• Title/Summary/Keyword: 건설사업 특성

Search Result 605, Processing Time 0.028 seconds

A Study on Changes of Ready Constructed Record in Landscape Construction Industry (조경건설업의 기성실적 변동 특성)

  • Lee, Sang-Suk
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.2
    • /
    • pp.99-112
    • /
    • 2008
  • The purpose of this study was to analyze on changes of ready constructed record(RCR) in landscape construction industry for 10 years from 1997 to 2006. For the study, according to the classification system of Korea construction industry, landscape construction industry were classified into landscape constructor as a general constructor, landscape planting constructor and landscape facilities constructor as special constructors. The results are as follows: 1. The RCR in landscape construction industry have increased for 10 years higher than other construction industry. Concretely the RCR ratio of landscape constructor has increased 0.9% in 1997 to 1.9% in 2006, the RCR ratio of landscape planting constructor 1.3% to 2.5%, and the RCR ratio of landscape facilities constructor 0.5% to 1.5%. Futhermore this increasing trend has been strengthened during the last a few years. 2. Differently from landscape constructor, the subcontract ratio of landscape planting constructor and landscape facilities constructor were higher, especially landscape facilities constructor was highest amount for 71.1% in the subcontract ratio. 3. The RCR of landscape construction industry in the metropolitan area including Seoul, Kyunggi, was higher than other region's, and the ratio of RCR of landscape constructor in this area was 53.5%, landscape planting constructor's 58.2%, and landscape facilities constructor 75.0%. 4. The yearly RCR per company and the RCR by project of landscape constructor and landscape planting constructor were stagnant. However, landscape facilities constructor's RCR showed an upward trend as years go by. This study was focused on the RCR of landscape construction industry, further study on the factors to affect the RCR of landscape construction industry and the RCR by project types is required in the near future.

A Conceptual Model for an Administrative and Legal Process Provider of Urban Regeneration using Construction Interactive Electronic Technical Manual (전자매뉴얼을 활용한 도시재생사업의 법.행정절차 제공 시스템의 개념적 모형)

  • Park, Moon-Seo;Jeong, Jin-Wook;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.33-42
    • /
    • 2010
  • Recently construction industry has faced new era as following the advances of IT technology. It becomes possible that information and knowledge among people are exchanged actively thanks to computer-based tools. In fact, the tools, PMIS(Project Management Information System) and KMS(Knowledge Management System) already have been introduced to constuction industry successfully. Lately IETM(Interactive Electronic Technical Manual) is tried to be one of these systems. This trying is being enlarged that the IETM's concept is changed to administrative and legal process provider throughout the lifespan of construction projects. However, it is hard to define construction IETM in mega-scale project like urban regeneration project because construction projects are complex and have diverse stakeholders. These properties may make the IETM ambiguous system. To do define IETM as a administrative and legal process provider, this research will conduct survey and interview, then analyze its own properties and find out design strategies. Based on the properties and strategies, suggesting IETM's system demands and architecture of urban regeneration processes.

A Study on the Mapping of Risk Factor with Performance Index in Urban Regeneration Project (도시재생사업 성과지표와 위험요인 연계 방안 연구)

  • Yu, Young-Jeong;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.497-500
    • /
    • 2008
  • Recently, the urban regeneration project has been performed actively at home and abroad. The stake-holders in urban regeneration project are various and complicated, and has large scale during a long life period. Also they show the characteristics of a mega-project and most mixed-use form. Therefore, the urban regeneration has a lot of potential risk factors from project beginning to completion. It means they need efficient and continuous risk management in terms of performance measurement. But the current domestic construction project does not reflect risk management in view of performance measurement. This study proposes the risk management methodology by mapping risk factors with major performance indexes of the urban regeneration project.

  • PDF

Estimation of Appropriate Wage by Development of Wage Survey Framework for Forest Workers (산림사업 작업자 임금실태조사 프레임워크 개발을 통한 적정 노임단가 추정)

  • Hye-in Park;Cham Kim;Sung-Min Choi
    • Journal of Korean Society of Forest Science
    • /
    • v.112 no.2
    • /
    • pp.217-229
    • /
    • 2023
  • Forest projects often apply construction industry labor rates, without considering the demanding work conditions and labor intensity unique to forest operations, resulting in workplace issues. This study aims to analyze forest operations' characteristics and wage survey methods in other fields to establish a framework for surveying the wages of forest workers. The developed framework was tested through direct surveys conducted with all forest operation companies. Survey items included actual wages by occupation, identification and removal of outliers using quartile deviation, and occupation-based wage calculation. Results revealed that the appropriate wages for 2022 were as follows: KRW 163,376 for general workers, KRW 221,407 for special workers, KRW 250,045 for work leaders, and KRW 239,863 for wood cutters. These figures were 16.27% higher than those derived from the standard construction wage survey. The developed framework was validated by comparing the appropriate wages with both the standard construction wage survey and the forestry workers' wage. The results indicated that the wages calculated using the developed framework were 4.5% more similar to the forestry workers' wage compared with those from the standard construction wage survey. Consequently, the standard construction wage survey was deemed unsuitable for forest projects. To ensure efficient forest operations, it is imperative to conduct wage surveys using the developed framework over multiple years to accumulate sufficient data.

Approximate Estimating Model Using the Case Based Reasoning - PSC BEAM Bridge - (사례기반추론을 이용한 개략공사비 산정모델 개발 - PSC BEAM교를 중심으로 -)

  • Kang, Chan-Sung;Lee, Geon-Hee;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.445-448
    • /
    • 2008
  • This study attempts to estimate approximate cost on construction of PSC BEAM Bridge using Case-Based Reasoning and suggests approximate estimation model at the planning and design stage. This paper suggests phased influence factors on construction cost and approximate estimation model for integrated project cost management.

  • PDF

Improvement of Global Construction Engineer Training Program : An Importance-Satisfaction Analysis (글로벌 건설 엔지니어링 고급인력 양성사업의 교육프로그램 개선방안)

  • Park, Hyeon;Park, In-Seok;Cha, Yongwoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.31-39
    • /
    • 2016
  • This study aims to give suggestions based on survey to improve the quality of Global Construction Engineer Training Program in line with the government goals. The domestic construction industry in Korea has kept shrinking, whereas the global construction market is forecasted to keep expanding in the future. It has become an urgent task to be taken up for construction contractors and engineering firms so as to improve their capacity, in particular, in the fields of planning, management, finance as well as engineering. To deal with the lack of capacity of the domestic engineers and to help them emerge as global players in the competitive overseas construction market, the Ministry of Land, Infrastructure and Transport of the Korean government has designed a program called 'Global Construction Engineer Training Program.' The eligible target of the training program is mid-career professionals who are working for the construction contractors or engineering firms. To draw suggestions for this program, an importance-satisfaction analysis is conducted to evaluate the effectiveness of the training program implemented by the S University. The S University, along with C University, was selected as an implementation organization of the program in 2014 by the government. Through an email survey, the participating students in the program were asked questions on the importance and satisfaction against 17 indicators classified into 5 categories: instruction method, professional knowledge of instructors, contents of program, curriculum, and facility and environment. The survey results show that students are satisfied with the overall quality of the program, but it was also found that they want the program opens more coursework on practical application of knowledge, case studies, and global networking.

Deduction of Change Management Factors and Weight Estimation based on ANP in Urban Renewal Project (ANP 기반 도시환경정비사업의 변화관리 요인 도출 및 중요도 산정)

  • Shin, Seung-Yoon;Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.176-186
    • /
    • 2013
  • For urban renewal projects progressing in large scale, it carries a characteristic that frequently changes the environment, subject, law, plan and the like by a demand from various participants and internal/external factors. As such large-scale urban renewal projects have a lot of possibilities of change, it requires setting a plan to recognize the possible variable factors by each project operation stage and to manage it systematically by defining the variable factors on the basis of working process of the entire project. Therefore this research has produced a factor of main variable management based on working process for systematic variable management on the projects that inherent various possibilities of change as urban environment refurbishment projects. And it also suggests the status of main variable factors characterized by project operation stages quantitatively through reflecting external and internal features for variable factors produced from utilizing ANP methodology.

A study on the method for the Integrated Cost Estimate based on Project(ICEP) of program management with typical model (기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.119-128
    • /
    • 2015
  • Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.

Survey of Client/Owner Construction Safety Management (발주자 안전관리 실태조사 연구)

  • Moon, Jang-Ok;Ahn, Hong-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.53-57
    • /
    • 2006
  • 안전관리는 건설사업의 시공과정 중에 발생 가능한 유해, 위험으로부터 인명을 보호하는 것이며, 건설사업의 주제는 발주자로서 발주자 역할의 극대화는 효과적인 건설재해 방지의 관건이다. 건설프로젝트의 발주자, 설계자, 감리자, 시공자, 협력업자 등 다수 참여자의 장기간에 걸친 공동작업으로 이루어지는 건설공사의 특성을 고려할 때, 기존의 건설안전관리체제로는 건설공사에 수반되는 이와 다양한 유형의 사고를 방지하기 위한 근본적인 처방으로는 미흡하며, 건설산업의 총체적인 안전수준의 향상을 통한 시설품의 생애주기 전반에 걸쳐 안전성을 확보할 수 있는 근원적인 안전관리제도의 구축이 요구되고 있다. 실태조사 결과 공공발주자와 민간발주자의 안전의식 및 안전관리실태에는 격차가 크며, 대다수 발주자의 안전관리에 대한 책임의식이 미흡하며, 민간발주자의 경우가 훨씬 열악한 것으로 나타났다. 정부 감독기관의 발주자에 대한 안전책임 부여도 소극적이다. 발주자 안전관리가 미흡한 원인과 이의 촉진 방안에 대한 도출이 필요하다. 발주자에 대한 접근 방법의 홍보를 통한 책임의식의 고취, 발주자를 위한 안전관리매뉴얼 등 안전관리 도구의 제공, 법령을 동한 명확한 책임의 부여, 발주자가 책임을 이행할 수 있는 자질있는 안전전문가의 활용이 긴요한 것으로 사료된다.

  • PDF

A Development of Risk Identification Checklist for Stakeholders in the Construction Phase of the Urban Regeneration-Projects (도시재생사업 건설단계의 참여주체별 위험인지 체크리스트 개발)

  • Park, Kyu-Young;Young, Moon-Serk;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.67-75
    • /
    • 2009
  • The mixed-use development project like urban regeneration project has been enforced with long period and participation of various stakeholders. For this character, lots of risk could be occurred during the process of project and the project's success or failure depends on the risk management. So the process of identifying and responding to risks in urban regeneration projects should be followed systemically. The risk identification phase is the first step to identify risk factors and define risk's character. One of the risk identification methods, the checklist, is the most practical and well-known one. This study suggests the check list that devide risks classified by stakeholders through analizing tasks of stakeholders and drawing risks. This kind of checklist which handles risk factors classified by stakeholders is an easy tool to identify risks and expected to be effective to find risks for various stakeholders and themselves in the urban regeneration projects.