• Title/Summary/Keyword: 건설공사 이해관계자

Search Result 9, Processing Time 0.026 seconds

A Study on the Reinforcement of Disaster Prevention for Construction Stakeholders in Korea (국내 건설공사 이해관계자에 관한 재해예방 강화 연구)

  • Ki-Taek Oh
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.192-198
    • /
    • 2024
  • Purpose: In order to establish a safety management system led by an orderer in the construction industry, the orderer should be positioned at the peak of the construction industry safety management system and a system that can effectively support safety supervisors who can assist the orderer's role should be reflected. Method: This study collected and analyzed data on the status of safety management of construction business owners through prior research on safety management of construction business owners and a survey on the actual condition of those involved in the construction business. Results: The top priority is to improve the safety awareness and safety management capabilities of the orderer, and through these efforts, the orderer-led safety management system will be established when a national consensus on the responsibility of the orderer, such as the Serious Accident Punishment Act and the Occupational Safety and Health Act, is formed in the event of an accident such as a serious accident. Conclusion: In order to establish a safety management system led by an orderer in the construction industry, it contributes to disaster prevention by positioning the orderer at the peak of the construction safety management system and reflecting a system that can effectively support safety supervisors who can assist the orderer's role.

Governance-Based Measures to Solve the Conflicts in Pyeongtaek-Dangjin Port (평택당진항의 갈등 원인과 거버넌스 접근을 통한 해결방안)

  • Lee, Dong-Hyon
    • Journal of Korea Port Economic Association
    • /
    • v.29 no.3
    • /
    • pp.135-158
    • /
    • 2013
  • There have been many conflicts in Pyeongtaek-Dangjin Port among central government, metropolitan council, and cities over the jurisdiction of reclaimed port area, an international passenger terminal construction and a bridge between the port and Dangjin area. This study found out two causes for the conflicts in terms of governance. First, the current governance structure of Pyeongtaek-Dangjin port has high levels of conflict and disputes among stakeholder. Second, there is no leading agency which is responsible for the future development of the port. It is very important to decrease the possibility of conflict and to establish leading agency. Measures to decrease the likelihood of conflict include establishment of conflict resolution mechanism, the clarification of the facts and applicable law, mutual exchanges between stakeholder. Measures to establish a leading agency include the introduction of a single governance, establishment of Pyeongtaek-Dangjin Port Authority, central-local combined governance, and empowering PA to do all port management.

Implementation Status of TPMS in GS E&C's Overseas Projects (GS건설 해외 Project의 TPMS 적용 현황)

  • Lee, Jun-Bok;Park, Chan-Jeong;Kim, Sang-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.135-139
    • /
    • 2008
  • GS E&C applies TPMS(Total Project Management System) to all construction projects. This system is applied to all overseas projects, it is successfully used not only GS E&C but also subcontractors, vendors and clients. TPMS collects data spontaneously that is used to each participant, improves effectiveness in construction projects and gives transparency to all participants while sharing same information. This paper is aimed to share successful case study focusing on document management system, and how to develop TPMS in the future.

  • PDF

업무상 재해의 판례 - '건설공사 현장감독' 의 급성뇌경색 발병이 업무상인지의 여부

  • Korea Industrial Health Association
    • 월간산업보건
    • /
    • s.178
    • /
    • pp.53-54
    • /
    • 2003
  • 산업재해보상보험법(법률 제4826호) 4조 1항에 의하면 '업무상 재해라 함은 업무상의 사유에 의한 근로자의 부상, 질병, 신체장애 또는 사망을 말한다'로 규정되어 있습니다. 질병을 포함한 재해가 업무상 사유에 의한 것인가의 여부를 판단하는 것은 쉬운 일이 아니며 더욱이 국가의 사회적.경제적 여건에 따라 시대적으로 업무관련성의 범위나 인정기준등 개념이 변화되고 있기 때문에 산업보건분야 관련 종사자들은 관심을 갖고 항시 그 흐름을 파악하는 것이 바람직합니다. 본 란에서는 관계자 분들의 이해를 돕기 위해 근로복지공단에서 발행되는 '산재보험법판례속보'에 게재된 내용을 선별하여 업무상 재해 인정에 관한 최근의 법원 사례를 소개합니다.

  • PDF

Necessity of Improvements on Code of Practice at the Demolition Work considering Building Structure Type : Based on Demolition work of Permission and Registration (건축물의 구조유형을 고려한 해체공사 제도 개선 방안 필요성 - 해체공사의 허가 및 신고를 기준으로 -)

  • Shim, Yukyung;Jeong, Jaewook;Lee, Jaehyun;Jeong, Jaemin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.66-74
    • /
    • 2020
  • To prevent incident of demolition work the Building Management Act was implemented to manage demolition work. According to this law, buildings with the scale upper than 500㎡ of floor area are classified as permission to conduct the demolition work, however it may be hard to perform safety management at demolition work. In addition, the risk level of demolition work is varied with related to the structure type. So, the purpose of this study is to suggest the improvements of criteria on demolition work considering building structure types including small-scale structures such as masonry, wooden, and other structure. The research process was conducted by three steps. (I) Application of Building Management Act; (II) Analysis of demolition work by structure types; and (III) Subdivision of permission targets by building structure types. The result of this study, permission ratio was only 10% for total demolition work and 2.43% for masonry. Because the masonry, wooden, and other structure types are concentrated on a floor area of small-scale, the separate criteria of demolition work is need to prevent the accident and fatal incident. Through the results, the decision maker can be utilized (1) For the special building structure types, the criteria of enhanced safety management are applied by referring to the overseas law ; and (2) The demolition work can be considered by the criteria of separate permission in terms of structure types.

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.

An Analysis of Judicial Precedents for Progress Payment to Subcontractor - Focused on Public Construction Projects - (하도급대금 직접지급에 대한 쟁점판례 분석 - 공공 건설공사를 중심으로 -)

  • Lee, Dong-Hoon;Kim, Sun-Kuk;Song, Yong-Sik;Kim, Baek-Yong;Lee, Won-Suk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.111-120
    • /
    • 2010
  • The public construction industry in Korea involves a variety of stakeholders, encompassing multiple layers of contractual relationships that crisscross between the State as project client and the contractors, as well as subcontractors. In such a hierarchical landscape, managerial crises of contractors involving bankruptcy or insolvency can result in unexpected damages for both clients and subcontractors. Accordingly, the applicable legal framework requires project clients to act as patrons in relation to making payments to subcontractors, and stipulates provisions pertaining to direct payments to subcontractors in order to promote the balanced development of the national economy in terms of the public interest by protecting small and medium-sized businesses working as subcontractors for large businesses. However, the relevant legal documents provide for different payment criteria and procedures from document to document, and leave room for variations in the interpretation and construction of applicable provisions, which leads to disputes and discrepancies in court rulings. For this reason, it is necessary not only to compare and analyze statutory provisions pertaining to direct payment to subcontractors, but also to review issues of contention in actual cases. This study aims to analyze issues in cases involving payment to subcontractors from the perspective of the project client overseeing and supervising the construction business. The conclusions from such an analysis will help to effectively resolve subsequent cases of a similar nature by suggesting a strategy to improve the relevant statutory provisions pertaining to direct payment to subcontractors.

Development of Program Management Information Systems for Urban Renewal (도심 재생 종합 사업관리 시스템의 개념 및 개발)

  • Choi, Hye-Mi;Kim, Ju-Hyung;Lee, Sung-Bok
    • Land and Housing Review
    • /
    • v.1 no.1
    • /
    • pp.9-17
    • /
    • 2010
  • Due to the variety of processes that are mainly influenced by the modification of law and regulations, it is difficult to propose a formal procedure of urban renewal projects. In addition, conflicts among various participants and stake-holders have made urban renewal difficult to manage. Needs for new systems to support management of this type of projects have been raised. This system should enable users to manage program aspects as well as projects given that the urban renewal consists of several projects. According to analysis of current context, the requirements of the system are classified as follows: a method to create flexible systems to cope with various process; functions to provide data on cost and schedule; user-friendly visualized tools enhancing understand of non-experts or less-experienced participants. This paper summarizes the background, requirements, concept and model of the system. Currently, prototype systems have been developed. Regarding outputs presented so far, potential benefits of the system are presented as well.

Survey and Analysis of Stakeholder Opinions on the Establishment Procedure of Safety Inspection System for Highway Construction Clients (고속도로 건설공사 발주자의 안전점검 체계구축 절차에 관한 이해관계자 설문조사 및 분석)

  • Eung Ho Park;Su Dong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.4
    • /
    • pp.57-65
    • /
    • 2023
  • The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.