Journal of the Korean Institute of Landscape Architecture
/
v.36
no.2
/
pp.99-112
/
2008
The purpose of this study was to analyze on changes of ready constructed record(RCR) in landscape construction industry for 10 years from 1997 to 2006. For the study, according to the classification system of Korea construction industry, landscape construction industry were classified into landscape constructor as a general constructor, landscape planting constructor and landscape facilities constructor as special constructors. The results are as follows: 1. The RCR in landscape construction industry have increased for 10 years higher than other construction industry. Concretely the RCR ratio of landscape constructor has increased 0.9% in 1997 to 1.9% in 2006, the RCR ratio of landscape planting constructor 1.3% to 2.5%, and the RCR ratio of landscape facilities constructor 0.5% to 1.5%. Futhermore this increasing trend has been strengthened during the last a few years. 2. Differently from landscape constructor, the subcontract ratio of landscape planting constructor and landscape facilities constructor were higher, especially landscape facilities constructor was highest amount for 71.1% in the subcontract ratio. 3. The RCR of landscape construction industry in the metropolitan area including Seoul, Kyunggi, was higher than other region's, and the ratio of RCR of landscape constructor in this area was 53.5%, landscape planting constructor's 58.2%, and landscape facilities constructor 75.0%. 4. The yearly RCR per company and the RCR by project of landscape constructor and landscape planting constructor were stagnant. However, landscape facilities constructor's RCR showed an upward trend as years go by. This study was focused on the RCR of landscape construction industry, further study on the factors to affect the RCR of landscape construction industry and the RCR by project types is required in the near future.
Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.33-42
/
2010
Recently construction industry has faced new era as following the advances of IT technology. It becomes possible that information and knowledge among people are exchanged actively thanks to computer-based tools. In fact, the tools, PMIS(Project Management Information System) and KMS(Knowledge Management System) already have been introduced to constuction industry successfully. Lately IETM(Interactive Electronic Technical Manual) is tried to be one of these systems. This trying is being enlarged that the IETM's concept is changed to administrative and legal process provider throughout the lifespan of construction projects. However, it is hard to define construction IETM in mega-scale project like urban regeneration project because construction projects are complex and have diverse stakeholders. These properties may make the IETM ambiguous system. To do define IETM as a administrative and legal process provider, this research will conduct survey and interview, then analyze its own properties and find out design strategies. Based on the properties and strategies, suggesting IETM's system demands and architecture of urban regeneration processes.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.497-500
/
2008
Recently, the urban regeneration project has been performed actively at home and abroad. The stake-holders in urban regeneration project are various and complicated, and has large scale during a long life period. Also they show the characteristics of a mega-project and most mixed-use form. Therefore, the urban regeneration has a lot of potential risk factors from project beginning to completion. It means they need efficient and continuous risk management in terms of performance measurement. But the current domestic construction project does not reflect risk management in view of performance measurement. This study proposes the risk management methodology by mapping risk factors with major performance indexes of the urban regeneration project.
Forest projects often apply construction industry labor rates, without considering the demanding work conditions and labor intensity unique to forest operations, resulting in workplace issues. This study aims to analyze forest operations' characteristics and wage survey methods in other fields to establish a framework for surveying the wages of forest workers. The developed framework was tested through direct surveys conducted with all forest operation companies. Survey items included actual wages by occupation, identification and removal of outliers using quartile deviation, and occupation-based wage calculation. Results revealed that the appropriate wages for 2022 were as follows: KRW 163,376 for general workers, KRW 221,407 for special workers, KRW 250,045 for work leaders, and KRW 239,863 for wood cutters. These figures were 16.27% higher than those derived from the standard construction wage survey. The developed framework was validated by comparing the appropriate wages with both the standard construction wage survey and the forestry workers' wage. The results indicated that the wages calculated using the developed framework were 4.5% more similar to the forestry workers' wage compared with those from the standard construction wage survey. Consequently, the standard construction wage survey was deemed unsuitable for forest projects. To ensure efficient forest operations, it is imperative to conduct wage surveys using the developed framework over multiple years to accumulate sufficient data.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.445-448
/
2008
This study attempts to estimate approximate cost on construction of PSC BEAM Bridge using Case-Based Reasoning and suggests approximate estimation model at the planning and design stage. This paper suggests phased influence factors on construction cost and approximate estimation model for integrated project cost management.
Korean Journal of Construction Engineering and Management
/
v.17
no.6
/
pp.31-39
/
2016
This study aims to give suggestions based on survey to improve the quality of Global Construction Engineer Training Program in line with the government goals. The domestic construction industry in Korea has kept shrinking, whereas the global construction market is forecasted to keep expanding in the future. It has become an urgent task to be taken up for construction contractors and engineering firms so as to improve their capacity, in particular, in the fields of planning, management, finance as well as engineering. To deal with the lack of capacity of the domestic engineers and to help them emerge as global players in the competitive overseas construction market, the Ministry of Land, Infrastructure and Transport of the Korean government has designed a program called 'Global Construction Engineer Training Program.' The eligible target of the training program is mid-career professionals who are working for the construction contractors or engineering firms. To draw suggestions for this program, an importance-satisfaction analysis is conducted to evaluate the effectiveness of the training program implemented by the S University. The S University, along with C University, was selected as an implementation organization of the program in 2014 by the government. Through an email survey, the participating students in the program were asked questions on the importance and satisfaction against 17 indicators classified into 5 categories: instruction method, professional knowledge of instructors, contents of program, curriculum, and facility and environment. The survey results show that students are satisfied with the overall quality of the program, but it was also found that they want the program opens more coursework on practical application of knowledge, case studies, and global networking.
Korean Journal of Construction Engineering and Management
/
v.14
no.3
/
pp.176-186
/
2013
For urban renewal projects progressing in large scale, it carries a characteristic that frequently changes the environment, subject, law, plan and the like by a demand from various participants and internal/external factors. As such large-scale urban renewal projects have a lot of possibilities of change, it requires setting a plan to recognize the possible variable factors by each project operation stage and to manage it systematically by defining the variable factors on the basis of working process of the entire project. Therefore this research has produced a factor of main variable management based on working process for systematic variable management on the projects that inherent various possibilities of change as urban environment refurbishment projects. And it also suggests the status of main variable factors characterized by project operation stages quantitatively through reflecting external and internal features for variable factors produced from utilizing ANP methodology.
Korean Journal of Construction Engineering and Management
/
v.16
no.1
/
pp.119-128
/
2015
Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.53-57
/
2006
안전관리는 건설사업의 시공과정 중에 발생 가능한 유해, 위험으로부터 인명을 보호하는 것이며, 건설사업의 주제는 발주자로서 발주자 역할의 극대화는 효과적인 건설재해 방지의 관건이다. 건설프로젝트의 발주자, 설계자, 감리자, 시공자, 협력업자 등 다수 참여자의 장기간에 걸친 공동작업으로 이루어지는 건설공사의 특성을 고려할 때, 기존의 건설안전관리체제로는 건설공사에 수반되는 이와 다양한 유형의 사고를 방지하기 위한 근본적인 처방으로는 미흡하며, 건설산업의 총체적인 안전수준의 향상을 통한 시설품의 생애주기 전반에 걸쳐 안전성을 확보할 수 있는 근원적인 안전관리제도의 구축이 요구되고 있다. 실태조사 결과 공공발주자와 민간발주자의 안전의식 및 안전관리실태에는 격차가 크며, 대다수 발주자의 안전관리에 대한 책임의식이 미흡하며, 민간발주자의 경우가 훨씬 열악한 것으로 나타났다. 정부 감독기관의 발주자에 대한 안전책임 부여도 소극적이다. 발주자 안전관리가 미흡한 원인과 이의 촉진 방안에 대한 도출이 필요하다. 발주자에 대한 접근 방법의 홍보를 통한 책임의식의 고취, 발주자를 위한 안전관리매뉴얼 등 안전관리 도구의 제공, 법령을 동한 명확한 책임의 부여, 발주자가 책임을 이행할 수 있는 자질있는 안전전문가의 활용이 긴요한 것으로 사료된다.
Korean Journal of Construction Engineering and Management
/
v.10
no.4
/
pp.67-75
/
2009
The mixed-use development project like urban regeneration project has been enforced with long period and participation of various stakeholders. For this character, lots of risk could be occurred during the process of project and the project's success or failure depends on the risk management. So the process of identifying and responding to risks in urban regeneration projects should be followed systemically. The risk identification phase is the first step to identify risk factors and define risk's character. One of the risk identification methods, the checklist, is the most practical and well-known one. This study suggests the check list that devide risks classified by stakeholders through analizing tasks of stakeholders and drawing risks. This kind of checklist which handles risk factors classified by stakeholders is an easy tool to identify risks and expected to be effective to find risks for various stakeholders and themselves in the urban regeneration projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.