• Title/Summary/Keyword: 건설성과

Search Result 1,594, Processing Time 0.031 seconds

Comparative Analysis of the Weights of Performance Measures Index According to the Size of Construction Companies (건설기업의 규모에 따른 성과지표 가중치 비교분석)

  • Jung Won-Jo;Yu, Il-Han;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.419-422
    • /
    • 2004
  • Qualitative management structure of construction companies in Korea are relatively inadequate in comparison with quantitative growth. To improve qualitative management structure, we need to make impartial performance measurement system which arouse participants responds. It is important to select and decide performance measurement index to company and participants. And it is also important to take the weights. For that, we figure out the weights of performance measurement with HSC by Kaplan & Norton.'1'o find out the characteristics of the weights which was classified according to size of the construction company, we analyse and compare with each weights. The result of this Paper will contribute to operate performance measurement system that make raise efficiency and maximize the performance of companies.

  • PDF

Analysis and Prioritization of Factors Causing the Inefficiency of Domestic Public Construction Projects (국내 공공건설사업 비효율 유발 요인 분석 및 우선적 개선 요인 도출)

  • Chang, Chul-Ki;Yoo, Wi Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2093-2105
    • /
    • 2013
  • Successful implementations of domestic public construction projects have been increasingly concerned with the efforts to improve the inefficient execution. However, the existing factors causing the inefficient execution have been repeatedly occurred in many projects. This is because the previous studies have been concentrated on identifying the factors without in-depth analysis and systematic prioritization. This study has clarified the characteristics of the inefficient public construction projects, identified the causes, constructed their hierarchical structure, and analyzed the impacts on them. In particular, the critical factors causing the inefficient execution are prioritized by the outcomes derived from the questionnaire surveys, which is limited to the pre-construction stage. They are utilized in prioritizing the institutional and political improvements. However, in the future, the analytic and detailed guideline for remedying the factors causing the inefficient execution of a project should be studied, and their analysis will be extended to the construction stage.

BSC Perspective of an Exploratory study of Developing CSF/KPI Pool in Korean Construction Industry (국내 건설 산업의 BSC관점의 CSF/KPI Pool 개발에 관한 연구)

  • Oh, Ic-Jin;Lee, Jung-Hoon;Lee, Choong-C
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.600-607
    • /
    • 2005
  • 최근 무형자산의 중요성과 함께 많은 선진기업들은 지속적인 가치창출을 위한 전략수립 및 수행절차를 통해 경쟁우위를 갖는데 노력하고 있다. BSC는 기업의 전략을 전사조직 차원에서 실행 시킬 수 있는 기반을 조성하며, 기업의 자원을 핵심역량에 집중시켜 전략의 실행력을 구체화하기 위한 경영기법 중 하나로 자리잡고 있으며, 이미 국내 다양한 공공 및 민간부문에서 BSC도입을 통해 기업전략과의 연계를 강화해 나가고 있는 추세이다. 그러나 특정산업에 따라 각 산업의 특성을 고려한 BSC기반의 CSF(사업핵심성공요소)와 KPI(주요성과지표) Pool에 대한 실질적인 연구는 다소 미흡한 실정이다. 국내 건설업인 경우, 관리의 복잡성으로 인해 아직까지 재무적 손익 중심의 성과측정에 주로 의존하고 있으며, 비재무적인 측면의 다양한 성과지표를 포함하지 못하고 있는 실정이다. 이에 본 연구에서는 건설산업에 적합한 BSC관점을 고려한 건설업의 CSF/KPI Pool를 제시하고 도출된 CSF가 기업의 경영성과와 어떤 상관관계를 살펴봄으로써 실제 의미가 있는지 알아보는데 목적을 두고 있다. 본 연구결과는 건설 산업에서의 성과측정의 기초자료로서 활용되어 체계적인 성과관리의 향상에 기여하고 미래 성과창출의 유인을 제공하고자 한다.

  • PDF

Weights for Construction Performance Impact Factors of Public Construction Project (공공건설사업 건설성과 영향요인 가중치 개발)

  • Park, Yong-Woo;Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.373-379
    • /
    • 2012
  • Public construction projects are implemented by government or public agencies using public resources to enhance the welfare of the people. Therefore, this paper investigates the impact factors for public construction performance. Then, the weights for impact factors are assigned using AHP. The impact factors are categorized into construction policies, project management efforts, and project environment. Further, 16 detail impact factors are listed in each category. The results show that weights are ordered in appropriate budget, reasonable project implementation process, and pre-project planning. These impact factors are related with pre-construction management activities. However, construction related impact like procurement, work difficulty, and construction environment show relatively low weights. The results can be useful to improve construction performance with managing impact factors showed high weights.

Measuring Knowledge Management performance of the construction organization (건설조직의 지식경영 성과측정)

  • Kwon, Soon-Seok;Park, Moon-Seo;Lee, Hyun-Soo;Ahn, Chang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.868-871
    • /
    • 2007
  • The current economy is summarized by increasing business competitiveness and leaner organizations, and the risk and uncertainties inherent in such dynamic environments have increased the importance of managing organizational knowledge. Like the preceding, the construction industry is required to make an effort for survival and takeoff, and most construction companies recognize that knowledge management improves efficiency and effectiveness and the necessity on the innovation of business itself and it is the current of the times. But at this point in time, companies have doubts about performance following the introduction of KM, and set to show interest in developing a measurement method. So, This study analyzes the existing model for performance measurement and based on results derived, presents the method for performance measurement.

  • PDF

A Basis Study on the Influential Factors Analysis of Post-Evaluation Item of Performance Measurement System in Construction Project (건설공사 성과측정시스템의 사후평가항목 영향요인 분석에 대한 기초연구)

  • Lee, Eun-Ji;Ha, Hee-Yoon;Choi, Jin-Wook;Jung, Kyung-Taek;Park, Chi-Ho;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.347-350
    • /
    • 2006
  • Today the domestic construction industries are changing. The bigger, higher and more professional are gradually the construction industries, the faster does the fusion into the other industries also undergone. It is gradually needed to estimate the process of the project in the construction industries through this tendency. Consumers or the owner gradually reify their needs and it is essential for an objective appraisal standard to estimate the accomplishment of the project because its level is raised. In this study the problem is understood through the analysis on the existing system of construction industries and it is indicated to new performance measurement system in construction project through the analysis on the influential factors including the qualitative analysis such as consumer satisfaction.

  • PDF

Interaction Analysis between Construction Business Indicators and Business Performance Indicators of Specialty Contractors providing Labors (노무중심 전문건설업체의 건설경기지표와 경영성과지표의 상관성 분석)

  • Kim, Nam-Sik;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1893-1899
    • /
    • 2014
  • This study is to suggest strategies of specialty contractors that provide labors oriented engineering service by interaction analysis between construction business indicators and business performance indicators. For specialty contractors that mainly provides labor oriented engineering service, the amount of construction orders imposes lasting impact to the turnover ratio of current assets supposedly because they are operating current assets to secure labor. In other words, this type of specialty contractors are focused on mobilization of labor not materials or equipment. So, it is determined that they will be able to increase revenue by operating current assets to address current liabilities and labor mobilization.

Performance Index Analysis of Schedule Introducing EVMS (EVMS를 도입한 공정의 성과지수 분석)

  • Kim Young;Lee Young-Dae;Kim Sung-Hwan;Kim Jung-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.456-459
    • /
    • 2002
  • It is lately issued studies on EVMS(Earned Value Management System) throughout construction industry, which is management system integrating cost and schedule effectively. So identifying importance and circumstance of introducing EVMS, CPI(Cost Performance Index) and SPI(Schedule Performance Index), which are critical components on schedule introducing EVMS, calculate and it intends to analyze the trend and problem of cost and time throughout project management, applying various statistical data analysis method.

  • PDF