• Title/Summary/Keyword: 건설자재통합정보시스템

Search Result 15, Processing Time 0.028 seconds

Development of System Model for Integrated Information Management of Construction Material (건설자재 통합정보 관리를 위한 시스템 모델 구현)

  • Han, Choong-Han;Ju, Ki-Bum
    • The KIPS Transactions:PartD
    • /
    • v.16D no.3
    • /
    • pp.433-440
    • /
    • 2009
  • As information technology of constructional area develops recently, web-based on-line system is rapidly increasing to provide information on diverse constructional materials so as to enhance productivity of constructional business and to reduce cost. Since the constructional materials information provided by these systems, i.e., quality, specification, etc are not standardized, however, the staffs on the constructional site suffer considerable difficulties in using materials information when acquiring information on specific materials, e.g., using diverse information systems or repeating similar jobs. Thus, this research typified information items of constructional materials on the basis of GDAS and designed multi system model to control integrated information on constructional materials. This system can efficiently control and utilize materials information by supporting automatic classification of constructional materials to which OmniClass Part-22 and UNSPSC are applied, conditional complex retrieval of materials information, real-time automatic embodiment of electronic catalog and retrieving/controlling RFID.

Development of A Function supporting estimate of System for Construction Material Information (건설자재 통합정보시스템의 견적지원 기능 개발)

  • Song, Jong-Kwan;Han, Choong-Han;Ju, Ki-Beom;Nah, Hei-Sook;Choi, Won-Sik
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.1521-1524
    • /
    • 2011
  • 정보화의 발전은 모든 산업의 시스템화 및 자동화를 이끌어가는 원동력으로 국가 산업에 융복합되어 시너지효과를 발현하고 있다. 이러한 정보화의 일환으로 건축공사의 50~60%차지하는 건설자재의 정보화는 필수불가결한 요소이다. 특히 건설자재의 가격정보는 자재선정을 위한 결정적인 요소임에도 불구하고 현장여건에 맞는 정확한 가격정보를 제공하기에 어려움이 있는 것으로 조사되었다. 따라서 자재선정 의사결정자가 건설자재의 다양한 정보항목을 검색하고, 활용할 수 있는 건설자재에 대한 정보제공 시스템의 필요성과 온라인을 통해 현장여건에 맞는 가격정보 제공의 필요성이 대두 되었다. 이에 본 논문에서는 자재선정 의사결정자들이 온라인 자재정보시스템을 통해 검색한 자재의 현장여건에 맞는 가격정보를 빠르게 획득할 수 있도록 지원하는 견적지원 기능을 제시한다. 이 시스템은 관계데이터베이스를 통해 정보를 저장하고 활용한다. 본 연구는 건설분야 종사자들에게 건설자재선정을 위한 지원 도구로써 활용될 것이며, 이는 최적자재선정을 통한 건축물의 품질을 개선하는데 기여할 수 있을 것이다.

Information management system development of construction material based on international data attribute (국제 데이터 속성 기반 건설자재 정보관리 시스템 구축)

  • Choong-Han Han
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.11a
    • /
    • pp.645-648
    • /
    • 2008
  • 최근 건설 분야의 정보화 기술이 발달함에 따라 건설생애(Life Cycle) 과정에서 파생되는 방대한 양의 정보를 수집·가공·축적·제공 하는 시스템이 급증하는 추세이다. 특히, 건설공사의 주요요소인 자재 정보를 제공하는 Web 기반 온라인 시스템만 현재 110여개 이상으로 토목·건축·설비·소방 분야에 이르기까지 매우 다양하다. 그러나 이러한 시스템에서 제공 중인 정보가 표준화 및 정형화 되지 않아 건설현장 실무자들의 정보 획득에 있어 많은 어려움을 겪고 있다. 이에 본 연구에서는 정형화되고 표준화된 건설자재정보를 제공하기 위해 건설자재 분류체계를 정의하고 건설자재 속성정보를 정형화하여 자재별 분류체계검색, 통합검색, 카테고리검색 뿐만 아니라 전자카탈로그로 변환 및 생성이 가능한 건설자재정보 관리 시스템을 설계 및 구현 하였다.

Automation of Construction Management System for Bridge Construction Site (교량 건설현장의 시공관리 자동화 기술 연구)

  • Lee, Kee Sei;Choi, Jun Ho;Jiang, Meiling;Kang, Young Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.164-164
    • /
    • 2011
  • 최근들어 교량 건설 프로젝트는 그 규모가 방대해 졌을 뿐만아니라, 건설에 사용되는 장비 및 자재, 인력의 종류 또한 다양해 지고 있다. 이에 따라 종래 구조적 안전만을 추구하던 건설현장은 이러한 제반 요소들을 효율적으로 관리하여 경제성뿐만 아니라 시공의 효율성 까지 고려할 수밖에 없게 되었다. 따라서 건설 현장의 진도 및 자재, 인력관리는 현대 건설 산업의 주요 과제라 할 수 있다. 이에 따라 본 연구에서는 현장의 시공정보를 무선으로 송신할 수 있는 단말기 및 RFID를 이용하여 종래에 시행되던 작업을 자동화함으로써 작업의 편리성을 도모하고 이를 통하여 시간과 인력의 낭비를 줄일 수 있는 시공관리 시스템에 대한 모듈을 제안 하였다. 제안된 시스템은 3D모델을 기반으로 하여 진도 및 공비를 한눈에 알아볼 수 있는 방안을 제시한다. 사용자는 현재 진행되고 있는 공정을 3차원 모델에서 확인할 수 있으며, 현재까지 사용된 비용 및 공정률을 손쉽게 확인할 수 있다. 3D모델은 공사 시작 전 공정에 맞추어 분절된 형태로 제작되어 현장에서 송신한 위치정보가 통합관리 시스템에서 수신되면 해당 새그가 화면에 나타나게 된다. 3D모델은 공정시각화의 역할을 할 뿐만 아니라 각 새그에는 사용된 자재의 종류나 수량등이 DB화 되어 있어, 실시간으로 공사에 사용된 물량을 산출 할수 있도록 한다. 시공정보의 수신은 각 자재에 부착한 RFID태그를 직접 읽어서 송신하거나, 작업자가 시공상황을 단말기를 통하여 직점 송신함으로써 이루어지게 된다. 수집된 시공정보는 3D모델과 연계됨과 동시에 통합관리 시스템에 내장된 DB와 연결되어 사용 자재 및 물량에 대한 비용산출에 중요한 역할을 하게 된다. 현재 우리나라의 교량 시공 현장에서는 기성청구시 내역서를 기준으로 비용을 산정하게 되는데, 시공관리 통합 프로그램에서는 각 공정이 DB화된 내역서와 연계되어 3D모델에서 얻어진 물량으로 공비를 산출하는 과정이 자동으로 이루어지게 된다. 이러한 과정은 단일 현장뿐만 아니라, 공구 내의 여러 교량 현장에 대하여도 적용이 가능하므로, 방대한 현장의 공사관리에 소요되던 시간과 노력을 절감 할 수 있다. 본 연구를 통하여 현장에서 이루어지는 공사관리 작업에 대해 IT기술을 접목하여 자동화 할 수 있는 방법에 대한 알고리즘을 제시하였다. 이는 모바일 오피스 및 단말기를 이용하여 현 공정까지 사용된 물량, 인력, 장비 정보를 관리하는 한편, 현재까지 진행된 공사 내용을 3D모델을 통하여 한눈에 알아볼수 있는 교량 건설현장 통합관리 시스템의 모듈을 제공한다. 이에따라 공무 작업에 소모되는 인력 및 시간을 크게 절약 할 수 있을 것이라 판단된다.

  • PDF

Method of RFID Network System Application for Improving of Construction Productivity in Construction Site (건설생산성 향상을 위한 건설현장 내 RFID 네트워크 시스템 적용 방안)

  • Kim, Shin-Gu;Lee, Choong-Hee;Lee, Sung-Hyung;Kim, Jae-Hyun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.8B
    • /
    • pp.1224-1231
    • /
    • 2010
  • We study the RFID network system in a construction site, and study the connection method between the RFID network system and the integrated information system of construction material. Moreover, we developed a prototype of the construction site RFID server for the management of construction materials and performed the pilot application in a construction site. Through the pilot application, it was known that the proposed RFID network system can be more usefully applied in the construction sites. The results of the pilot application show that the RFID network system is faster, more accurate, and more reliable than the existing system of information management and achieves improvement in construction productivity.

Web-based Distributed Lean Construction Information System;Development of System Prototype (웹 기반 분산형 린건설 정보시스템 개발;시스템 프로토타입 개발)

  • Park, Moon-Seo;Yoon, You-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.182-189
    • /
    • 2007
  • To reform and improve the productivity of construction industry, 1) it should be encouraged to improve the construction production process and 2) it is required to enhance reliability of construction information based on the systematic thinking process. To promote the information reliability created during construction production process, Lean Construction Research Center(LRC2) is developing a supporting system to improve design/material supply/schedule management, functioning to efficiently manage the information created at construction production processes and developing a web based construction information system that provides result management/decision making support/knowledge based information services.

  • PDF

Development of Data Warehouse for Construction Material Management (건설공사 자재 관리를 위한 데이터 웨어하우스 개발)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.319-325
    • /
    • 2011
  • During a construction project, construction managers must be provided with material information to help them to make decisions more efficiently without delaying the delivery of material. Construction work can be smoothly performed with the proper material supply. Construction duration depends on several material-related decisions, including the order, delivery, and allocation of material to the correct work location. Hence, it is worthwhile to introduce data warehouse techniques that generate subject-oriented and integrated data to construction material management. The data warehouse for construction material management can perform multidimensional analysis and then define KPIs (Key Performance Index) in order to provide construction managers with construction material information such as lead time, material delivery rate, material installation rate and so on. This research proposes a method of effectively facilitating large amounts of data in the operating systems during the construction management process. In other words, the proposed method can supply structured and multi-perspective material-related information using data warehouse techniques.

Development of a Materials Management System Considering Construction Supply Chain Management (건설공급사슬을 고려한 건설공사 자재관리시스템 개발)

  • Jang, Myung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.87-93
    • /
    • 2009
  • A construction supply chain needs an integrated information system, as the general contractor and subcontractors must communicate regularly with one another and share a substantial amount of information in their cooperative work. In the construction industry, supply chain management is necessary in the management of a system, including business process improvement, participant-oriented management, and the supply chain. This research proposed a supporting system and developed the prototype focusing on materials that play an important role in the supply chain. Construction projects are managed mainly through schedule management. As such, supply chain management should be linked with schedule management. The research implemented a prototype of the supporting system for construction supply chain management. The prototype was implemented in Microsoft Project using VBA, including a simulation tool based on @Risk for Project.

An Experimental Study for RFID Application of Construction Materials in an Apartment House Construction Site (건설자재의 공동주택 현장 적용을 위한 RFID 부착 및 인식에 관한 실험적 연구)

  • Ju, Ki-Beom;Han, Choong-Han
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.67-75
    • /
    • 2009
  • While the trend of all industries recently lies in combination, construction industry is much interested in enhancing efficiency and competitiveness in the aspect of site control by adopting RFID. Though RFID has been applied to diverse areas thus far, it cannot be easily applied to construction industry due to diverse physical, chemical and use-environmental properties of construction materials. Furthermore, it is rarely applied to the site because of many problems in its application. It is required to prepare RFID code issuance and system that can systematically control the code as well as to research the standardization of frequency, specification, protocol, package method, recognition method, etc in order to apply RFID to construction industry. In this research, RFID code issuance and management program are proposed as a part of program research to apply RFID. Furthermore, the restricted matters of existing RFID tag are drawn to produce pilot product of RFID tag that can solve it so as to perform site application test. According to the experiment, effective recognition distance varies depending on material/environmental property and control efficiency changes depending on attachment method and application method. Thus, preparing diverse restrictive factors and solutions by systematically analyzing control method(medium, process) of current architecture materials and applying it to construction site can be the way to successfully apply RFID.

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.