• Title/Summary/Keyword: 건설사업

Search Result 3,407, Processing Time 0.141 seconds

A Study on the Strategies for Incheon International Airport to be a Successful Hub Airport in Northeast Asia (인천국제공항의 동북아 허브화 성공을 위한 전략 -한·일 항공시장 분석을 중심으로-)

  • Yoo, Kwang Eui
    • Journal of Advanced Navigation Technology
    • /
    • v.1 no.1
    • /
    • pp.81-94
    • /
    • 1997
  • The construction of Incheon International Airport(IIA) was planned in order to meet the national air transport demand which has been rapidly increased, and to be a major hub airport in Northeast Asia. However, it is inevitable to compete with Japanese airports because Japanese government also planned to expand greatly the airport capacity in Tokyo area and Kansai Airport in Osaka area. Since a hub airport should have convenient connecting flights to spoke cities, it is required for IIA to have plenty of short-haul flights to the cities around Seoul, for example, to the cities in East China, Japan and other East Asian countries. IIA authority and Korean national air carriers should coordinate to develop air transport demand for short-haul international route and establish efficient hub-spoke flight schedules. This would be a essential precondition to function as a hinterland hub in Northeast Asia. Reflecting the geographical position, the function as a hourglass hub could be possible, if IIA is utilised by major airlines as a bridge to connect passengers between cities in Southeast Asia and 'cities in North America. To be a successful hourglass hub, the Korean national carriers must try to engage in the joint operations or the alliances with the major airlines of Southeastern countries or North American countries. All of these could be accomplished through the cooperation among government, airport and national air carriers.

  • PDF

Tritium Fuel Cycle of the International Thermonuclear Experimental Reactor (국제핵융합실험로 삼중수소 연료주기)

  • Song, Kyu-Min;Sohn, Soon Hwan;Chung, Hongsuk;Yun, Sei-Hun;Jung, Ki Jung
    • Korean Chemical Engineering Research
    • /
    • v.50 no.4
    • /
    • pp.595-603
    • /
    • 2012
  • International Thermonuclear Experimental Reactor (ITER) will be constructed in 2019 according to the JIA (Joint Implementation Agreement) of 7 countries. The ITER fusion fuel cycle consists of fusion vacuum vessel, tritium plant and fuelling system. The tritium plant provides the functions of storage, delivery, separation, removal and recovery of the deuterium and tritium used as fusion fuels for the ITER. The tritium plant systems supply deuterium and tritium from external sources and treat all tritiated fluids from ITER operation through Storage and Delivery System (SDS), Tokamak Exhaust Processing (TEP), Isotope Separation System (ISS), Water Detritiation System & Atmosphere Detritiation System (WDS & ADS) and Analysis System (ANS). In this paper, the functions and design requirements of the major systems in the tritium plant and the status of R&D are described. Korean party is developing the SDS for ITER tritium plant and partially attaining the WDS technology through the construction and operation experience of the Wolsong Tritium Removal Facility (WTRF). Now it is expected that researchers in other fields such as chemical engineering take part in the development of upcoming technologies for ISS and TEP.

Case Study of Remidation and Investigation of Closed Unsanitary Landfill for Prevention of Leachate (비위생매립지 정밀조사 및 침출수 방지를 위한 정비방안 연구)

  • Kim, Sangkeun;Lee, Yongsoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.1
    • /
    • pp.5-13
    • /
    • 2012
  • For the last decade the amount of waste has rapidly been increased in South Korea and many waste landfills have been built according to government guidelines specifying required systems such as landfill liner, leachate collecting facilities, final cover system, etc. This effort has led the recently constructed landfills to be under well managed sanitary condition. In a meanwhile closed waste-landfill sites in the past before the adoption of the government guidelines exits under unsanitary condition. In these cases untreated leachate flew out to the surroundings due to the absence of liner and leachate collecting facilities and caused groundwater and soils to be contaminated. Waste generated odor and gas also brought civil complaints. Because environmental influences bring serious problems nearby sites, it is required to have unsanitary waste-landfills to be appropriately treated and managed. A study to evaluate environmental influence and contamination level of surroundings nearby and on the unsanitary landfills is necessary before the establishment of "Management guide of closed landfill site." This paper presents an environmental evaluation for the closed site, Doil-dong landfill, according to "Closed landfill management regulation" by Ministry of Environment. "D" landfill, located in Pyeongtaek city, has possobility to contaminate surrounding surfacewater and groundwater by leakage of leachate. The in-situ stabilization carried out to build the DMW(deep soil mixing cutoff wall) wall and drainage systems.

Development of Rule-Set Definition for Architectural Design Code Checking based on BIM - for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information - (BIM 기반의 건축법규검토를 위한 룰셋 정의서 개발 - 장애인,노인,임산부 등의 편의증진 보장에 관한 법률 대상으로 -)

  • Kim, Yuri;Lee, Sang-Hya;Park, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.143-152
    • /
    • 2012
  • As the Public Procurement Service announced the compulsory of BIM adaption in every public construction from 2016, the importance of BIM is increasing. Besides, automatic code checking takes significance in terms of the quality control for BIM based design. In this study, rule-sets were defined for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information. Three analytic steps were suggested to shortlist the objective clauses from the entire code; the frequency analysis using project reviews for architectural code compliance, the clause analysis on quantifiability, and the analysis for model checking possibilities. The shortlisted clauses were transformed into the machine readable rule-set definition. A case study was conducted to verify the adaptiveness and consistency of rule-set definitions. In future study, it is required the methodologies of selecting objective clauses to be specified and its indicators to be quantified. Also case studies should be performed to determine the pre-conditions in modeling and to check interoperability issues and other possible errors in models.

A feasibility modeling of potential dam site for hydroelectricity based on ASTGTM DEM data (ASTGTM 전지구 DEM 기반의 수력발전댐 적지분석 사전모델링)

  • Jang, Wonjin;Lee, Yonggwan;Kim, Seongjoon
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.7
    • /
    • pp.545-555
    • /
    • 2020
  • A feasibility modeling for potential hydroelectric dam site selection was suggested using 1 sec ASTGTM (ASTER Global Digital Elevation Model) and Terra/Aqua MODIS (Moderate Resolution Imaging Spectroradiometer) derived land use (MCD12Q1) data. The modeling includes DEM pre-processing of peak, sink, and flat, river network generation, watershed delineation and segmentation, terrain analysis of stream cross section and reservoir storage, and estimation of submerged area for compensation. The modeling algorithms were developed using Python and as an open source GIS. When a user-defined stream point is selected, the model evaluates potential hydroelectric head, reservoir surface area and storage capacity curve, watershed time of concentration from DEM, and compensation area from land use data. The model was tested for 4 locations of already constructed Buhang, BohyunMountain, Sungdeok, and Yeongju dams. The modeling results obtained maximum possible heads of 37.0, 67.0, 73.0, 42.0 m, surface areas of 1.81, 2.4, 2.8, 8.8 ㎢, storages of 35.9, 68.0, 91.3, 168.3×106 ㎥ respectively. BohyunMountain and Sungdeok show validity but in case of Buhang and Yeongju dams have maximum head errors. These errors came from the stream generation error due to ASTGTM. So, wrong dam watershed boundary limit the head. This study showed a possibility to estimate potential hydroelectric dam sites before field investigation especially for overseas project.

Evaluation of the environmental and ecological value indicators for railway development area selection (철도개발지 선정을 위한 환경·생태적 가치 지표 평가)

  • Kim, Min-kyeong;Kim, Dong Yeob
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.2
    • /
    • pp.105-113
    • /
    • 2017
  • Recently mountain tourism has been promoted and introduction of railroads with utilizing mountain resources is being planned. With the government policies to increase the share of eco-friendly transportation on railroad, national double-tracking of single rail and improvement projects are on going. However, the eco-friendly railroad policy suggests the environmental impact assessment items only on air quality, water quality, geographical/geological features, fauna/flora, natural/environmental resources, noise/ vibration, and recreation/landscape. And for fauna/flora and natural/environmental resources, confirming the presence of environmental protection zone is enough to satisfy legal requirement. This study suggested to evaluate environmental/ecological values with quantitative data. Evaluation indices and evaluation items have been selected to provide the data. Each of the subject map and railroad network was overlapped. The study selected naturalness and diversity as major indicators and calculated weight values of the items under the indicators, which are to be usd for the selection of the sites for railway development. This assessment method could be applied to the environmentally friendly construction of railroads in the future.

Economic Assessment for Flood Control Infrastructure under Climate Change : A Case Study of Imjin River Basin (기후변화를 고려한 홍수방재시설물의 경제성분석 : 임진강 유역사례)

  • Kim, Kyeongseok;Oh, Seungik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.81-90
    • /
    • 2017
  • In Imjin River basin, three floods occurred between 1996 and 1999, causing many casualties and economic losses of 900 billion won. In Korea, flood damage is expected to increase in the future due to climate change. This study used the climate scenarios to estimate future flood damage costs and suggested a real options-based economic assessment method. Using proposed method, the flood control infrastructures in Imjin River basin were selected as a case study site to analyze the economic feasibility of the investment. Using RCP (Representative Concentration Pathway) climate scenarios, the future flood damage costs were estimated through simulated rainfall data. This study analyzed the flood reduction benefits through investment in the flood control infrastructures. The volatility of flood damage reduction benefits were estimated assuming that the RCP8.5 and RCP4.5 climate scenarios would be realized in the future. In 2071, the project option value would be determined by applying an extension option to invest in an upgrading that would allow the project to adapt to the flood of the 200-year return period. The results of the option values show that the two investment scenarios are economically feasible and the project under RCP8.5 climate scenario has more flood damage reduction benefits than RCP4.5. This study will help government decision makers to consider the uncertainty of climate change in the economic assessment of flood control infrastructures using real options analysis. We also proposed a method to quantify climate risk factors into economic values by using rainfall data provided by climate scenarios.

Enhanced Method for Environmental Benefit via Application of Low Impact Development (LID) Technique in Tram Design (트램 설계시 LID 기법 적용을 통한 환경편익 증대 방안)

  • Gu, Su-Hwan;Lee, Yunhee;Oa, Seong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.6
    • /
    • pp.826-832
    • /
    • 2016
  • Reduced greenhouse gas effect induced by LID (Low Impact Development) technique application in tramway construction was quantified to increase environmental benefit as part of an overall economic assessment. In addition, by application of penetration type permeable blocks, the effect of the urban water cycle was examined as a special assessment item in the policy analysis. The carbon emission ratios of the permeable turf block, according to the turf coverage rate (100%, 50% granite, and 50% HDPE), against the concrete track construction were -184.7%, -127.3%, and -116.3%, respectively. The carbon emission ratios of permeable blocks with granite and HDPE were 30.1% and 52.5%. In the case of the penetration type permeable block, it was possible to store rainfall in the block until 90mm/hr of rainfall intensity (94.3% of water reserve rate); therefore, this method was effective as part of the urban water cycle system. As a result, an increased environmental benefit from LID technique application is expected in tramway construction; this needs to be considered as a policy factor in AHP analysis.

Analysis of Structural Work Scheduling of Green Frame - Focusing on Apartment buildings - (Green Frame의 골조공사 공기 분석 연구 - 공동주택을 중심으로 -)

  • Lee, Sung-Ho;Kim, Shin-Eun;Kim, Gwang-Hee;Joo, Jin-Kyu;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.301-309
    • /
    • 2011
  • Apartment housings that adopt a bearing wall structure design, which account for a majority of the housing units available in Korea, are not free from structural constraints that limit the extension of their service life. The resulting need for reconstruction from the ground up requires a massive consumption of resources and energy, and triggers environmental pollution resulting from construction wastes. As a solution to such issues, the government enforces incentive schemes to promote a remodeling-friendly rahmen structure design. Green Frame, which is a novel concept of composite precast concrete structure to support rahmen structure apartment housing buildings, can address the constraints of bearing wall structure and conventional rahmen structure designs that limit the potential for remodeling projects, while reducing the term of construction. Therefore, this study aims to analyze the characteristics of Green Frame and its absolute term of construction, and compare the terms of frame work construction in apartment housing projects adopting different structural design approaches to illuminate their differences. In the end, Green Frame is found to be capable of reducing the term of construction in apartment housing projects. As the term of construction is a very critical element of a construction project, Green Frame will ultimately prove to be one of the key enablers to ensure the success of apartment housing construction projects.

Identifying Factors Affecting Labor Productivity for Residential Fire Protection System Installation (공동주택 소방설비공사의 노무생산성 영향요인 분석)

  • Oh, Jae-Hoon;Kim, Dae Young;Kim, Jae Sik;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.377-384
    • /
    • 2017
  • It is generally acknowledged that subcontractors mostly allocate their resources to project relying on their previous experiences, instead of data-based judgement. Installing residential fire protection systems, typically performed by subcontractors, is labor-intensive job and its schedule is frequently changed as the contractor master schedule is often revised. Nevertheless, it is still important for subcontractors to make much effort to improve labor productivity through a thorough planning for scheduling and resource allocation. The purpose of this study is to identify significant factors that affect labor productivity for residential fire protection system installation. For this purpose, 50 potential factors that may affect productivity were identified based on literature reviews and expert interviews. These factors were further explored using correlation analysis and ANOVA test. The results showed that the labor productivity is significant impacted by various project characteristics.