• Title/Summary/Keyword: 건설감리

Search Result 200, Processing Time 0.021 seconds

A Study on General Contractors' Control Measures for Construction Cost Overrun (종합건설사 현장의 원가초과 억제 방안 분석에 관한 연구)

  • Park, Jee Young;Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.27-36
    • /
    • 2024
  • The effective control of cost overrun is a crucial issue for construction companies to secure profitability. Especially in situations where cost pressures are significant due to factors such as rising raw material prices and increased financial costs due to high-interest rate policies, cost overruns resulting from project failures have a highly detrimental impact on the profitability of construction firms. The objective of this study is to analyze the current status of cost overrun control measures adopted by construction companies using the IPA technique and provide key characteristics and implications. The IPA analysis results showed that practitioners in general contractors exhibit a high level of interest and effort regarding cost overrun while the performance level is relatively low. Nevertheless, the measures considered important to control cost overruns generally show a high tendency for execution as well. Cost overrun control measures that show high importance but low execution are primarily related to collaboration and communication sectors. To effectively control cost overruns, enhancing collaboration and communication with construction supervisors/CM, headquarters, and regulatory authorities emerged as the most urgent need. Through this study, the current status and areas for improvement regarding cost overrun control measures in general contractors can be identified. This can be valuable for deriving directions and enhancements for future cost overrun control strategy development.

A Framework of Automating Inspection Task Generation for Construction Projects (건축 시공단계 검측 업무 자동 생성을 위한 프레임워크 개발)

  • Jo, Seuckyeon;Lee, Jin Gang;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.40-50
    • /
    • 2023
  • Quality control (QC) is an essential work for the successful construction project execution. Recently, robust application of ICT to the QC tasks leads to utilizing innovative technologies and equipment. However, overall planing of QC works needs to take place before applying new technologies to each and individual QC task. The objectives of this research involve developing a database and an algorithm that identifies QC tasks and related information upfront. In addition, the researchers developed a methodology to generate inspection tasks in conjunction with construction work tasks. The Korean Ministry of Land and Transportation provides standard supervision checklists. They were classified based on criteria of inspection items, methods, period and the scope. Reinforced concrete work was selected as a case study for validation of the method. This framework can function when planing construction tasks with any type of planning tools and innovative technologies. The researchers expect this framework may contribute to various construction projects when developing QC plans and tasks with applicable technologies.

A Study on the Reinforcement of Disaster Prevention for Construction Stakeholders in Korea (국내 건설공사 이해관계자에 관한 재해예방 강화 연구)

  • Ki-Taek Oh
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.192-198
    • /
    • 2024
  • Purpose: In order to establish a safety management system led by an orderer in the construction industry, the orderer should be positioned at the peak of the construction industry safety management system and a system that can effectively support safety supervisors who can assist the orderer's role should be reflected. Method: This study collected and analyzed data on the status of safety management of construction business owners through prior research on safety management of construction business owners and a survey on the actual condition of those involved in the construction business. Results: The top priority is to improve the safety awareness and safety management capabilities of the orderer, and through these efforts, the orderer-led safety management system will be established when a national consensus on the responsibility of the orderer, such as the Serious Accident Punishment Act and the Occupational Safety and Health Act, is formed in the event of an accident such as a serious accident. Conclusion: In order to establish a safety management system led by an orderer in the construction industry, it contributes to disaster prevention by positioning the orderer at the peak of the construction safety management system and reflecting a system that can effectively support safety supervisors who can assist the orderer's role.

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

The Effect of Construction Safety Supervision System on Risk Control and Reduction (건설안전감리제도가 위험제어 및 절감에 미치는 영향)

  • Lim, Jin-Sang;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.3
    • /
    • pp.1-9
    • /
    • 2018
  • This study is intended to look into the effect of construction safety supervision system on risk control and reduction. To achieve this, a survey was carried out to 114 companies in construction, ordering, contract and management. The overall findings were as follows. The effect of construction safety supervision system on risk control and reduction showed that factors of supervision system, supervision cost and supervision method had a positive effect on risk control and reduction. And their perception of the introduction of safety supervision system in construction sites according to process showed that there was a difference between them according to the field of ordering, contract and supervision. There was the biggest difference between owner and contractor in double supervision system, but no difference between them in the perception of risk reduction. These results show that all ordering, contract and supervision are positively needed for the introduction of construction safety supervision. This means that there is a difference between owner and contractor in the perception of process according to system operation. All companies agree to system improvement by the settlement of safety supervision system for the prevention of safety accidents and safe construction, but the systematic complement of safety supervision is the burden of contractor. And there is a big difference between owner and contractor in the perception of responsibility and concern for cost burden.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

The Study of Quality Control in Engineering on the Turnkey Project(Focus on Change Orders at the Construction Phase) (턴키공사 설계품질관리에 관한 연구(시공단계의 설계변경을 중심으로))

  • Lee Yong-Jin;Lee Teck-Wn;Kim Jin-Young;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.58-66
    • /
    • 2001
  • Turnkey project, also called Design-Build project, has been expanding and diversifying its business into the Korean market. However, it has been experiencing numerous difficulties due to a large number of change orders on the public turnkey project. Change order during the construction phase impact on time deliveries, budget and quality on a turnkey project. In preparation for this, the government has to improve the awarding procedure and general conditions for turnkey projects. Contractors should also cooperate with their co-working partners and establish a standardized procedure, which provides change order control for efficient implementation on the construction site.

  • PDF

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

A Study on the Data Organization of Specification Information for reference of Design Information (설계정보 참조를 위한 시방정보의 자료구조화에 관한 연구)

  • Kim Jae-hyun;Song Younk-Kyou;Kim Uk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.92-100
    • /
    • 2001
  • The architectural drawing, construction project specification, etc. are included in the contract of a documents. However, construction project specification, for being documentation, is not utilized to such an extent. The reason is that specification information is difficult in collecting information in relation to the architectural drawing, material finishing list and other architectural information. Therefore, an integrated model, which can be associated with other architectural information, is needed, and a DB based on this integrated model must be established in order for it to be utilized in design, construction, and management. The DB, which is established through this process, must be updated according to modification in design, and construction. Furthermore the specification must be in document on the web for reference. Consequently in this research, the structure of integrated model has been introduced, and it has made the search and preparation of the integrated model on the Internet, using the specification information DB established for the mutual reference of DB, possible. The improvements of construction project specification standards are expected by this system. Also, it will bring about Improvements upon claim prevention, and design, construction, management qualities. Furthermore, it will make the use of information more convenient in practical business such as order agency, design service and building site.

  • PDF