• Title/Summary/Keyword: 건설계약

Search Result 549, Processing Time 0.027 seconds

A Study on Application of Performance Warranty Contract to Building Construction (성능보증계약제도의 건축분야 적용 방안에 관한 연구)

  • Ko, Hyun;Kim, Kyung-Hwan;Lee, Youn-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.687-690
    • /
    • 2007
  • This study is a basic research on looking onto bringing performance warranty contract into the country, to consider the usage in architecture which it is usually used on road pavement in developed countries. The study will also apply performance warranty contracts on public private partnerships through examination and analysis of various matters which will lead to globalization of the korean architecture industry, the increase of quality of result, better convenience for the orderer, the decrease of cost, and the acceleration on research for technical development.

  • PDF

정부입찰.계약집행기준 회계예규 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.216
    • /
    • pp.40-41
    • /
    • 2008
  • 기획재정부가 특정규격 자재(단품)의 급격한 가격 변동시 계약금액을 조정하는 기준을 새롭게 마련하여 지난 5월 1일부터 시행에 들어갔다. 통상 물가변동으로 인한 계약금액조정(ES)은 계약 후 90일이 경과하고, 입찰일 기준으로 가격이 3% 이상 증감시 계약금액을 조정(총액물가조정)하고 있으나 최근 원자재가격 급등으로 하도급업체 등 중소기업의 경영에 큰 부담으로 작용함에 따라 경제정책조정회의(2008.3.26. 원자재 가격 상승에 대응한 중소기업 애로 해소방안)에서 단품ES제도 시행기준을 마련하여 이번에 개정된 것이다. 이번 단품ES 제도의 도입으로 최근 가격이 급등한 단품*(철근,H형강 등)을 취급하는 중소하도급업자의 경영 애로를 다소 완화시킬 것으로 기대된다.

  • PDF

법령과고시 - 지방계약법 계약예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.276
    • /
    • pp.53-55
    • /
    • 2013
  • 안전행정부가 지방 중소기업의 입찰참가 기회를 확대와 하도급업체 보호 강화를 주요내용으로 하는 "지방자치단체 입찰시 낙찰자 결정기준"과 "지방자치단체 입찰 및 계약집행기준" 예규를 개정하고 7월 1일부터 시행에 들어갔다. 개정된 예규에 따르면 중소기업 지원과 입찰 참여 확대를 위해 5억원 미만 주계약자공동도급 공사에 접근성 평가를 도입해 지역 중소업체의 입찰 참가를 확대하도록 했으며, 하도급업체 보호를 위한 방안으로 원도급자가 하도급계약을 체결하면서 지나치게 하도급금액을 낮추거나 하도급 표준계약서를 사용하지 않거나 하도급 내용을 부당하게 변경하는 등의 사례를 방지하기 위해 공사 적격심사기준을 강화했다.

  • PDF

A Study on the Contractor's Liability for Defect in Public Construction Project - through comparing Civil Law with Government Contract Law - (공공건설사업 하자에 대한 수급인의 책임에 대한 연구- 민법과 국가계약법령의 비교를 통하여 -)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.69-79
    • /
    • 2001
  • Characteristics of Contactor's Defect Liability was too many discussed. But it's not clearly defined yet. Because recent Government Construction Projects are very complex and executed through long time, too many conflicts were appeared related to Contactor's Defect Liability. Therefore to analyse and to resolve the conflicts legal aspects of Contactor's Defect Liability stated in Civil Law and Government Contract Act was systematically compared. The result of this research is as follows : (1) Characteristic of Contactor's Defect must be regarded as a breach of Contract and be an incomplete contract implementation. (2) To decide the range of Damage, Characteristic of Defect must be regarded. (3) Contactor's Defect Liability must be effectual from the day of delivery. (4) Retainage must be added to secure the completion during the Contract Period and Defect Repairing Liability must be omitted in the Contract performance Security.

  • PDF

A Proposal of Improvement Devices for General Conditions of Contract in Claim-related Provisions (공사계약일반조건의 클레임 관련 조항의 개선방향)

  • paik, Hwa-Sook;Yang, Chang-Hyun;Yoon, Ja-Young;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.273-276
    • /
    • 2007
  • Construction work has character which claim or dispute is frequently raised. This means that each construction project has it's own contract documents due to the difference of environment and time. Therefore to overcome the associated risks, domestic contract rules and acts should be reformed. Several well-recognized contract documents developed by FIDIC, AlA, CMAA and general conditions of the contract is investigated and analyzed. Based on the research outcomes the direction of reformation is suggested.

  • PDF

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF

A Study on Improvement of Contract Regulations for Adjusting Contract Amount in Public Construction - Focused on examples of price fluctuation classification - (공공건설 계약금액 조정의 계약예규 개선방안 연구 - 물가변동 분류 사례 중심으로 -)

  • Lee, Wonjei;Shin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.82-89
    • /
    • 2020
  • Article 64 of the Enforcement Decree of the National Contract Act The requirement of the pre-amendment statute related to the adjustment of the contract price was 5% or more of the price fluctuation rate from the date of the contract. However, the meeting requirement was changed from 5% or more to 3% or more from the date of signing of the Presidential Decree No. 19035 to 2005. 9. 8. The method of adjusting the contract amount was also changed to determine the contractor's desired adjustment method at the time of contract. Alleviating these requirements and revising the empowerment of contract partners is intended to prevent difficulties in achieving smooth objectives by applying to public construction contractors without unfairly benefiting or unfavorable to contract partners. Even if the standards are relaxed and the rights are secured as described above, if the existing provisions for the adjustment of price fluctuation are applied, unlike the original purpose of the government system, the Korea Bank's price economic statistics classification method and the contract construction classification criteria applied in public construction work Due to the inconsistency, it can be seen that the amount of adjustment for price fluctuation by construction type is excessive and underestimated. Therefore, the purpose of this study is to analyze problems through cases and to make appropriate construction cost adjustment through improvement measures.

노무관리 - 건설 일용근로자의 포괄임금계약 관행 적정성 논란

  • Lee, Deok-Jo
    • 월간 기계설비
    • /
    • s.257
    • /
    • pp.64-68
    • /
    • 2011
  • 현행 건설일용근로자의 포괄임금 계약에 대한 대법원의 판결과 고용노동부의 지침이 변경되어 혼란이 야기되고 있다. 고용노동부는 지난 8월 8일 건설 일용근로자의 포괄임금제 업무처리 지침을 변경하고 일선 사업장에 시정 지시 공문을 발송하고 있다. 새로 변경된 건설 일용근로자의 포괄임금제 업무처리 지침은 일당제 일용근로자의 고용형태를 두 가지로 구분하여 일급에 포함되었다고 볼 수 있는 수당과 그렇지 않은 수당을 명시하고 있다. 일급에 포함되었다고 볼 수 없는 수당의 경우 해당 근로수당을 포함하여 체결된 근로계약이 부적정하다는 입장이며, 이에 따라 일당제 일용근로자를 사용하고 있는 사업장에 시정지시를 하고 있다는 것이다. 그러나 현행 판례 및 행정해석, 기존 고용노동부의 지침은 제수당을 미리 합산한 일정금액을 지급하기로 하는 포괄임금 계약을 인정하고 있다. 이처럼 판례와 고용노동부의 지침이 서로 다르고, 새로 변경된 고용노동부의 지침을 반영하는 새로운 판례가 아직까지 나오지 않았기 때문에 사업장에서는 사례별로 유연한 대응이 필요하다.

  • PDF