• Title/Summary/Keyword: 건설공사비관리

Search Result 654, Processing Time 0.029 seconds

A Study on Practical Ways to Improve Pricing Criteria for Technical Service Contracts (기술용역 대가기준의 문제점 및 개선방안)

  • Lee, Taewon;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.33-43
    • /
    • 2014
  • Goods, services and construction works needed by central government entities, local government entities, and other public institutions are procured with national budget. For efficient budget execution, Article 9 Paragraph 1 of the Enforcement Decree of the Act on Contracts to Which the State is a Party (hereinafter "State Contract Act") provides for the criteria for determining estimated price. Sub-paragraph 2 of the paragraph provides for the "determination of estimated price by cost calculation". On this legal basis, pricing criteria for the determination of estimated price, based on the project purpose, are announced by responsible authorities. This study analyzes the pricing criteria for technology services and proposes a price calculation methodology that can ensure transparency, as a practical improvement for more rational and efficient budget execution in the public sector.

Selection Method of Eco-friendly Finishing Materials Considering Cost Efficiency for the Aged Housing Remodeling Projects (노후 공동주택 리모델링의 경제성을 고려한 친환경 실내 마감재료 선정 방안)

  • Kim, Ki-Hyun;Kim, Kyung-Rai;Hwang, Young-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.84-91
    • /
    • 2008
  • "Eco-friendly construction" is an emerging issue in the building industry. Main purpose of the eco-friendly construction is to sustain the health and environment of building residents and to minimize the harmful effect on their environment. Apartment residents have great concern on eco-product, since many cases are reported that Sick Building Syndrome is caused by toxic substance from building materials. Environmental performance is to meet through using the highest grade eco-friendly materials. However, generally eco-friendly materials are more expensive than normal materials, Therefore, using eco-friendly materials at public housing project is limited to economical aspect. The purpose of this paper is development of eco-friendly material selection model considered cost efficiency. The selection of Eco-friendly finishing materials and their methods are constructed to consider environmental performance level and cost index compositively. Development of eco-friendly material selection method is economic and reasonable one when public housing is constructed.

Estimating Productivity of AL-Form Operation Using Web-CYCLONE System (웹싸이클론을 활용한 알루미늄 폼 공정의 품셈산출)

  • Lee, Dong-Eun;Kim, Yong-Woo;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.115-122
    • /
    • 2013
  • Construction Standard Productivity Manual (CSPM) has been used for estimating the contract amount of public construction projects. CSPM has been annually either revised and/or newly enacted with high costs. Therefore, This study makes use of CYCLONE, which is a simulation modeling and analysis system specialized in construction operation, to improve the revising and enacting processes of CSPM. This paper presents the CSPM revision module that is an Add-in to Web-CYCLONE. The new module can be effectively used to incorporate the auxiliary tasks and the non-productive tasks into AL-Form operation model. The outputs obtained from the models using he CSPM revision module and from work sampling were compared to verify the usability of the add-in modules. This study verifies that the new module can effectively assist enacting and/or revising CSPM.

Development of Korean Environmental Windows using Entropy (엔트로피를 이용한 한국형 환경창 개발)

  • Jeong, Anchul;Oh, Sungryul;Kim, Seoungwon;Kim, Minseok;Jun, Kwansue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.108-108
    • /
    • 2015
  • 준설이란, 물리적으로 수저의 퇴적물을 제거함으로써 하도관리에서 가장 확실하게 퇴적물을 제거하고 통수 단면적을 증가시킬 수 있는 방법 중 하나이다. 우리나라에서는 주로 해안이나 항만에서 주를 이루어져 왔으며, 하천에서는 주로 골재채취를 목적으로 하는 소규모 준설사업이 대부분이었다. 그러나 4대강 살리기 사업으로 인해서 건설된 다기능보는 수위 및 유량을 조절할 수 있다는 장점이 있는 반면, 흐름 및 유사의 연속성을 차단하여 유사퇴적이 발생할 가능성이 높아졌음으로 이를 위한 대책으로 유지준설이 이루어져야 한다. 준설은 대규모의 사업비가 투입되는 건설공사이면서, 수저의 퇴적물을 물리적으로 제거함에 따라 고탁도를 발생시키고 생태계를 교란시키는 등의 문제가 있다. 준설선진국인 미국의 경우, 이러한 문제점을 최소화하기 위한 일환으로 환경창(EWs; Environmental Windows)을 개발하여 미국 준설사업의 약 80%에 적용하여 관리하고 있다. 환경창이란, 준설 및 준설토 처분에 관한 작업이 이루어질수 있는 기간을 의미하여, 결정적으로 사회 환경적으로 준설에 따른 영향의 강도가 상대적으로 작은 기간을 선정하여 준설을 허용하는 기간이다. 본 연구에서는 이러한 환경창를 국내에 적용하기 위하여 어류, 조류, 친수시설 이용빈도, 홍수기를 이용하였다. 연구대상지역은 낙동강 유역의 금호강 합류점이며, 홍수기에는 준설하지 않는 것을 대전제로 하였다. 어류는 대표어종을 선정하여 연구를 진행하였고, 그 외 조류는 법적보호종인 흑두루미, 친수시설 이용빈도는 4대강 방문객 통계자료를 사용하였다. 엔트로피 가중치 산정방법을 통하여 각 속성별 가중치를 산정하여 최종적으로 한국형 환경창을 제시하였다. 본 연구에서 제시한 한국형 환경창은 기존의 환경창과 비교하였을 때, 영향의 정도를 수치로 표현하여 의사결정권자가 간편하게 환경창을 결정할 수 있도록 의사결정지원을 한다는 장점이 있다.

  • PDF

A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior (BIM기반 공동주택 마감 물량 산출 정확도 연구)

  • Lee, Moon-Kyu;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.12-22
    • /
    • 2013
  • Construction industry throughout the construction projects life cycle using BIM is able to manage information. Among them, BIM-based quantity take-off is directly connected to the data of the construction business as an important management element that is essential for one of the management factors of feasibility study and economic analysis. In addition, the result of BIM-based quantity take-off can be varied depending on modeler, so the exact guideline for BIM modeling is necessary. The BIM-based quantity take-off in terms of reliability and accuracy of the information is very important. Therefore, this study verified the BIM modeling of the apartment interior materials using both separate object and composite object was validated the quantitative comparison of the difference in BIM-based quantity take-off for accuracy & reliability judgment of BIM-based quantity take-off and realistic & desirable suggestion of BIM modeling way. As the result of this study, it is preferable to model various interior materials to use separate object for the purpose of correct BIM-based quantity take-off, but the realistic way of the BIM modeling using both separate object and composite object jointly was verified in order to judge BIM-based quantity take-off in terms of work productivity.

An Experimental Study on the Structural Performance of Lateral Resistance in Steel Elevator Pit (강재엘리베이터 피트 측압저항 구조성능에 관한 실험적 연구)

  • Hong, Seong-Uk;Kim, Tae-Soo;Baek, Ki-Youl
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.1-8
    • /
    • 2019
  • Steel elevator pit was developed for the purpose of minimizing the excavation, simplifying the construction of the frame and economical efficiency by improving the problems that occurred in the existing reinforced concrete. It is common to apply conventional RC method through excavation to underground structures such as underground floor collector well and elevator pit. In recent years, the use of steel collector well and steel elevator pits to reduce construction costs by minimizing the materials of steel and concrete has been continuously increasing. The steel elevator pit is an underground structure and then the performance of the welding part and the structure system is important. Specimen with only steel plate and concrete without studs could support the load more than 3 times than the specimen with deck only. Therefore, even if there is no stud, the deck (steel plate) rib is formed and the effect of restraining the steel plate and the concrete during the bending action can be expected. However, since sudden fracture in the elevator pit may occur, stud bolt arrangement is necessary for the composite effect of steel plate and concrete. It is expected that the bending strength can be expected to increase by about 15% or more depending with and without stud bolts.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

A Study on the Activation of Green Remodeling to Achieve Carbon Neutrality - Focusing on a case of Gwangmyeong City - (탄소중립 목표 달성을 위한 그린리모델링 활성화 방안에 관한 연구 - 광명시 사례를 중심으로 -)

  • Kim, Gi-Ran;Lee, Ju-hyun;Kim, Kyong Ju;Kim, Kyoungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.12-21
    • /
    • 2023
  • Green remodeling proposed in the Korean New Deal is a project to build or remodel eco-friendly and energy-efficient buildings using renewable energy facilities and high-performance insulation for public buildings. The government intends to achieve the carbon emission reduction target by conducting green remodeling. Major overseas cities that conduct green remodeling are actively promoting technology support and promotion along with energy performance evaluation according to building characteristics, subsidies for private revitalization, and tax benefits. With this background, the analysis of the current status and problems of the green remodeling project was performed and the Activation factors of Green Remodeling were derived from survey results. This study suggested strategic measures such as a participation of civil society, promotion, and priority selection of administration and policy measures such as a leading role of the public sector, expanding support for the socially underprivileged, and financial support and tax benefits. And this study results are expected to be utilized as basic data to promote the green remodeling project.

An Analysis of the Long-term Behavior of the Cable System in the Suspension Bridge (현수교 케이블 시스템의 장기거동 분석)

  • Ryu, Duck-Yong;Kim, See-Dong;Jung, Hie-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.135-144
    • /
    • 2009
  • The cable system of suspension bridges is a very important non-elastic element which caries an external load by a tension force of the cable, such that creates the integrity of a structure. It is not easy to find if cable system have been changed by the maintenance activities such as repairs or reinforcement. Sometimes the maintenance can cause structural deformations and changes of the tension force in cables. In most cases, the cable stayed bridges are managed by health monitering system, however, the main cable of suspension bridges need to develop more accurate and efficient monitoring system. The Namhee Bridge was constructed 35 years ago and it has been continually repaired and reinforced after then. This study describes the behavior of the cable system by analysing many of inspective reports and by using the results of hanger rope test and for the shape of main cables surveys.

Analysis of Electrical Resistivity Change in Piping Simulation of a Fill Dam (필댐의 파이핑 재현시험시 전기비저항 변화 분석)

  • Ahn, Hee-Bok;Lim, Heui-Dae
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.4
    • /
    • pp.59-68
    • /
    • 2010
  • Piping, a common form of internal embankment erosion, is caused by progressive movement of soil particles through an embankment. The phenomenon commonly occurs with precursory signs of development of fractures in dam structures, but also occurs without any noticeable signs in dams that showed satisfactory dam performance for several years, due to dissolution of soluble material in an embankment. While piping accounts for nearly 50% of the causes for dam failure, few studies have been made for systematic evaluation of the phenomenon. In this study, we attempted to monitor the changes in electrical resistivities of fill-dam material while a saddle dam is dismantled for the construction of emergency spillways of Daechung dam. Two artificial subhorizontal boreholes were drilled into the embankment structure to simulate piping along the two artificial flow channels. Monitoring of changes in electrical resistivity showed an increase in resistivity values during piping. Thus, the investigation of resistivity over time could be an effective method for piping prediction.