Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

A Study on the Environmental Friendly Noise and Vibration Management Method for the Construction Project (건설사업의 소음 $\cdot$ 진동 관리방안에 관한 연구)

  • Ko Kwang-il;Kim In-ho;Seo Sang-wook;Lee Chan-sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.110-117
    • /
    • 2004
  • The environmental-related disputes and claims are steeply increasing recently. Among them the number of disputes and claims on noise and vibration incurred in the process of construction is more than $85\%$. Since those disputes and claims cause cost overrun and or penalty and bad impression for the construction company, it is necessary to develop a systematic management method for solving them. This study presents a environmental management structure based on the examining many kinds of environmental-related laws including 'The Act on Regulation of Noise and Vibration' furthermore, through analysing various dispute and claim cases, and surveying literatures we suggest environmental study noise and vibration management method using for the preconstruction phase, the construction phase and the post construction phase, respectively.

An Analysis of Capability of CM at Risk in Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 역량분석)

  • Yoo, Seung-Kyu;Choi, Seok-In;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.85-94
    • /
    • 2009
  • For the purpose of analysing the capability (knowledge, experience, and ability) of CM at Risk in the major construction company in korea, this study performed questionnaire survey with experts in the companies. Based on the analysis of the survey, the study was found as follows. 1) It is needed to increase the capability of preconstruction services, such as project management plan/manual, contract documents, value engineering, alternative analysis, time management, and claim. 2) Despite of gap of the capability between the present and the future CM services, the study concluded that the capability is sufficient to perform CM at Risk project in the major construction company.

Relationships between Construction Client's Leadership and Best Practice for Project Success Empirical Finding from Best Practice Cases (건설사업 성공을 위한 발주자 리더십과 베스트 프랙티스 관계 연구)

  • Oh Young-Sup;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.216-219
    • /
    • 2004
  • Construction clients are the key player in that they initiate construction projects and are in a position to influence the efficiency and productivity of the projects. Construction projects by nature require team-working so clients's leadership is the crux of project success. The objective of this paper is to suggest characteristics of construction clients' leadership in terms of best practice based on the analysis of project success cases. Four key elements of construction clients' leadership are identified and best practice from the case studies were related to the elements.

  • PDF

인천국제공항철도 건설사업관리 수행체계

  • Yoon Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.13-18
    • /
    • 2003
  • 국내 건설프로젝트의 대부분은 설계, 시공, 운영이 별도의 체계로 운영이 되이온 경향이 많은 바, 이를 개선하기 위해선, 기획단계에서 운영단계에 이르는 건설생애주기 단계별로 수행업무절차를 체계적으로 정립하여야 한다. 본 고에서는 이를 위하여 인천국제공항철도사업을 모델로 바람직한 대형공사에서의 사업관리 수행체계에 대하여 알아보았다.

  • PDF

대한설비건설협회 2009회계년도 사업계획

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.224
    • /
    • pp.38-44
    • /
    • 2009
  • 대한설비건설협회(회장 강석대)는 지난 2월 20일 설비건설회관 대회의실에서 제40회 총회(정기)를 개회하고 2009회계년도 사업계획을 수립했다. 2009회계년도 사업계획은 기계설비시공 관리기준법 제정에 대한 결집된 노력을 비롯하여 직할시 공제 CM에 의한 다중시공계약방식 등 분리발주 확대에 역점을 두고 있다.

  • PDF

친환경 건설의 프런티어, 성원건설 건강한 생활이 시작되는 곳, 상떼빌

  • Kim, So-Jin
    • 주택과사람들
    • /
    • s.196
    • /
    • pp.52-53
    • /
    • 2006
  • '건강'을 우선시하는 주택 건설업체,성원건설. 9월에는 용인 기흥읍 공세동에 400여 세대를 분양 하고 두바이와 카자흐스탄 알제리에도 주상복합 아파트 건립 사업을 준비하고 있다. 국내외에서 알토란 같은 사업을 추진하고 있는 성원건설의 브랜드 가치와 국내외 주요 분양 프로젝트, 사업 방향 등에 대해 알아보자.

  • PDF

종합 건설회사로 발돋움한 포스코건설

  • 김소진
    • 주택과사람들
    • /
    • s.221
    • /
    • pp.70-73
    • /
    • 2008
  • 도시개발.경전철.신재생에너지.SOC사업 등에 참여하면서 종합 건설회사로 우뚝 서 있는 포스코건설. 최근에는 서울 동작구 상도동의 the#이 '제12회 매경 살기좋은 아파트' 우수상을 수상하는 등 주택사업 분야에서도 저력을 나타내고 있다. 아.태 지역 최고의 해외 신용등급을 보유한 포스코건설의 주요 사업 프로젝트와 장기 비전을 살펴보았다.

  • PDF

인물포커스 - 제2영동고속도로(주) 강희용 사장

  • 사)한국건설안전기술협회
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.46
    • /
    • pp.8-15
    • /
    • 2008
  • 지난 2003년부터 제안, 추진된 제2영동고속도로 건설사업은 그간 시행여부를 두고 우여곡절을 겪었던 사업으로 알려져 있다. 평창 동계올림픽 유치활동이 실패하면서 한때, SOC 투자 타당성 재검토설이 나오는 등 쉽지 않은 사업을 총괄 지휘하고 있는 제2영동고속도로(주) 강희용 사장으로부터 공사현호아 및 비젼 등 모든 것에 대해서 알아보았다.

  • PDF

제주민군복합형 관광미항 건설사업 현황

  • Yun, Seok-Han
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2013.06a
    • /
    • pp.483-483
    • /
    • 2013
  • 제주민군복합형 관광미항은 2006부터 2015년까지 총 9,805억원을 투자하여 제주 강정해안에 해군기동전단 함정과 대형 크루즈선을 동시에 수용할 수 있도록 건설중이다. 이번 발표에서는 제주민군복합형 관광미항 건설사업과 관련한 현황에 대해서 살펴도록 하겠다.

  • PDF