• Title/Summary/Keyword: 간접공사비

Search Result 17, Processing Time 0.024 seconds

A Case Study on Construction Cost Comparison for On-Site Construction and Off-Site Construction of Plant Project (플랜트 건설의 현장시공 및 모듈시공에 대한 공사비 비교 사례연구 - Pipe Rack을 대상으로 공사비 산정 -)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.25-34
    • /
    • 2023
  • The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.

시설공사가격관리자료

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.6 s.195
    • /
    • pp.83-87
    • /
    • 1985
  • 본 시설공사 가격관리 자료는 '84년도 조달청 시설국이 발주한 공사중 표준가격으로 활용할 수 있는 수준의 건축공사를 발췌하여 이를 비목별,공종별 단위당 공사비와 건물유형별로 중요자재 소요량 및 소요품수 등을 분석한 것입니다. 따라서 회원 여러분께서 본 자료를 잘 활용하면 건물종류별로 우리 실정에 알맞는 표준 건축물의 기준 자료로 이용할 수 있으며 또한 건축물의 과도한 고급화를 억제하여 예산을 절감하는 등 공사비 단가 간접통제 수단이 될 수도 있을 것입니다. 공사집행부서는 본 자료를 시설공사 계획 단계부터 발주, 시공 과정에 이르기까지 관리자료로 활용하시기 바라며 조달청에서는 본 자료를 각 수요기관이 계약요청하는 공사에 대하여 공사비 단가를 비교 평가하는 자료로 활용할 것입니다.

  • PDF

Analysis of the Productivity and Indirect Cost Rates Estimation in the Steel Plant (철골 공장가공의 생산성 및 공장간접비율 실태분석)

  • Kim, Kyoung-Won;Ahn, Bang-Ryul;Tae, Yong-Ho;Huh, Young-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.333-336
    • /
    • 2012
  • In modern Construction Industry, as accumulation of capital and improvement of technology skills, buildings are becoming higher and more enormous, also the portion of steel works has been increasing. In addition, it is necessary to predict the optimum level of construction cost in a reasonable way. The composition of construction is direct construction cost, indirect construction cost and so on. However, it is not enough to study about indirect construction cost rather than direct construction cost. In this study, the state of productivity and indirect construction cost are analyzed in the steel production. As a result, the productivity and ratio of indirect cost in steel plant by inserted per 1ton are suggested.

  • PDF

Improvement of Construction Cost Index against the Change of National Basic Statistic (국가 기초 통계자료 환경변화에 따른 건설공사비지수 개선)

  • Kang, Taikyung;Baek, Seung-Ho;Kim, Chang-Won;Cho, Hunhee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.21-29
    • /
    • 2015
  • Construction cost index (CCI) has been published for last 10 years, it's contributed to update the historical cost data, analysis cost fluctuation and evaluate the market price for construction works with direct or indirect manner. CCI is a secondary or processed statistics using the basic statistics of input output table (IO table) and producer price index (PPI) from the Bank of Korea (BOK). So once the basic statistics change, it is required to modify the calculating model of CCI. Recently the BOK changed some fundamental principles and the base year (from 2005 to 2010), that can be used in IO table and PPI. This research analyzed the recent revision of basic statistics and their impacts on CCI, and improved the previous CCI model in response to it. Also the validity of new CCI was verified by analyzing the items and weights utilized in CCI and comparing the related index.

A study on the effective operation&selection of the BTL project (BTL사업자의 효율적인 선정 및 운영에 관한 연구)

  • Kim, Kyung-Suk;Choi, Moon-Bok;Cho, Young-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.599-602
    • /
    • 2007
  • To enhance the competition of National power, the investment of SOC is an essential factor for infrastructure construction. The capital for SOC is so gigantic and the national finance is limited, engagement of various subject is necessary. So, Government is promoting the private sector to invest capital in SOC development. Nevertheless the increasement of SOC investment, various problems were issued in selection & operation of BTL. Therefore, to raise the probability of success for BTL project, escalation, unification and specialization of BTL affairs, BTL selection process were suggested in this study.

  • PDF

Economic Feasibility Analysis of a Tunnel Section Enlargement Method That Does Not Halt Traffic Flow (교통류 보존형 터널단면 확대 시공기술의 경제적 타당성 분석)

  • Lee, Seung Soo;Kim, Dong-Gyou;Seo, Jong Won
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.459-472
    • /
    • 2015
  • A recently developed tunnel section enlargement method can maintain traffic flow during construction by using a protector. By keeping traffic flowing, it can minimize the lost time and costs associated with diversions and also the accompanying environmental pollution. On the other hand, installing the protector can lengthen the construction period and increase the direct cost. This paper presents a method for analyzing the economic feasibility of tunnel section enlargement methods considering the direct construction cost and the indirect social cost. The indirect costs are divided into categories of: vehicle driving cost, travel time delay cost, and environmental pollution cost. The economic efficiency of existing technology is compared with the new method in an case study of Namsan Tunnel 3.

A Study on the Indirect Benefits of Undergrounding Overhead Power Line Projects in an Urban Area Using Contingent Valuation Method (조건부가치측정법(CVM)을 이용한 도심지 송전선로 지중화사업의 간접편익 추정)

  • Park, Chan-Ho;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.871-879
    • /
    • 2008
  • Recently, as there are a rise in the standard of living and higher concerns of an electromagnetic wave and environment, undergrounding the aerial cables which are supported by large pylons and generally considered as the least attractive feature of an urban area is on an increasing trend to improve aesthetic benefits and electric reliability. This study applied Contingent Valuation Method (CVM) which is expected to become an effective tool to measure indirect benefit to estimate the substantial benefits of undergrounding overhead power line projects in an urban area. The tunneling construction project of the 345kV Shinsungnam electric power cable in Seongnam city was selected and a hypothetical scenario was given to respondents to determine their levels of Willingness to Pay (WTP) for undergrounding overhead power lines. The result from the estimation of the WTP of undergrounding overhead power lines in Seongnam city was calculated as approximately 17.1 billion won. Placing existing overhead lines underground is difficult to justify economically. Most undergrounding costs appear to be justified by aesthetic and public policy considerations. Therefore, considering the result of this study, undergrounding overhead power lines is of great benefit to public.

Time Series Analysis and Development of Forecasting Model in Apartment House Cost Using X-12 ARIMA (X-12 ARIMA를 이용한 아파트 원가의 변동분석 및 예측모델 개발)

  • Cho, Hun-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.98-106
    • /
    • 2005
  • The construction cost index and the forecasting model of apartment house can be efficient for evaluating the validness of the fluctuating price, and for making guidelines for construction firms when calculating their profit. In this study the previous construction cost index of apartment house was improved, and the forecasting model based on X-12 ARIMA was developed. According to the result, during the last five years the construction cost, excluding labor expense, has risen approximately to 22.7%. And during next three years, additional 16.8% rise of construction cost is expected. Those quantitative results can be utilized for evaluating the apartment house's selling price in an indirection, and be helpful to understand the variation pattern of the price.

Estimation method of Overhead Costs for Historical Costs Estimation System of the Electrical Construction Works in Korea (국내 전기공사 분야 실적공사비 적산제도 도입시 간접공사경비의 산정방안)

  • Sohn, H.K.;Lee, H.K.;Park, M.Y.;Park, I.P.;Kwon, Y.M.;Seo, S.S.;Kim, K.G.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2004.05b
    • /
    • pp.148-151
    • /
    • 2004
  • When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system fur building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is supposed to reasonable estimation methods of overhead costs and profits.

  • PDF