Efficiency Analysis of Tower Crane Lifting Work for Project Management of Construction (건축공사의 공정관리를 위한 타워크레인 양중 효율성 분석)

  • Bae, Jeong-Hyeon;Kim, Ki-Hyuk;Lee, Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.2
    • /
    • pp.63-69
    • /
    • 2019
  • Building Construction projects are getting higher and larger. Therefore, the use of Tower Crane, which is more productive than any other lifting plan shows a trend of continuous increases. However as equipment for transporting heavy goods, are is too expensive for the monthly rent and used inefficiently for construction. site so it is analyzed that it has problems of reducing productivity and efficiency of lifting work. Inefficient situations are arising like poor communications between operator and worker, occurrence of blind spots, securing the shortest distance of fire during movement after lifting plan, influences of weather, location of materials, movement radius of tower crane by each locations and ever-changing working environments. Therefore, in this study, we first made a list of tower cranes that are inefficiently used at the site, and then we made a checklist. After that, through field visits, we derived checklist for Tower Crane to comprehensive data value.

Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project (초고층 복합시설물의 4D CAD 모델링 사례연구)

  • Kwan Oh-Sung;Park Woo-Yul;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.187-192
    • /
    • 2001
  • High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.

  • PDF

Development of an Optimal Trajectory Planning Algorithm for Automated Pavement Crack Sealer (도로면 크랙실링 자동화 장비의 최적 경로계획 알고리즘 개발)

  • Yoo, Hyun-Seok;Lee, Jeong-Ho;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.68-79
    • /
    • 2010
  • During the last two decades, several tele-operated and machine-vision-assisted systems have been developed in construction and maintenance area such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans which are used in previously developed pavement crack sealing systems. The comparison is based on computational cost versus overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in productivity improvement of the automatic pavement crack sealing system developed.

Work Process Analysis of the High-performed Precast Concrete Columns using Simulation Technology (시뮬레이션 기법을 활용한 고성능 프리캐스트 콘크리트 기둥의 작업프로세스 분석)

  • Shin, Young-Su;Cho, Kyuman;Cho, Chang-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.49-57
    • /
    • 2014
  • Since the structure systems of construction projects have been forced to be large, high-rised, and complex, many researchers have been put their efforts to develop high strength concrete incorporating diverse advanced materials. In order to improve the performance of the concrete, the fibers leading high ductility to concrete have been used, consequently concrete columns adopting High-Performance Fiber Cement(HPFC) have been developed. This paper analyzed not only the construction work process of HPFC column installed to the real construction project, but also construction productivity of the columns by using discrete event simulation technique. As a result, several considerations on installing such a column have identified, compared with the works for typical concrete columns. In particular, there was specific characteristic to install the columns in terms of labor resource productivity, which is not shown with the work for the typical concrete columns.

A Study on field-watershed integrated model for assessing water quality impact in agricultural small watershed (농업 소유역에서 수질영향 평가를 위한 포장-유역 연계모형의 기초연구)

  • Kim, Dong Hyeon;So, Hyun Chul;Jang, Taeil
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.491-491
    • /
    • 2018
  • 본 연구는 포장모형(APEX, Agricultural Policy Environmental eXtender)과 유역모형(SWAT, Soil and Water Assessment Tool)을 연계하여 새만금 유역의 미래 수문 수질영향과 용수생산성을 분석하기 위한 기초연구이다. APEX 모형을 연계하기에 앞서 SWAT 모형을 이용하여 만경강 유역의 유출량, T-N, T-P를 모의하고 그 적용성을 평가하였다. 모의 기간은 2004년부터 2017년까지 총 14년이며, 기상, 유출량 그리고 월단위 수질 자료를 모형의 입력자료 및 보정을 위해 사용하였다. 매개변수 보정은 객관적 보정이 가능한 SWAT-CUP을 이용하여 최적화 하였으며, 매개변수 보정의 목적함수는 NSE(Nash-Sutcliffe Efficiency)로 평가하였다. 모형의 적용성 평가 결과, 보정기간의 연평균 유출량은 실측치 835mm, 모의치 677mm로 나타났고, R2는 0.64, RMSE는 3.87mm/day, NSE는 0.61, RMAE는 0.99로 나타났다. 검정기간의 연평균 유출량은 실측치 884mm, 모의치 702mm로 나타났고, R2는 0.67, RMSE는 2.92mm/day, NSE는 0.7, RMAE는 0.94로 나타났다. 유출량의 결과를 살펴보면 검정기간이 보정기간보다 모의결과가 더 나은 것으로 나타나며, 이는 실측자료의 일관성 차이로 판단된다. T-N과 T-P의 경우 매개변수만으론 보정의 한계가 있으며, 실측치와 근접하게 모의하기 위해서 만경강 본류에 영향을 끼칠 수 있는 외부유입량을 고려할 필요가 있다. 따라서 본 연구에서는 만경강 상류의 경천댐, 대아댐 그리고 용담댐으로 부터 유입되는 외부유입량 자료를 수집하여 SWAT의 입력자료로 구축하였으며, 대상유역 내 익산, 완주, 전주, 김제에 위치하고 있는 하수처리장, 축산폐수처리장, 분뇨처리시설, 산업폐수처리시설 그리고 농공단지처리시설 등 총 12곳에 대한 점오염원 데이터를 입력자료로 구축하여 만경강 상류 농업소유역의 수질영향을 평가하였다. 본 연구결과는 향후 미래 수문 수질 모의에 대한 기초자료로 제공될 것이며, 외부유입량을 고려한 만경강 유역의 용수생산성 분석을 통해 미래 농업수자원 관리계획 수립에 활용할 수 있을 것이다.

  • PDF

A Study on the Problem Analysis and Quality Improvement in Fabricating Free-Form Buildings Facade Panels through Mock-up Panels Production (Mock-up 부재제작을 통한 비정형 건축 외장부재의 제작 문제점 분석 및 개선방안에 관한 연구)

  • Kwen, Soon-Ho;Shim, Hyoun-Woo;Ock, Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.11-21
    • /
    • 2011
  • The most critical issue in free-form buildings is how to construct the free-formed exterior facade panels. Their geometric complexity delivers many cons and problems in fabricating and constructing their shapes. To construct a free-form building, first of all, its skin has to be chopped into small pieces, which is called panelization. After panelization, the panels go through an optimization process to construct them economically. The panel's geometries are modified or regenerated through this optimization process. In this study, the panel optimization process of free-form buildings are performed through a case study. The panel shapes of the case study are modeled with Digital Project. To test the constructability of the various panels, 8 mock-up panels are made and laser scanning technology is applied to measure the preciseness of the panels manufactured in comparison with their original design.

A Study of the Autonomous Driving Path Planning for Concrete Pavement Cutting Operation (콘크리트 도로 표면절삭 작업을 위한 자율주행 진로계획 수립방안)

  • Moon, Sung-Woo;Seo, Jong-Won;Yang, Byong-Soo;Lee, Won-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.929-933
    • /
    • 2007
  • Concrete Pavement Cutting Operation have Labor-intensive features. And Cutting Operation quality and productivity is influenced by operator's experience. Moreover Workers have risk of safety concerns. Therefore we need Concrete Pavement Cutting Operation automation system and system support software development on the economics. First of all we have to develop driving Path Planning for Concrete Pavement Cutting automation system. If result of Path Planning connect with automation system, Weak points is a complement to the existing Path Planning and we can obtain effective automation system. Consequently this paper suggest method of Autonomous Driving Path Planning for Concrete Pavement Cutting Operation And the Path Planning system application.

  • PDF

Productivity Analysis for Strutural Formwork Using 3D BIM (3D BIM을 활용한 골조 거푸집 공사의 생산성 분석에 관한 연구)

  • Choi, Chang-Hoon;Park, Young-Jin;Soh, Ji-Yoon;Kim, Sung-Yeon;Lee, Junbok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.292-300
    • /
    • 2014
  • The construction progress control is very important because there are many unexpected factors affecting time schedule delay and cost overruns. A complicated measure including item quantity and inherent time and costs is used to monitor the progress. Another element to be considered is a productivity, which is cost effectiveness because productivity is primarily measured by the costs. Productivity is stated as constant in-place value divided by inputs such as worker-hour. The main purpose of this paper is to analyze the productivity of structural formwork using a 3D BIM. In order to achieve the research objective, an integrated model of a BIM with a daily foreman's report is developed. The quantities being extracted from a 3D model and information are integrated with manpower utilized. The developed model is applied to a case project to measure and analyze the productivity in terms of individual building and work crew team. The results are discussed and further research topics will be addressed.

A Study on the Development of the BIM Process for Improvement of the BIM Application Ability of the Construction Industry (건설산업의 BIM 적용능력 제고를 위한 BIM 프로세스 개발에 관한 연구)

  • Kim, Ji-Won;Lee, Min-Cheol;Choi, Jeong-Min;Ock, Jong-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.738-743
    • /
    • 2008
  • Recently BIM is utilized to improve productivity for Life Cycle Cost of construction projects. Therefore, the establishment of BIM process by each construction project is a necessary element. However, cases and the pertinent researches that BIM process by each project is established are still not enough in Korea. The study proposed construction of BIM process through how to set up BIM application, how to organize a BIM team, how to set up a family and modeling method in the early stage. To achieve the purpose, the study examined application ability of BIM process by carrying out basic setting and modeling work through pilot study model, examination of the amount of materials and information interchange with IFC. The study attempted making a foundation of domestic BIM guideline construction through the above examination.

  • PDF

Decision of Optimal Platform Location Considering Work Efficiency -Optimization by Excavator Specification- (작업의 효율성을 고려한 최적 플랫폼 위치 선정 방안 -굴삭기 제원에 따른 최적화-)

  • Lee, Seung-Soo;Park, Jin-Woong;Seo, Jong-Won;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.790-793
    • /
    • 2008
  • Recently, Intelligent Excavating System(IES) for earthwork automation is on progress since the end of 2006 as a part of construction technology innovation projects in Ministry of Land, Transport and Maritime Affairs. Task Planning System(TPS), one of the detail core technologies of IES, is an optimal work planning system in conditions of effectiveness, safety and economic efficiency by analyzing the work environment data based on earthwork design and work environment recognition technology. For effective earthwork planning, the location of platform must be the most optimal spot for minimization of time, maximization of productivity and reduction of overlapped work spaces and unnecessariness. Besides, the decision of optimal platform location is to be based on the specifications and then is able to be converted with the local area calculation algorithm. This study explains the decision of optimal platform location on the basis of local area from the work space separate process and judges the effectiveness.