• Title/Summary/Keyword: 갑문

Search Result 196, Processing Time 0.03 seconds

Analysis of the Discharge Capacity Improvement of a Lock Gate by Using 3-Dimensional Numerical Simulation (3차원 수치모의를 이용한 배수갑문의 방류능력 개선효과 분석)

  • Kim, Nam-Il;Kim, Dae-Geun;Lee, Kil-Seong;Kim, Dal-Sun
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.3 s.152
    • /
    • pp.189-198
    • /
    • 2005
  • This study showed that numerical simulation can be effectively used to analyze discharge capacity according to the form and arrangement of the lock gate of a tidal power plant. For the numerical simulation, FLOW-3D with Reynolds-averaged Navier-Stokes equation as a governing equation was used. This study found that improvement of apron length and approach angle of guide wall of the lock gate causes differences in discharge capacity of $10\%$ or more. In addition, there was a difference of discharge capacity caused by the connecting structures of the drainage gate and hydraulic turbine structure and the side slope at the end of apron. This study also showed that hydraulic investigation to enhance a discharge capacity is needed when the lock gate is designed and that numerical model experiments can be a useful analysis tool to design the drainage structure, as well as the hydraulic model experiment.

A Method Study on Discharge Computation of Backwater effect station by Handle of Gate of a Geumgang estuary dyke (금강하구둑 갑문조작에 의한 배수영향 지점에서의 유량산정 방법 연구)

  • Lee, Chung-Dae;Han, Hak-Young;Lim, Tae-Eun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1307-1311
    • /
    • 2010
  • 수자원의 효율적인 관리를 위해서는 홍수량 자료뿐만 아니라 저 평수량의 자료도 매우 중요하며, 이는 최근의 가뭄 발생으로 인하여 용수공급 및 하천수질관리 문제에서 저수위 유량자료의 파악이 중요한 관심 대상이기 때문이다. 이를 위해서는 저수위에 대해 유량측정을 실시하여 유량자료를 확보해야 하며, 이와 더불어 연속적인 유량자료를 얻기 위해서는 신뢰성 있는 수위-유량관계곡선식이 필수적이다. 일반적으로 자연하천에서 수위-유량관계는 수위의 상승 및 하강에 따라 유량변화가 일정한 경향성을 가지고 변동을 하기 때문에 단일함수 관계로 설명이 가능하다. 하지만 갑문 조작에 영향을 받는 구간에서는 수위와 유량만의 단일함수 관계가 아닌 갑문의 개 폐에 따라 수위와 유량이 변동하는 특성을 가지고 있어 일반하천에 비해 수위-유량관계를 규명하는 것이 매우 어려운 문제이다. 본 연구는 금강 하구둑의 갑문조작에 의하여 배수영향을 받는 규암 수위관측소에 대하여 수위-하강고-유량관계를 이용한 유량환산방법, 수면경사를 매개변수로 추가한 다중 회귀식 개발, 자동유량측정 장치를 이용한 유속지수법, 기존 수위-유량관계곡선식을 이용한 유량환산, ADCP(Acoustic Doppler Current Profiler)를 이용한 유량측정성과에 대하여 비교 분석을 통하여 갑문조작에 의한 배수영향을 받는 지점의 안정적인 유량자료를 제공하는데 목적이 있다. 이와 같이 각 유량환산 방법에 따라 실측 유량과 환산유량 비교의 결과 수위-하강고 유량관계의 경우 평균 26.60%, 기존 수위-유량관계곡선의 경우 130.29%, 유속지수법의 경우 36.48%, 다중회귀식의 경우 24.65%의 상대오차가 발생하였다.

  • PDF

Estimation of Gate Discharge Capacity by Physical Model Test and FLOW-3D (수리모형실험과 FLOW-3D를 이용한 배수갑문 통수능력 검토)

  • Park, Byong-Jun;Lee, Sang-Hwa
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.20 no.2
    • /
    • pp.168-175
    • /
    • 2008
  • In this study, we estimated the discharge capacity of Solicheon sluice gate in Gunjang national industrial complex by hydraulic physical scale model test and FLOW-3D. It was showed that the discharge capacity of gate carried by physical model test and numerical analysis was similar.

Development of the Automatic Design System for Hydraulic Gate (취수 갑문 설계 자동화 개발)

  • Lee, Hoo-Gwang;Choi, Jae-Seung;Hwang, Suk-Hwan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.6
    • /
    • pp.127-132
    • /
    • 2001
  • An automatic design system for a hydraulic gate has been developed to cut down the time for the design calculation and to optimize its design. It is oriented to the radial gate which is the simplest, most reliable, least expensive and most widely used hydraulic gate. This system is composed of data input, strength computation and result display modules with databases of the properties of components and materials. In this development, the existing intricate design procedure has been changed to the straightforward procedure without assumption of weight. With this code, the design time of the radial gate could be reduced below one thirtieth in comparison with manual work and the optimum design could be accomplished easily.

  • PDF

Feasibility of Choryeong Tunnel and Han River Section in Kyungbu Canal (경부운하 한강구간 및 조령터널의 입지 타당성분석)

  • 정태웅
    • The Journal of Engineering Geology
    • /
    • v.7 no.1
    • /
    • pp.1-10
    • /
    • 1997
  • The construction of Kyungbu canal connecting Han and Naktong rivers is needed to facilitate the carriage of goods and enhance the economic growth. The two rivers are liflked by the Choryeong tunnel with 20.5 km length and 125 m altitude. Seven locks involving of 25 m lifting height are planned to reach the tunnel from Shingok dam along the Han river. The tunnel and dams are located favorably by topographic and geologic map analysis. The water needed to fill the chamber of high lock will he supplied by construction of additional dams above Chungju-dam and/or intmduction of water-saving lock system.

  • PDF

Evaluation for Determination of Optimum Size in Drainage Lock Gate (배수갑문 최적 규모 결정 검토)

  • Oh, Ji-Eun;Lee, Tae-Woo;Jung, Tae-Hwa;Lee, Jong-Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.855-859
    • /
    • 2010
  • 우리나라는 국토면적이 작고 인구밀도가 높기 때문에 간척지를 조성해 농경지 및 대규모 공단으로 개발하여 사용하고 있다. 특히 서해안 지역은 조수간만의 차가 크지만 지형학적으로 간척지 개발의 적지가 많아 현재까지 방조제 설치가 가장 많이 이루어지고 있다. 그러나 방조제 설치 후, 호내 매립은 홍수위 및 홍수유출량의 급변으로 인해 외수위 변화에 따른 유출 배제 가능량을 재산정하여야 한다. 본 연구에서는 설계 홍수량, 시간별 외조위조건 그리고 유수지용량 등의 분석을 통하여 유역에서 홍수 발생 시 즉각적으로 대처할 수 있는 홍수배제용 배수갑문의 최적 규모를 결정하는 것이 목적이다.

  • PDF

Simulation of Water Quality Changes in the Saemangeum Reservoir Induced by Dike Completion (방조제 완공에 따른 호내부 수질변화 모의)

  • Suh, Seung-Won;Lee, Hwa-Young;Yoo, Sang-Cheol
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.22 no.4
    • /
    • pp.258-271
    • /
    • 2010
  • In order to figure out hydrodynamic and water quality changes after completion of dike construction of the Saemangeum, which behaves as a semi-enclosed estuarine lake, numerical simulations based on fine grid structure by using EFDC were intensively carried out. In this study some limitations of precedent study has been improved and gate operation were considered. Also 3 phases such as air-water-sediment interaction modeling was considered. It is clear that inner mixing of the Saemangeum is dominated by Mankyeong and Dongjin riverine discharges rather than the gate opening influence through the Lagrangian particle tracking simulations. Vertical DO structure after the dike completion shows steep gradient especially at Dongjin river estuary due to lessen of outer sea water exchange. Increasing SOD at stagnantly changed man-made reservoir might cause oxygen deficiency and accelerating degradation of water quality. According to TSI evaluation test representing eutrophication status, it shows high possibility of eutrophication along Mankyeong waterway in spite of dike completion, while the index is getting high after final closing along Dongjin waterway. Numerical tests with gate operations show significant differences in water quality. Thus it should be noted that proper gate operation plays a major role in preserving target water quality and management for inner development plan.

Estimation for Changing of Hydraulic States Caused by Gate Expansion in Asan Bay (아산만 배수갑문 확장사업에 따른 아산만 해역의 수리특성 변화 검토)

  • Park, Byong-Jun;Song, Hyun-Ku;Song, Tae-Kwan;Jang, Eun-Chul
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.337-340
    • /
    • 2008
  • The gate expansion was planed to increase discharge capacity of gate structure at sea dike in Asan Bay. So it was estimated for changing of hydraulic states in Pyeongteak Harbor Zone caused by gate expansion, by 2D and 3D CFD Module. In result, influence of gate expansion was less than tidal current and discharge ratio between old gate and new gate was 4:6.

  • PDF

금강 하구역 부유 물질의 계절 변화

  • 최용규;황선도;김종식
    • Proceedings of the Korean Society of Fisheries Technology Conference
    • /
    • 2000.05a
    • /
    • pp.190-191
    • /
    • 2000
  • 금강은 전라북도 진안에서부터 군산 하구에 이르는 남한 4대강의 하나로써, 총 연장이 약 400km에 이르며, 집수 면적은 약 9,880$\textrm{km}^2$이다. 금강 하구에는 1988년 군산과 장항을 연결하는 총 1,841m의 금강 하구언이 건설되었다. 그러나 금강 하구언은 하구폭의 절반에 해당하는 수문은 개방해 두었다가, 1994년 8월에 배수 갑문을 닫았으며, 이후로 갑문 작동이 가동되어 산업 용수의 확보와 더불어 홍수 조절을 하게되었다(Yang and Hur, 1998). (중략)

  • PDF