• Title/Summary/Keyword: 건설리스크

Search Result 339, Processing Time 0.026 seconds

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

법령과고시(1) - 하도급 거래 공정화에 관한 법률 일부 개정

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.287
    • /
    • pp.65-67
    • /
    • 2014
  • '하도급 거래 공정화에 관한 법률' 법률이 일부 개정되어 지난 5월 28일 공포되었다. 이 법령은 오는 11월 29일부터 본격 시행된다. 개정된 주요 내용은 ${\Delta}$계약체결일로부터 30일 이내에 원사업자는 수급사업자에게 공사대금지급 보증 ${\Delta}$공사대금 지급수단이 어음인 경우 만기일까지, 어음대체 결재수단인 경우 하도급대금 상환기일까지 대금지급 보증 ${\Delta}$공사이행 중 원사업자가 공사대금 지급보증 사유 소멸 시 소멸일로부터 30일 이내에 공사대금 지급보증(다만, 일정한 경우 보증 제외) ${\Delta}$원사업자가 수급사업자에게 공사대금 지급보증을 하지 않은 경우 수급사업자가 한 계약이행 보증을 청구할 수 없도록 했다. 이로써 그동안 어음 수령으로 보호받지 못했던 대금지급 보증을 받을 수 있게 되었고 원사업자의 대금지급보증 면제사유(신용등급 A 이상, 발주자 대금직접지급, 한 건의 공사금액이 천만원 이하)가 소멸된 경우에도 30일 이내에 대금지급 보증을 해주는 등 대금지급 보증 범위가 넓어져 보증금을 원활히 받을 수 있게 됐다. 또한 원사업자가 대금이행 보증을 하지 않을 경우 하수급인의 계약 불이행을 사유로 계약이행 보증을 청구할 수 없는 조항이 신설되어 앞으로 대금지급보증 교부율이 높아짐은 물론 하수급인에 대한 보증을 주로 하는 대한설비건설공제조합의 보증 리스크 감소 효과가 기대된다. 대한설비건설협회(회장 이상일)와 대한설비건설공제조합(이사장 김기석)은 그동안 대부분의 하도급업체인 회원 및 조합원사의 권리보호와 원도급자의 불법 불공정 하도급 거래행위를 개선하기 위해 국회, 국토교통부, 공정거래위원회 등 관련부처에 지속적으로 건의하며 제도개선을 추진해 왔다. 이같은 협회와 조합의 공동노력에 의해 이번에 공정거래위원회에서 일부 개정한 것이다. 개정된 하도급거래 공정화에 관한 법률은 다음과 같다.

  • PDF

A Study on the Effect of External Response to Construction Subcontract Disputes (건설하도급분쟁에 대한 외부적 대응노력(컨설팅)의 효과에 대한 연구)

  • Bae, Chan Young;Hyun, Byung Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.72-82
    • /
    • 2019
  • The purpose of this study is to find out how any organizational response or dispute-related consulting has a significant impact on management performance before or during a dispute over a construction subcontract dispute. In this study, multiple regression models were used to analyze the impact on consulting performance. According to the result of the analysis, the positive effects on the overall external consulting effect is influenced by five variables such as financial values, increase of the number of disputes, construction of response system by contents, construction of response system in each period, dispute response external response system. The original business operators were also more likely to be affected by internal activities of conflict response companies and the extent to which external response systems were established. This means that the supply and demand service provider's business environment is relatively poor, forcing it to be lower than the internal and external activities and influences of the original business operators of the conglomerates.

A Study on Establishing Entry Strategies of Private Engineering Firms in the Overseas Urban Development Market (기업의 해외 도시개발 시장진출을 위한 전략수립에 관한 연구 - IPA 기법을 중심으로 -)

  • Song, Hokyoung;Yu, Youngsu;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.86-95
    • /
    • 2019
  • As the urban development economy is stagnating due to the reduction of the budget for Social Overhead Capital (SOC) and the stabilization policy of the real estate market, there is a steady increase in the interest of domestic construction companies to enter the overseas market. However, domestic construction companies are showing a decline in overseas urban development market as compared with advanced foreign companies having excellent financial management and overseas project management ability. Therefore, it is necessary for domestic companies to select an urban development model that meets the environment and the level of the country of entry, and to establish an advance strategy to manage the risks of overseas business. For this purpose, the factors of entry into the overseas urban development market through the existing research, literature analysis, and FGI were derived, and survey strategy and IPA analysis were conducted to develop strategies for entering the overseas urban development market. As a result, we have established a strategy for private companies to enter the overseas urban development market.

Risk analysis and countermeasures for subsea tunnel planning of national road 77 construction work between Abhae and Hwawon (압해-화원 간 국도77호선 건설공사 해저터널 계획을 위한 리스크 분석 및 대책방안)

  • Kim, Young-Joon;Kim, Zu-Cheol;Lee, Jae-Sung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.15-38
    • /
    • 2022
  • Recently, tunnel technology in Korea has shown various achievements such as long tunnel and large section by tunnel construction using TBM in Korea and abroad. Especially subsea tunnels are frequently designed and constructed. The Ga-deok subsea tunnel was completed in December 2010, and the Incheon North Port Tunnel was opened and operated in 2017, and the Bo-ryeong subsea tunnel between Dae-cheon Port and Won-san Island will be completed in 2021. In foreign countries, many subsea tunnels have been constructed and operated in such as Norway and Japan. The main technical problem in the construction of subsea tunnel is to secure stability due to high water pressure conditions and large-scale seawater inflow in fault zones and weak zones. In this paper, various risk factors and solutions are described in the subsea tunnel planning of national road 77 construction work between Abhae and Hwawon.

Development of a Geographic Information System(GIS)-Based Optimal Site System for Developing the Extreme Cold Region (공간정보(GIS) 기반 극한지 자원 개발 최적 위치 선정 시스템 개발)

  • Sewon Kim;Byungyun Yang;YoungSeok Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.4
    • /
    • pp.63-71
    • /
    • 2023
  • The extreme cold regions, including the South and North Poles, are rich in resources, but there are many constraints on resource development projects due to difficult access and a construction environment that is completely different from that of Korea. In recent years, global warming has increased the demand for the construction of resource exploitation plants. For resource development construction activities, a preliminary site analysis is required to minimize the risk of project implementation. In this study, the factors were analyzed to be considered in construction activities in extreme cold and optimal location selection system based on Geographic information system(GIS) has been developed. As a result of applying the development system to Alberta, Canada, where oil sand development is actively underway, it was confirmed that the results were consistent with the currently operating oil sand mining area.

An Analysis on the Investment Determinants for Insolvent Housing Development Projects (건설회사의 공동주택 PF 부실사업장에 대한 투자결정요인 분석)

  • An, Kukjin;Cho, Yongkyung;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.112-121
    • /
    • 2014
  • After IMF bailout crisis in Korea, project financing has been employed as a major funding vehicle for the housing development. In 2008, the recession of housing market due to the global financial crisis had an significant impact on the increasing insolvent site of PF based housing development project, resulting in serious impact to whole economy as a chain effect. In order to resolve this vicious circle of bankruptcy, the major construction companies were urged to take over the insolvent sites and invest to them for normal project exit, and finally play a critical role in normalization of market. Therefore, this study aims to define the core factors for decision making to invest to insolvent site and find out differences among constructors, developers, financial lenders. The results from AHP analysis, the profitability was the most important factor to constructors. Moreover, even though the location merit is little less, through competitive price, we can assure that stable profitability is most important factor to decide to invest in insolvent site. In conclusion, the price is cheap, is highly feasible, if the land secured, major construction company will participate in a PF business investment. These findings were verified by the investment case of major construction company.

How to Improve the Competency of Agency CM Companies to Conduct the CM at Risk Projects? (용역형 CM사가 책임형 CM 프로젝트를 수행하기 위해 필요한 역량)

  • Jeon, Myeongsik;Kang, Youngcheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.44-54
    • /
    • 2021
  • As the CM at Risk market grows recently, designers and CM companies that have been performing agency CM services have been showing their interests to participate in the CM at Risk projects. With the assumption that agency CM companies with a lot of experiences and know-how in the field of construction project management have created the circumstances to enter the CM at Risk market, this study investigates the competencies necessary for the agency CM companies to carry out the CM at Risk projects. The compentencies to run the CM at Risk projects were identified based on the literature review. A survey was conducted to identify the competencies that need to be supplemented first. The survey results revealed that competency related to partner companies, finance and guarantee, risk and claim, and project cost were identified to have a higher level of complementation compared to other competencies. In addition, considering that the level of competency that need to be secured is high, as the level of holding of all competency is on average 76% of the required level, in the beginning, small-scale CM at Risk projects with relatively low risk are mainly carry out, strengthening competency and then increasing the scale is considered more appropriate strategy.

Comparative Analysis of Default Risk of Construction Company during Macroeconomic Fluctuations (거시경제변동 전후 건설기업의 부실화 비교분석 - IMF 외환위기 및 서브프라임 금융위기 전후를 중심으로 -)

  • Choi, Jae-Kyu;Yoo, Seung-Kyu;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.60-68
    • /
    • 2012
  • The past IMF foreign exchange crisis and subprime financial crisis had a big influence on variability of macroeconomics, even if the origin of its occurrence might be different. This not only had a significant infrequence on the overall industries, but also produced many insolvent companies by being closely linked with a management environment of an individual construction company leading the construction industry. Actually, the level of default risk of construction companies before and after fluctuation of macroeconomics gets to experience a rapid changing process, and a difference in reaction against shock exists according to each company. Accordingly, the purpose of this paper is to confirm the fluctuation process of the default risk of construction companies under the fluctuation of macroeconomics such as the IMF financial crisis and the subprime mortgage crisis. As an analysis result, it is judged that the subprime financial crisis gave bigger shock to construction companies than the foreign exchange crisis, and it is expected that this would have a relation with the construction market before shock of macroeconomics. In addition, it was analyzed that when comparing insolvent companies with normal companies, the recovery speed of normal companies is faster. It is judged that this was affected by a difference of internal business capacity between insolvent companies and normal companies.