• Title/Summary/Keyword: 건설사업 계획단계

Search Result 207, Processing Time 0.03 seconds

An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project (초고층 개발사업 추진을 위한 단계별 리스크 요인의 특성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.103-115
    • /
    • 2016
  • The 106 buildings of 200 meters' height or greater were completed around the world in 2015 (CTBUH, The Council on Tall Buildings and Urban Habitat). They beat every previous year on record, including the previous record high of 99 completions in 2014. This brings the total number of 200-meter-plus buildings in the world to 1,040, exceeding 1,000 for the first time in history and marking a 392% increase from the year 2000, when only 265 existed. South Korea recorded three completions during 2015 - improving slightly over 2014, in which it had one. This study focused on the fact that high-rise building development project risks have not reduced in Korea in spite of numerous studies and measures. And it attempted to examine whether existing studies and measures have been presented on the basis of the accurate analysis of existing studies and measures and classify and analyze the characteristics of each phase' s risk factors in the hope that its results would be one reference point as to the measure to prevent high-rise building development project risks in the future. A high-rise building development project is the high risk project as compared with the low-rise project. Because a high-rise development project takes long and is very sensitive to the changing environment. Therefore, in order to succeed the project it becomes necessary to effectively manage the risk involved in the process of the high-rise building development project. The result of this study can be used as the guideline to make the risk management system for the high-rise development project.

Interview - Standardization of Design Drawings·Modular Building⋯ "The era of BIM? Already has come." (인터뷰 - 설계도면 표준화·모듈러 건축⋯ "BIM의 시대? 이미 왔다")

  • Lee, Yu-Ri
    • Korean Architects
    • /
    • s.615
    • /
    • pp.28-31
    • /
    • 2020
  • 도입까지 시간이 걸릴 것이라고 예측됐던 건설정보모델링(BIM : Building Information Modeling, 이하 BIM)이 어느새 성큼 다양한 분야에 진입했다. 영국, 싱가포르, 미국 등 해외에서는 이미 공공사업 시 BIM을 적극적으로 활용하고 있다. 우리나라 또한 2018년 국토교통부에서 '스마트 건설기술 로드맵'을 마련한 후 공공사업에 BIM을 단계적으로 도입해왔다. 대부분의 발주기관들은 오는 2025년까지 공공사업에 BIM을 전면 도입한다는 계획이다. 성균관대학교 공과대학 건설환경공학부 및 미래도시융합공학과 교수이자 국제건설자동화학회의 종신 상임이사인 권순욱 교수는 '스마트 건설 관리' 연구자이자 국내외에서 활동 중인 CM, BIM의 권위자다. 관련 분야의 책 8권과 100편 이상의 논문을 집필하고 30여 개의 특허·소프트웨어 등록을 보유하고 있다. 텍사스 오스틴 대학교 토목공학 박사 출신으로, 삼성물산, 한국건설기술연구원 등 일반 기업과 국가기관에서 실무와 이론을 두루 경험하며 경력을 쌓았다. 건설연구개발사업, 첨단 융복합 건설기술 등 다수의 국가 건설 R&D에 참여해 초고층 자재, 안전 모니터링, BIM 프로세스 표준개발 등의 시스템을 개발하기도 했다. 해외 연구자들과의 교류에도 적극적이다. 세계 석학들과 '노령 공학' 관련 영문교과서를 공동 집필(스마트주택 챕터 담당)했고, 2016년과 2019년엔 국제건설자동화학회와 국제프로젝트관리학회의 연사 자격으로 강단에 섰다. "영국, 싱가포르 등에선 공공사업을 100% BIM으로 발주하기 시작했습니다. 우리나라 정부도 비슷한 길을 가고 있습니다. 일정 규모의 발주 물량이 안정적으로 나오는 공공기관에서 그렇게 한다는 것은 국가가 전체 패러다임을 바꾸겠다는 의지 아닐까요?" 6월 10일 그의 연구실에서 권순욱 교수를 만나 BIM의 현황과 전망에 대해 들어봤다.

  • PDF

Critical Success Factors for the Definition Phase of a Construction Program - Focused on the Yongsan Park Development Program - (대형 국책사업의 프로그램 정의단계 핵심성공요인 도출 - 용산공원 조성사업을 중심으로 -)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Hyun, Chang-Taek;Lee, SangHoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.54-63
    • /
    • 2022
  • In order to derive the success factors of a Mega-scale national project, this study conducted a questionnaire survey on experts participating in the Yongsan National Park development program to obtain critical success factors in the program definition phase. AHP analysis was performed for each category through a survey of experts participating in the definition phase of the Yongsan park development program to derive relative importance. The categories were classified into program strategy, process, and people, and the importance between categories was people, strategy, and process in that order. In addition, as for the 27 critical success factors in the program definition phase, the program manager's competency and leadership, environmental and cultural property survey planning, program management plan preparation, operation and maintenance philosophy, and integrated program office showed high priorities. Therefore, in promoting the Yongsan Park development program, we propose a strategy for selecting and focusing on the critical success factors with high priorities in the program definition phase proposed in this study.

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

대만의 원자력산업 근황

  • 한국원자력산업회의
    • Nuclear industry
    • /
    • v.8 no.1 s.59
    • /
    • pp.14-20
    • /
    • 1988
  • 1978년 12월부터 1985년 5월까지 6년반동안 대만전력공사는 3개소의 원자력발전소(로형별로는 BWP 4기, PWR 2기)를 운전개시했으며, 1986년에 이 발전소들은 대만 전체 전력량의 $43\%$ 이상을 공급하였다. 그동안 대만전력공사는 종업원에 대한 훈련과 발전소의 성능 및 운영면의 개선을 위해 주력해왔으며, 1983년부터 대만정부는 원자력프로그램의 2단계사업 착수승인을 보유해왔다. 이 2단계사업에는 6기의 1,000MWe원자력발전소의 신규건설이 포함되어 있으며, 이 중 4기는 2000년 이전에 운전개시하도록 계획되어 있어 원자력발전은 대만정부의 탈유정책의 근간를 이루고 있다.

  • PDF

회원사소식 - 코텍엔지니어링(주), 제2 롯데월드 지열냉난방시스템 공사 수주

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.242
    • /
    • pp.14-15
    • /
    • 2010
  • 우리나라는 건물 냉난방에 연간 250조원에 이르는 에너지를 수입하고 있다. 비용도 엄청나지만 에너지 자원의 확보도 갈수록 어려워지고 있다. 미국과 유럽에서는 2030년까지의 지열 보급계획을 수립, 국가별로 건물 냉난방에너지의 20~60%까지를 지열로 대체한다는 계획을 추진하고 있다. 우리나라도 에너지절약 의무화제도, 그린홈 100만호제도, 시설원예사업 등 다양한 정부정책을 추진하고 있다. 그러나 민간부문의 참여가 없으면 에너지절감 효과는 극히 제한적일 수 밖에 없다. 제2 롯데월드에서 지열시스템 도입한 것은 우리나라 지열시장의 수준을 한 단계 레벨업 시킬 것으로 예상된다. 본지는 코텍엔지니어링(주)가 수주한 제2 롯데월드 지열냉난방시스템 공사에 대해 알아보고, 앞으로 시공과정을 자세히 보도할 예정이다.

  • PDF

현장탐방 - (주)성보엔지니어링 경상북도 본청 및 의회청사 기계설비공사

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.289
    • /
    • pp.64-71
    • /
    • 2014
  • 경상북도는 경상도 개도 700주년인 2014년 완공을 목표로 새로운 도청 청사를 경북 안동시 풍천면과 예천군 호명면 일원에 건설 중에 있다. 경북도청 이전사업은 지난 1981년 대구시가 직할시로 승격 분리되면서 경북도민의 자긍심을 세우기 위해 신비의 가야문화, 천년의 신라문화, 지조의 유교문화가 융합된 민족문화의 본산지이자 한국의 정신 및 문화수도를 계승하는 한편 새로운 천년을 준비하기 위한 사업으로 추진되었다. 이에 따라 경상북도는 지난 2008년 안동시 풍천면과 예천군 호명면 일원을 도청 이전 예정지로 정하고 기본계획 수립 및 설계 시공을 일괄발주(턴키)하여 2011년 2월 (주)대우건설 컨소시엄[대우건설 지분 50%, 풍림산업, 세원건설(구미), 우석종합건설(경주), 동일건설(문경), 주일건설(경산), (주)진영종합건설(포항) 등 6개 업체의 50% 참여지분]을 실시설계 적격자로 선정, 2011년 10월 첫 삽을 떴다. 경상북도는 오는 2027년까지 경북도청 행정타운을 중심으로 3단계에 걸쳐 주거, 산업, 교육, 레저 및 문화단지 등 10만명의 인구가 거주할 신도시를 건립할 계획이다. 또한 이 지역은 지리적으로 세계문화유산이자 한국 정신문화의 수도인 안동 하회마을과 가깝고 한국적 우아함을 느낄 수 있는 지역이자 중앙고속도로, 고속국도 및 철도 등이 관통하고 있어 도내 주변도시와의 연계성이 높아서 경북지역의 신성장 거점도시로 성장할 전망이다.

  • PDF

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

A Study of on the Case Study of LCC Analysis for the Education and Research Building of S University (S대학교 교육연구동 LCC분석 사례 연구)

  • Seo Min-Gu;Ha Han-Ki;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.329-332
    • /
    • 2003
  • The Ministry of Construction and Transportation has estimated the reconsideration of economy in construction and the dullness of LCC forcast method which supports decision-marking in safety and maintenance of buildings. So, they have introduced LCC analysis method in steps of a feasibility study and design. Because of the introduction of LCC analysis process and method, it would be possible to make a logical decision from management maintenance, estimation, user point of view. In this study, it would bepossible to show a plan and alternative of design factors and structure in one building by using LCC analysis method and to compare and analyze the reduction of life circle cost bi the elapsed time.

  • PDF