Korean Journal of Construction Engineering and Management
/
v.10
no.6
/
pp.13-27
/
2009
Construction companies are trying to apply process management to their business to improve efficiency in business circumstance of high competition and globalization. Since 1990s, construction firms adopted process management to improve internal and external business structure based on process. It however has a few improvement functions. In addition, business support systems for business process efficiency improvement were developed, but separation between business process and IT system occurred because it focused on function-based individual construction and data input/output. To solve this problem, this study proposed business process and IT integration model for supporting user to use business information and system based on visualized business process and improving use of previous business support system. Business efficiency is expected to be improved with this model which based on integration required business condition(stakeholder, business data, functions of business supporting system). This study developved process model, architecture, and BPA of whole construction management business. According to BPA, it analyzed business process stakeholder, detail activities, and input-output data. And also it examined 12 main business supporting system of Korean construction firms. Based on analyzed data, this study developed business process supporting integration model based on business process through PDCA and CRUD analysis.
Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.80-88
/
2010
The construction industry concentrates their efforts on construction information technology (IT) including construction CALS. However, the actual circumstances for construction IT focuses on building hardware and it neglects importance of business process reengineering (BPR) for construction tasks. A systematic process modeling method and a computerized model by process concept need for building construction BPR. This study develops a generalized BPR procedure for construction projects, and then suggests a new process modeling method for construction BPR that consists of object-related process model (ORPM). Finally, this study develops a web-based ORPM Builder (ORPMB) based on the ORPM methodology, and the applicability of the developed system is verified by a case study with practical construction processes.
Korean Journal of Construction Engineering and Management
/
v.11
no.1
/
pp.16-28
/
2010
Construction companies are fulfilled in according to project, and it is difficult to execute the standardized process in various construction projects. Thus many construction companies is adopting BPM(Business Process Management) that meet business process change and business improvement. However, it is difficult to apply BPM in a lump because of difference of BPM characteristics and company's strategies. For this reason, it is desirable to select business process based on company's priority. This study indicated need of method for selecting business process through studying current researches, and made BPA for construction company by analyzing business process in construction company. Moreover, this study indicated core business process from a point of profitability and growth view through grasping strategic goal priority. And also, it proposed criteria for process evaluation for BPM adoption, evaluated core business process, and indicated prior business process for BPM adoption.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.151-158
/
2003
Recently, the off-line processes in the construction industry are being changed to the electronic processes by several information technology (IT) tools including CALS. To improve the business processes to on-line processes, the business process reengineering (BPR) is a representative methodology for reviewing unnecessary and additional processes from the established business procedure. This study suggests a new process modeling method for construction BPR (CBPR) that consists of object-related process model (ORPM). In suggested modeling method, the connection with IT tools such as Workflow, enterprise resource planning (ERP), construction CALS, and business breakdown structure (BBS) was considered. The ORPM in the study is the main model for representing the detailed construction processes. It consists of nine relationship and six diagrams to represent the relationship between construction activities and the direction within the process model. Those models suggested from this study can be a useful tool for the CBPR because the researches and the practical applications related to the BPR of construction project are insufficient in our construction industry.
Proceedings of the Korean Information Science Society Conference
/
2006.10c
/
pp.443-447
/
2006
경영환경의 변화에 대한 기업의 대처능력이 곧 생존에 직결되고 있는 시점에서 이에 대한 해결책으로 통합업무 프로세스를 지향하는 ERP(Enterprise Resource Planning)을 통하여 경쟁력을 강화하려는 노력이 진행되고 있다. 그러나 ERP는 적용상의 어려움과 실제 업무와의 차이점으로 인하여 막대한 노력을 들이고도 성공적으로 업무에 활용되지 못하는 사례가 많은 실정이다. 특히 건설업의 경우는 주문생산 방식의 프로젝트 특성 및 영세한 외주업체와 협업해야 하는 환경요인으로 인해 전산환경과 정보화에 많은 제약사항들을 가지고 있다. 본 연구에서는 건설업체 D사의 예를 들어 건설업 ERP 패키지를 도입하여 업무 개선에 적용한 사례를 소개하였다. 건설사 고유 업무인 공사관리 업무 및 일반관리 업무를 대상으로 현행 프로세스를 진단하고 문제점을 도출하였으며 ERP의 Best Practice를 바탕으로 프로세스 개선방안을 제시하였다. 회사는 ERP와 유기적으로 연결된 개선안의 추진을 통해 지속적인 경영혁신 활동의 토대를 구축하였으며 이에 따른 정성적, 정량적인 성공요인을 분석하였다.
Korean Journal of Construction Engineering and Management
/
v.9
no.6
/
pp.194-203
/
2008
Construction companies require management system to increase efficiency and profit because of receiving competition and globalizing business environment. Since 1990s, construction companies have made various attempts to innovate business structure both internally and externally by means of BPR, 6 Sigma, PI, and Workflow. Some improvements were made, but most of them were temporary, and insufficient to provide the much-needed promptness of business process in responding to the changes. Furthermore, the recent methods of applying BPM and practical using are limited to the theory and method of other industries, and also the attempts of applying BPM in construction industry are at the stage of theoretical approaching and examining in a few construction companies. Accordingly, this study deduces the necessity of adopting BPM based on change of business paradigm for construction companies and limits of current researches, failure causes and problems of application attempts of BPM and process management. And also, we analyze Advance of BPM and suggest the application method of business process management model for construction companies.
Korean Journal of Construction Engineering and Management
/
v.7
no.6
/
pp.90-98
/
2006
As management is becoming a focus of a construction industry, conprehensive construction management is needed. Thus a plan of improving a design work process for developing design work capacity is proposed. The plan of improving a design work process based on a information flow for decision makings is expected to be a good ground material of not only smooth communication among stakeholders and information tracing, but also effective management of whole process. Theplansuggestedinthisstudyissummarizedas: (1) Detailed and clear work definition (2) information-oriented work definition (3) Strengthening works related to design management
Korean Journal of Construction Engineering and Management
/
v.11
no.1
/
pp.3-15
/
2010
Many enterprises have adopted various management techniques and IT systems such as "Process Management", "ERP" for coping with rapid business environment change and for continual growth. However, the separation problem between business process and IT system which causes reduction of business management efficiency has occurred for the lack of integration management mechanism. To solve this problem, many companies try to adopt BPM (Business Process Management) concept. The purpose of this study is to identify this separation problem in Korean construction companies which are trying to apply BPM to their business through evaluating IT system support to business processes. This study indicated the need of evaluation through current researches and case studies, then made hierarchy of home business of construction companies and analyzed IT systems for supporting business. The evaluation method is designed based on these researches. This study proposed the implications for adopting BPM in construction companies based on evaluation results analysis.
Korean Journal of Construction Engineering and Management
/
v.21
no.2
/
pp.70-78
/
2020
Construction program management requires more systematic management than traditional management methods due to the complexity of the project and various stakeholders. In particular, the systematization of closure phase of the process is in urgent need as there is a difference between the owner's expectations and the contractor's deliverables, resulting in delayed handovers, conflicts, frictions, and increased legal disputes. This study identified the process and activities of closure phase through domestic and international literature and case studies for the successful closure of the construction program. Further, the proposed processes and activities were verified through expert verification for appropriateness and the possibility of application to the site. By utilizing the processes and activities proposed in this study, the project aims to overcome the limits of closure phase and improve the satisfaction of the owner, as well as to enhance the global competitiveness of domestic construction companies.
Korean Journal of Construction Engineering and Management
/
v.10
no.5
/
pp.16-27
/
2009
Recently construction companies expand position for apartment house in construction market because of house supply rate increase and its amount. In addition, because the focus of house sale market has moved to customer from supplier, the importance of defect management is being issued currently. However, current apartment defect management is not satisfied with customer's demand for the lack of business process management, management organization, information feedback, and readiness for defect in construction phase. To solve this problem, this study proposed business process management improvement model for defect management. Proposed improvement model make information feedback, defect management business quality improvement, and improper process improvement through integrating defect management and quality management. It is expected to contribute to customer's satisfaction improvement and reliance improvement for construction companies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.