• Title/Summary/Keyword: 감리자

Search Result 114, Processing Time 0.028 seconds

Process Improvements for Reducing Apartment Defects after Completion (준공후 아파트 하자 저감을 위한 절차개선 방안 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.355-361
    • /
    • 2018
  • Many defects are occurring in apartments, the main residential area in Korea. This is due to a lack of construction skills and a lack of management. As many apartments are provided to buyers, the dispute over defects after completion is increasing rapidly. The Housing Act was amended so that local governments could order contractors to repair defects. However, even if defects are resolved after a defect is generated, it is not a fundamental solution that can be satisfied because buyers have to endure the pain caused by the defect. So, it is necessary to protect the interests of buyers by fundamentally reducing defects in apartments. Therefore, in this study, it was suggested that the asymmetry of the information about the apartment buyers should be resolved at the time of sale of the apartment, the final drawings should be a contract document, the review period of the apartment house supervision should be secured, the appropriate supervisory fee should be secured at the time of contract change and the payment procedure should be improved.

Information System Audit Improvement Plan in Requirements Engineering-based Quality Assurance and Project Management (요구공학 기반 품질보증 및 프로젝트 관리에서의 정보시스템 감리 개선 방안)

  • Jung Chul, Shin;Dong Soo, Kim;Hee Wan, Kim
    • Journal of Service Research and Studies
    • /
    • v.11 no.1
    • /
    • pp.45-58
    • /
    • 2021
  • Requirements engineering can be seen as proceeding with various processes and activities such as extraction, analysis, specification, management, and verification without temporal and spatial constraints in the development environment of information systems that are becoming large and decentralized. Developing requirements well and conducting continuous evaluation and management is the shortcut to success in project management, and it is recognized as a very important matter in relation to requirements in the information system audit. When we conduct information system audit and conducting projects subject to audit, we need to improve the required engineering aspect. Therefore, this study derives inspection items suitable for the target project by referring to the audit inspection manual and audit inspection guide when conducting the current audit, and relates to the required engineering aspect among the contents of the inspection guide for each business type that is the basis for deriving the inspection items were derived for each audit point/audit area for the project management and quality assurance project type corresponding to the inspection items. The suitability of the extracted occupation items was verified through a questionnaire survey by experts.

Analysis of Ambivalence Differences among Groups for Temporary Firefighting Facilities of Workers at Construction Sites (공사현장 근로자의 임시소방시설에 대한 집단 간 Ambivalence 차이분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.765-778
    • /
    • 2021
  • The purpose of this study is to prevent fire accidents in advance by deriving prior knowledge among groups about temporary fire-fighting facilities of workers at construction sites and devising appropriate improvement measures. The findings are as follows.First, in the case of fire extinguishers, statistical attention was paid to the contractor, supervisor, partner worker and fire extinguisher manager between designations. 87% of fire managers and 70% of facility supervisors said fire extinguisher management managers needed to be designated for each type of construction, which requires designation of fire extinguisher management managers, frequently checking and relocating. Second, in the case of simple fire extinguishing facilities, statistical attention was paid to the application of penalties for unauthorized use of fire extinguishing facilities with construction companies, supervisors, and business partners.Third, in the case of emergency alarm measures, statistical attention was paid to the application of emergency alarm sound to temporary broadcasting facilities with construction works, supervisors, and business partners.Fourth, in the case of induction, statistical attention was paid to the application of connection between construction works, supervisors, and partner workers, such as passage guidance, emergency lighting, etc.It was found that 65% of construction workers and 55% of electrical workers had different applications such as aisle guidance and emergency lighting for each type of business partner. In order to resolve blind spots such as evacuation zone guidance due to the structure of the building, it is necessary to easily distinguish the direction of the entrance door from a long distance by applying it in conjunction with passage guidance lights and emergency lighting.

A study on the penetration of the builing fire compartment (방화구획 관통부에 관한 연구)

  • Park, Jong-Jin;Yoon, Myong-O
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.10a
    • /
    • pp.37-41
    • /
    • 2010
  • 스프링클러설비와 방화구획 구성요소는 화재시 매우 중요한 역할을 한다. 그러나 기존에 15층이하 아파트는 스프링클러설비가 없어 화재시 방화구획에 의존해야 되는데 방화구획 관련 설계, 시공, 감리가 미비하여 화재에 쉽게 노출되어 있다. 설비슬리브, 전선관, 덕트등이 방화구획으로 되어 있는 부분을 관통하는 경우 그틈을 시멘트모르타르나 기타 불연재료로 메우도록 규정하고 있으나 화재발생시 관통부를 메운 재료의 내화성능 부실, 균열, 탈락 등으로 화재안전성이 떨어진다. 현장에서의 설계, 시공, 감리등 대응하는 자세가 너무 허술하다. 설계에 방화댐퍼, 관통부 틈새의 내용이 반영 되지 않고 건축, 기계, 전기, 통신, 소방등 각 분야의 허가 도면에 도장이 날인되어 나타난다. 시공자는 잘못된 설계도면을 가지고 허가 도면이라며 도면되로 시공한다. 또한 실리콘, 우레탄폼등을 방화구획 관통부 틈새에 주입하며, 작업자도 비숙련자로서 개념도 없이 방화용실란트와 우레탄폼을 혼용해가며 작업을 한다.

  • PDF

A Study on the Regulation of Blasting Noise at Home and Abroad (국내외 발파소음 규제에 대한 연구)

  • Oh, Ki-Taek
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.89-90
    • /
    • 2023
  • 대단위 건축물 및 구조물 철거작업시 철거사업 참여 주체인 발주자, 감리자, 시공자 및 근로자등의 안전사고 예방을 위한 사전 위험성평가 및 안전대책 수립, 수립된 안전대책 이행에 대한 역할이 매우 중요하다. 건축물 및 구조물 철거작업 공법은 인력철거공법 및 장비철거공법, 발파철거공법으로 구분되며 발파철거공법 적용시 발생되는 소음 및 진동을 계측하여 환경규제 기준내로 준수해야 한다. 본 연구는 발파공업에 의한 철거작업시 국내·외 소음 규제치 비교를 통해 국내의 발파공법에 의한 소음 규제치를 합리적으로 조정하여 건축물 및 구조물의 철거작업시 발파공업의 채택이 활성화 되기를 기대한다.

  • PDF

안전소식

  • korea construction safety engineering association
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.15
    • /
    • pp.69-76
    • /
    • 1995
  • PDF

현장탐방 - 마포 석유비축기지

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.323
    • /
    • pp.56-59
    • /
    • 2017
  • 서울특별시회는 지난 4월 13일 서울시 도시기반시설본부와 합동으로 (주)동보엔지니어링이 시공 중인 '마포석유비축기지 재생 및 공원조성 기계설비공사' 현장을 방문하여 안전 및 품질점검을 실시했다. 이날 품질점검에는 발주처인 서울시 도시기반시설본부 관계자를 비롯하여 감리단장, 기계감리 등이 참석하여 시공현황을 체크했다. 서울시회 김수철 상임부회장은 (주)동보엔지니어링 정광일 대표와 김원근 현장소장에게 "다른 현장보다도 더욱 우수한 공사품질과 체계적인 현장관리, 타 공중간의 소통에 의한 긴밀한 업무협조로 준공까지 공사 진행에 차질이 없도록 솔선수범하여 우수 시공사례 현장이 될 수 있도록 심혈을 기울여 달라"고 부탁했다.

  • PDF

전기설비의 계획과 설계 및 설계감리

  • 이선형
    • Electric Engineers Magazine
    • /
    • v.199 no.3
    • /
    • pp.38-43
    • /
    • 1999
  • 전력시설물의 설계를 검토하자면 무엇보다도 광범위한 지식과 다양한 경험이 요구된다. 그리고 설계의 진행방법과 설계자의 개성적인 판단에 따라서 여러 가지 방법으로 설계될 수 있기 때문에 설계도서를 검토한다는 것은 설계자의 의도와 건축주 또는 발주자의 요구를 구체적으로 파악하는 것이 선행되어야 하며 다음으로 기초적인 학문 및 이론과 응용기술을 구사하여 그것을 어떻게 현장여건과 맞게 마무리 짖느냐 하는데에 있다.

  • PDF