• Title/Summary/Keyword: 건설관리프로세스

Search Result 579, Processing Time 0.026 seconds

The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools (VSM기법을 활용한 커튼월 공사의 설계 프로세스 개선)

  • Kim, Chang-Duk;Lee, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.128-137
    • /
    • 2006
  • This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

A Study on Business Process Re-engineering of Construction Company Based on ERP Implementation (ERP 구축을 통한 건설회사의 프로세스 개선사례 연구)

  • Min, Kyung-Seok
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2006.10c
    • /
    • pp.443-447
    • /
    • 2006
  • 경영환경의 변화에 대한 기업의 대처능력이 곧 생존에 직결되고 있는 시점에서 이에 대한 해결책으로 통합업무 프로세스를 지향하는 ERP(Enterprise Resource Planning)을 통하여 경쟁력을 강화하려는 노력이 진행되고 있다. 그러나 ERP는 적용상의 어려움과 실제 업무와의 차이점으로 인하여 막대한 노력을 들이고도 성공적으로 업무에 활용되지 못하는 사례가 많은 실정이다. 특히 건설업의 경우는 주문생산 방식의 프로젝트 특성 및 영세한 외주업체와 협업해야 하는 환경요인으로 인해 전산환경과 정보화에 많은 제약사항들을 가지고 있다. 본 연구에서는 건설업체 D사의 예를 들어 건설업 ERP 패키지를 도입하여 업무 개선에 적용한 사례를 소개하였다. 건설사 고유 업무인 공사관리 업무 및 일반관리 업무를 대상으로 현행 프로세스를 진단하고 문제점을 도출하였으며 ERP의 Best Practice를 바탕으로 프로세스 개선방안을 제시하였다. 회사는 ERP와 유기적으로 연결된 개선안의 추진을 통해 지속적인 경영혁신 활동의 토대를 구축하였으며 이에 따른 정성적, 정량적인 성공요인을 분석하였다.

  • PDF

A Study on the Improvement of Processes of Verification for Construction Firm's Records of Performance (건설공사 실적증명 프로세스 개선에 관한 연구)

  • Lee Hong-Jae;Cheon Bong-Gi;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.369-372
    • /
    • 2001
  • The processes for verification of performance records in construction have many problems according to construction firm's participating in some of the processes. This study analyzed about current processes and provided improved processes with IDEF method. As the result of this study, it was found that 'As-Is' model has many repetition of activities and 'To-Be' model has three times more effective than 'As-Is' model has. The data modeling which is available for 'To-Be' model was also suggested.

  • PDF

Effective Management of Construction Information Using a XML Based Project Deliverable Management System (XML 데이터베이스를 활용한 성과물 관리 프로세스의 효과)

  • Moon, Sungwoo;Yang, Byungsoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.481-489
    • /
    • 2006
  • These days construction management is executed in an information technology environment, which creates a large volume of digital data. At the completion of a project, the contractor is required to transfer to the owner the digital data as project deliverables usually in a form of CD's. From an enterprise-wide view point, this traditional way makes the management of project deliverables ineffective as the data accumulated from different projects could be enormous. The objective of this paper is to propose a structured way to utilize a XML database for better management of project deliverables. The XML database provides an environment which users can access through a project deliverable management system (PDMS). A pilot of the PDMS has been developed to test the effectiveness of document control. The result of the test demonstrates that the effectiveness of project deliverable management can be increased by providing a high transportability and usability of data in the construction life cycle.

A Case Study of Knowledge Management for Construction Business Based on Construction Management Process and Information System (공사관리프로세스와 정보화 기반의 건설 지식경영 추진 사례)

  • Shin Yong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.153-159
    • /
    • 2004
  • This Paper describes a Practical case study of Knowledge Management for- construction business, focusing on 1) knowledge definition as material knowledge assets and human knowledge assets. 2) adaptation of Knowledge Management to a business organization by combining with construction management process, and 3) relation between Knowledge Management and Information System, based on operating experience at a major Korean construction company, Samsung Engineering and Construction Co..

  • PDF

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.