관련한 민감한 이슈가 있는 금강유역 내 위치한 지구를 시범지구로 선정하였다. 논 시범지구는 현북 양수장으로 선정하였으며, 비교지구는 정암 양수장으로 선정하였다. 시범지구인 현북 양수장은 충남 부여군에 위치하고 있어 농업인 단체의 지역본부나 지회가 참여 할 수 있도록 하였다. 또한 통합물관리를 위한 현장의 주체인 수감원과 시설관리기관인 한국농어촌공사 부여지사가 참여하도록 하였다. 농촌용수 통합물관리 거버넌스는 협의의 거버넌스와 광의의 거버넌스로 구분하였다. 협의의 거버넌스 구성은 해당지구의 농업인, 기초지방자치단체, 한국농어촌공사 지사 등으로 구성한다. 광의의 거버넌스 구성은 해당지구의 광역 및 기초지방자치단체, 한국농어촌공사 지사, 지역의 농업인 사회단체 등 10개 이내의 기관과 단체로 구성한다. 거버넌스의 주된 활동은 해당 지역·지구의 농업용수 관리 개선 및 농업인의 적극적 참여를 위한 광역지방자치단체, 기초지방자치단체 및 한국농어촌공사와의 소통과 협력, 갈등을 조정한다. 이와 더불어 농업용수관리 개선을 위한 정책개발, 기존 제도의 개선, 효율적인 물관리를 위한 실천사업 관련된 다양한 연구조사사업 수행, 지역 농업인 영농 활동의 질 향상을 위한 욕구 조사, 중복규제 등 현안 사안에 대한 법 및 정책 개선, 대안 발굴 등 정책과 제도운영 및 개선방안 연구·조사 사업에 전력투구하는 조직체로서 기능을 수행한다. 따라서, 농업인들이 자발적으로 국가적 차원에서 제시하는 농업용수 관련 정책을 따르기 위해 농촌용수 통합물관리 거버넌스를 통한 정책 제안이 반드시 필요하다.

  • PDF