• Title/Summary/Keyword: 강박스거더교

Search Result 38, Processing Time 0.03 seconds

Behaviors According to the Reinforcing Method of the Support Diaphragm Manhole in Steel Box Girder Bridge (강박스거더 지점부 다이아프램 맨홀의 보강방법에 따른 거동)

  • Lee, Seong Haeng;Kim, Kyoung Nam;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.6 s.79
    • /
    • pp.649-660
    • /
    • 2005
  • Since the diaphragm manhole of steel box girder bridges is designed generally from experience, it has become the primary factor in the excessive cost of steel bridge construction. For the economical and efficient manufacture of diaphragm manholes, it is necessary to study the exact behavior of the diaphragm manhole in a steel box girder bridge. In this study, both an experimental test and a structural analysis are performed to verify the behavior of the diaphragm manhole in a steel box girder bridge. A detailed structural analysis was performed according to various diaphragm manhole shapes, and in conclusion, the suitable reinforcement method for the support of diaphragm manholes in steel box bridges is presented.

An Experimental Study for Estimation of Effective Temperature for Design in Steel Box Girder Bridge (강박스거더교의 설계 유효온도 산정을 위한 실험적 연구)

  • Lee, Seong Haeng;Shin, Hyo Kyoung;Kim, Kyoung Nam;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.6
    • /
    • pp.449-458
    • /
    • 2016
  • The temperature data were measured for two years in a bridge specimen and the bridge in service nearby in order to calculate the effective temperature for thermal loads in steel box girder bridge. The maximum and minimum effective temperatures were calculated in the bridge specimen and the bridge according to air temperature in 2014, 2015 and 2years. The effective temperatures calculated in this study were compared the Euro code and the Highway Bridge Design Criteria. The coefficients of determination in the maximum effective temperature and the Euro code for 2 year were calculated from R = 0.927, R = 0.894 in a bridge specimen and the bridge respectively. Those of minimum temperature and the Euro code were analyzed from R = 0.992, R = 0.813 in two bridge respectively. Also, the results were evaluated as being very similar, or slightly increased as compared with the maximum temperature of the Korean Highway Bridge Design Code(Limit State Design).

An Experimental Study on the Stress Distribution in Steel Box Girder Bridge (강박스거더교의 응력분배 거동에 관한 실측연구)

  • Lee, Seong Haeng;Kim, Kyoung Nam;Son, Young Sang;Park, Tae Gyun;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.1
    • /
    • pp.9-20
    • /
    • 2008
  • It is important to increase the economy and efficiency of the diaphragm of the steel box girder bridge design. In this study, an experimental test is performed in a 4-span steel box girder bridge, which was under constructed according to the dead load of slab concrete and vehicle load. The test result is analyzed to verify the stress distribution of the diaphragm and the middle span. Next, stresses on the vertical stiffener are analyzed according to height. Stresses on the diaphragm with equal height are arranged respectively. Also, the stress distribution of the diaphragm and the middle span. Next, stress on the vertical stiffeners are analyzed according to height. Stresses on the diaphragm with equal height are arranged respectively. Also, the vertical stiffeners in the diaphragm was studied, and using the analyzed results, the proper length of the ratio of vehicle load with curing concrete to vehicle load with asphalt is calculated in each part of the steel box girder bridge. The results provide data that serve as basis for an economical and efficient design for the steel box girder bridge diaphragm.

Computation and Verification of Approximate Construction cost of Steel Box Girder Bridge by Using Case-Based Reasoning (사례기반추론을 이용한 강박스거더교의 개략공사비 산정 및 검증)

  • Jung, Min-Sun;Kyung, Kab-Soo;Jeon, Eun-Kyoung;Kwon, Soon-Cheol
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.5
    • /
    • pp.557-568
    • /
    • 2011
  • To effectively come up with and secure a national budget, it is very important to estimate the reasonable construction cost of each step in public construction projects. In this study, the approximate construction cost of a steel box girder bridge in the early stages of the project, on which available information is limited, was proposed using case-based reasoning. In addition, construction cost estimation models were used for existing sample design models, and the accuracy of the estimation model for the presented cost was verified. The analysis results showed that the error rate was comparatively stable. Therefore, it is expected that construction cost estimation will be effectively suggested in the country's budget preparation.

Landscape Preference over Single-Spaned Steel Box Girder Bridge by Bridge Shape Parameters (단경간 강박스거더교의 교량형상계수별 경관선호도 분석에 관한 연구)

  • Kim, Rak-Gi;Geum, Gi-Jeong;Yang, Gye-Seung;Im, Seong-Bin
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.2 s.88
    • /
    • pp.7-18
    • /
    • 2006
  • The Purpose of this study is to develop landscape Preference and define elements of difference in landscape preference of the 1-span Steel Box Girder Bridge by Bridge Shape Parameters(BSP) through Design of Experiments. Lately, the 1-span Steel Box Girder Bridge is dominations much component ratio and the Steel Box Girder Bridge has strong Points that is economically Profitable and management has easy when construct. but landscape preference of the 1-span Steel Box Girder Bridge was evaluated low because impression of landscape is being surfeited and dulled. Do to consider optimization in design that give change to Bridge Shape Parameters(BSP) to supplement this shortcoming in this study. Therefore, this study changes Bridge Shape Parameters(BSP) and extract elements that influence in landscape preference of the 1-span Steel Box Girder Bridge. and based on the design that consider landscape Preference of the 1-span Steel Box Girder Bridge, some essential guidelines for rational design of the 1-span Steel Box Girder Bridge suggested.

Design Improvements for Crossbeams and Stringers of Steel Box Girder Bridge (강박스거더교 가로보와 세로보 합리화 연구)

  • Gil, Heungbae;Kang, Sang Gyu;Cho, Jun Sang
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2008
  • This research carried out to optimize crossbeams and stringers of steel box girder bridges, which are parts of floor system and support loading from the bridge deck. In the current design practice, the crossbeam is densely deployed with a spacing of 6 meters, and the stringer is placed between the crossbeams. The crossbeams and stringer are connected to the deck through slab anchors but the allowable stress of the compression flange is determined by the lateral-torsional buckling. To increase economic efficiency of the steel box girder bridges. the increased spacing of the crossbeam was studied. The study shows that the spacing can be increased up to 10 meters. However, higher strength steel plates are necessary. Shear studs rather than slab anchors are also recommended to prevent lateral-torsional buckling strength of the crossbeams and stringer.

Suggestion and Verification of Assessment model on Construction Cost of Steel Box Girder Bridge in Project Performance Phases (사업 수행 단계별 강박스거더교 공사비 산정 모델 제시 및 검증)

  • Jeon, Eun-Kyoung;Kyung, Kab-Soo;Park, Jin-Eun;Kang, Sin-Hwa
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.1
    • /
    • pp.55-65
    • /
    • 2010
  • To effectively secure and execute the national budget, it is very important to estimate the reasonable construction cost of each process in the construction of public facilities and works. The construction cost is generally estimated at the time when the design of the targeted structures has been completed. Without detailed sectional drawings and with only simple information on bridge structures in the planning stage or in the early design stage. it would be very difficult to predict the approximate construction cost. In this study, a more efficient and appropriate approximate construction cost estimation model in the planning stage and in the early design stage is presented and verified as reliable by analyzing the construction cost data of 61 existing steel box girder bridges from previous studies. The results of this study show that when the construction cost that was predicted using the construction cost estimation model in the design stage was compared with the cost from the conventional standards, the suggested model in this study produced results with a very high confidence level.

LRFD Design and Reliability Level Estimation of a Steel Closed-Box Girder Bridge (폐단면 강박스거더교의 LRFD 설계와 신뢰성수준 평가)

  • Huh, Jung-Won;Yun, Dong-Geon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.2
    • /
    • pp.217-225
    • /
    • 2010
  • Most of the steel bridges in Korea are being currently designed by the allowable stress design method that uses the conventional deterministic factors of safety. However the limit state design based on the concept of probability, statistics and reliability engineering is becoming very popular as a global standard deign method, leading the rational and economic bridge design. As part of the fundamental research to establish the load and resistance factor design(LRFD) of steel bridges considering domestic environmental conditions and regional characteristics, an experimental design is conducted by applying AASHTO-LRFD specification especially to a steel closed-box girder, which occupies relatively a large portion of steel bridges in Korea. Throughout the experimental design according to various sectional changes, some of the issues to be considered in the LRFD design of a composite steel closed-box girder bridge are examined. In this process, an Excel-based design verification program is developed for easy computation and prevention of errors. Quantitative reliability levels of the bridge sections designed by LRFD are also estimated using a reliability analysis method, and compared with the target reliability indexes applied in the LRFD design to verify the validity of the procedure and methodology used in this study.

Damage Assessment of Steel Box-girder Bridge using Neural Networks (신경망을 이용한 강박스거더교의 손상평가)

  • Lee, In Won;Oh, Ju Won;Park, Sun Kyu;Kim, Ju Tae
    • Journal of Korean Society of Steel Construction
    • /
    • v.11 no.1 s.38
    • /
    • pp.79-88
    • /
    • 1999
  • Damages of a steel box girder bridge are detected using neural networks. Damage detection using neural networks has increasing momentum in structural engineering. It is a new effort to overcome the limitations of the conventional analytical approaches and applied to the damage detection of a steel box-girder bridge. Data sets for training neural networks are obtained from the acceleration response of the bridge under moving load. Finite element model is first defined and damages of 5, 10, 15 and 20% are assumed in the model. Not only the trained damages but untrained damages are detected in the assessment stage. The untrained damages can be detected with acceptable errors. Because the number of damaged locations are limited to a few parts, more researches are needed to put this technique into practice.

  • PDF

Current Status and Analysis of PSC Bridge in Korea (국내 프리스트레스트 콘크리트 교량 현황조사 및 분석)

  • Son, Hyeok-Soo;Oh, Myung-Seok;Yoon, Cheol-Kyun;Kim, Ik-Su;Kim, Jin-Woo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.23-24
    • /
    • 2010
  • In this research, the comparison and analysis of domestic prestressed concrete bridges were performed with major variations of superstructure type, and span lengths using the 'current status of roadbridge and tunnel' informations provided by MLTM and STATISTICS KOREA. As a result of analysis, steel box girder bridges with 50~100m span length represent about 76% of bridges, but prestressed concrete bridges represent a relatively smaller percentage. In order to replace steel box girder bridges with prestressed concrete bridges, it is necessary to develop prestressed concrete bridges with high-strength tendons and concrete.

  • PDF