• Title/Summary/Keyword: *-derivation

Search Result 2,169, Processing Time 0.028 seconds

Design of Operation Management Check Items of Efficient Information System for Improvement of Business Continuity based on ISO 22301 (ISO22301 기반 비지니스 연속성 증대를 위한 효율적인 정보시스템 운영감리 점검항목 설계)

  • Joo, Nak Wan;Kim, Dong Soo;Kim, Hee Wan
    • Journal of Service Research and Studies
    • /
    • v.9 no.2
    • /
    • pp.31-40
    • /
    • 2019
  • In this paper, we have studied the improvement of operational control for the enhancement of business continuity of information system becoming more important with the development of information technology such as big data, Iot, and artificial intelligence. The operational management and audit guidance of the current information system, which is coming in the fourth industrial age, where various services, data and industries are converged, is based on the existing general information system pattern and needs to be improved. The provision of services at fixed times is linked to the survival of enterprises and countries and serves as a key element. Therefore, it is necessary to study the application of optimized check items of the operation audits to minimize the service interruption damage of the information system and to provide the stable service in terms of business continuity management. To accomplish this, the check items presented in the operational control of the information system were derived by combining the PDCA step contents and 8 resource requirements provided in ISO 22301. From the point of view of increasing the business continuity according to the derivation criteria of the inspection items, the operational inspection check items were derived by exemplifying the improved check items and review items of the information system operation audit and the products to be checked during the operational audit. The check items were divided into management audit improvement check items for service continuity management, and operational audit improvement check items for performance and availability management. The average score of the IT professionals' survey on the suitability of the proposed checklist was 4.63, which was concluded to be appropriate.

Optimal parameter derivation for Muskingum method in consideration of lateral inflow and travel time (측방유입유량 및 유하시간을 고려한 Muskingum 최적 매개변수 도출)

  • Kim, Sang Ho;Kim, Ji-sung;Lee, Chang Hee
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.12
    • /
    • pp.827-836
    • /
    • 2017
  • The most important parameters of the Muskingum method, widely used in hydrologic river routing, are the storage coefficient and the weighting factor. The Muskingum method does not consider the lateral inflow from the upstream to the downstream, but the lateral inflow actually occurs due to the rainfall on the watershed. As a result, it is very difficult to estimate the storage coefficient and the weighting factor by using the actual data of upstream and downstream. In this study, the flow without the lateral inflow was calculated from the river flow through the hydraulic flood routing by using the HEC-RAS one-dimensional unsteady flow model, and the method of the storage coefficient and the weighting factor calculation is presented. Considering that the storage coefficient relates to the travel time, the empirical travel time formulas used in the establishment of the domestic river basin plan were applied as the storage coefficient, and the simulation results were compared and analyzed. Finally, we have developed a formula for calculating the travel time considering the flow rate, and proposed a method to perform flood routing by updating the travel time according to the inflow change. The rise and fall process of the flow rate, the peak flow rate, and the peak time are well simulated when the travel time in consideration of the flow rate is applied as the storage coefficient.

The Rearch Of Method in the Appropriate number of Demand and Supply of OMD (한의사인력(韓醫師人力) 공급(供給)의 적정화방안(適定化方案) 연구(硏究))

  • Lee, Jong-Soo
    • The Journal of Korean Medicine
    • /
    • v.19 no.1
    • /
    • pp.299-326
    • /
    • 1998
  • 1. Comparison of demand and supply A. Assumption of estimation of demand and supply we will briefly assumptions used for presumption once more before comparing the result of estimation of demand and supply examined previously 1) supply - The average applying rate for state. examination of graduate: ${\alpha}$=1.03109 - The ratio of successful applicants of state examinations: ${\beta}$=0.97091 - Mortality classified by age : presumed data of the Bureau of statistics - Emigrating rate: 0 % - Time of retire: unconsidered - An army doctor number: unconsidered and regard number of employed oriental medicine doctor. - Standard of 1995 : The number of survival oriental medicine doctor is 8195. the number of employed oriental medicine doctor is 7419. 2) demand - derivated demand method Daily the average amount of medical treatment: according to medical insurance federation data. there is 16 or 6 non allowance patient, we consider amount of medical treatment as 22 persons in practical because 21.94 persons (founded practical examination) are converted to allowance in comming demand. Daily the proper amount of medical treatment: 7 hours form -35 persons 5 hours 30 minutes form -28 persons. Yearly medical treatment days: 229 days. 255 days. 269 days . Increasing rate of visiting hospital days: -1996 year. 1997 year. 1998 year- . Rate of applying insurance: yearly average 71.51% (among the investigated patient) B. Comparison of total sum result 1) supply (provision) Table Ⅳ-1 below shows the estimation of the oriental medicine doctor in the future.

  • PDF
  • Development of Runoff Hydrograph Model for the Derivation of Optimal Design Flood of Agricultural Hydraulic Structures(1) (농업수리구조물의 적정설계홍수량 유도를 위한 유출수문곡선모형의 개발(I))

    • 이순혁;박명근;맹승진
      • Magazine of the Korean Society of Agricultural Engineers
      • /
      • v.37 no.3_4
      • /
      • pp.34-47
      • /
      • 1995
    • It is experienced fact as a regular annual event that the structure to he designed on unreasonable flood for the agricultural structures including reservoirs have been brought not only loss of lives, but also enormous property damage. For the solution of this problem at issue, this study was conducted to develop an optimal runoff hydrograph model by comparison of the peak flows and time to peak between observed and simulated flows derived by linear time-invariant and linear time-variant models under the condition of having a short duration of heavy rainfall with uniform rainfall intensity at nine small watersheds which are within the range of 55.9 to 140.7 square kilometers in area in Han, Geum, Nagdong and Yeongsan Rivers. The results obtained through this study can be summarized as follows. 1. Storage constants and Gamma function arguments were calculated within the range of 1.2 to 6.42 and of 1.28 to 8.05 respectively by the moment method as the parameters for the analysis of runoff hydrograph based on linear time-invariant model. 2. Parameters for both linear time-invariant and linear time-variant models were calibrated with nine gaged watershed data, using a trial and error method. The resulting parameters including Gamma function argument, N and storage constant, K for linear time-invariant model were related statistically to watershed characteristic variables such as area, slope, length of main stream and the centroid length of the basin. 3. Average relative errors of the simulated peak discharge of calibrated runoff hydrographs by using linear time-variant and linear time-invariant models were shown to be 0.75 and 5.42 percent respectively to the peak of observed runoff hydrographs. Correlation coefficients for the statistical analysis in the same condition were shown to be 0.999 and 0.978 with a high significance respectively. Therefore, it can be concluded that the accuracy of a linear time-variant model is approaching more closely to the observed runoff hydrograph than that of a linear time-invariant model in the applied watersheds. 4. Average relative errors of the time to peak of calibrated runoff hydrographs by using linear time-variant and linear time-invariant models were shown to be 16.44 and 19.89 percent respectively to the time to peak of observed runoff hydrographs. Correlation coefficients in the same condition were also shown to be 0.999 and 0.886 with a high significance respectively. 5. It can be seen that the shape of simulated hydrograph based on a linear time- variant model is getting closer to the observed runoff hydrograph than that of a linear time-invariant model in the applied watersheds. 6. Two different models were verified with different rainfall-runoff events from data for the calibration by relative error and correlation analysis. Consequently, it can be generally concluded that verification results for the peak discharge and time to peak of simulated runoff hydrographs were in good agreement with those of calibrated runoff hydrographs.

    • PDF

    Development of Runoff Hydrograph Model for the Derivation of Optimal Design Flood of Agricultural Hydraulic Structures(II) (농업수리구조물의 적정설계홍수량 유도를 위한 유출수문곡선 모형의 개발(II))

    • 이순혁;박명근;맹승진
      • Magazine of the Korean Society of Agricultural Engineers
      • /
      • v.38 no.3
      • /
      • pp.112-126
      • /
      • 1996
    • This study was conducted to develop an optimal runoff bydrograph model by comparison of the peak discharge and time to peak between observed and simulated flows derived by four different models, that is, linear time-invariant, linear time-variant, nonlinear time-invariant and nonlinear time-variant models under the conditions of heavy rainfalls with regionally uniform rainfall intensity in short durations at nine small watersheds. The results obtained through this study can be summarized as follows. 1. Parameters for four models including linear time-invariant, linear time-variant, nonlinear time-invariant and nonlinear time-variant models were calibrated using a trial and error method with rainfall and runoff data for the applied watersheds. Regression analysis among parameters, rainfall and watershed characteristics were established for both linear time-invariant and nonlinear time-invariant models. 2. Correlation coefficients of the simulated peak discharge of calibrated runoff hydrographs by using four models were shown to be a high significant to the peak of observed runoff graphs. Especially, it can be concluded that the simulated peak discharge of a linear time-variant model is approaching more closely to the observed runoff hydrograph in comparison with those of three models in the applied watersheds. 3. Correlation coefficients of the simulated time to peak of calibrated runoff hydrographs by using a linear time-variant model were shown to be a high significant to the time to peak of observed runoff hydrographs than those of the other models. 4. The peak discharge and time to peak of simulated runoff hydrogaphs by using linear time-variant model are verified to be approached more closely to those of observed runoff hydrographs than those of three models in the applied watersheds. 5. It can be generally concluded that the shape of simulated hydrograph based on a linear time-variant model is getting closer to the observed runoff hydrograph than those of three models in the applied watersheds. 6. Simulated hydrographs using the nonlinear time-variant model which is based on more closely to the theoritical background of the natural runoff process are not closer to the observed runoff hydrographs in comparison with those of three models in the applied watersheds. Consequently, it is to be desired that futher study for the nonlinear time-variant model should be continued with verification using rainfall-runoff data of the other watersheds in addition to the review of analyical techniques.

    • PDF

    Detection of Individual Trees and Estimation of Mean Tree Height using Airborne LIDAR Data (항공 라이다데이터를 이용한 개별수목탐지 및 평균수고추정)

    • Hwang, Se-Ran;Lee, Mi-Jin;Lee, Im-Pyeong
      • Spatial Information Research
      • /
      • v.20 no.3
      • /
      • pp.27-38
      • /
      • 2012
    • As the necessity of forest conservation and management has been increased, various forest studies using LIDAR data have been actively performed. These studies often utilize the tree height as an important parameter to measure the forest quantitatively. This study thus attempt to apply two representative methods to estimate tree height from airborne LIDAR data and compare the results. The first method based on the detection of the individual trees using a local maximum filter estimates the number of trees, the position and heights of the individual trees, and the mean tree height. The other method estimates the maximum and mean tree height, and the crown mean height for each grid cell or the entire area from the canopy height model (CHM) and height histogram. In comparison with the field measurements, 76.6% of the individual trees are detected correctly; and the estimated heights of all trees and only conifer trees show the RMSE of 1.91m and 0.75m, respectively. The tree mean heights estimated from CHM retain about 1~2m RMSE, and the histogram method underestimates the tree mean height with about 0.6m. For more accurate derivation of diverse forest information, we should select and integrate the complimentary methods appropriate to the tree types and estimation parameters.

    MCDM Approach for Flood Vulnerability Assessment using TOPSIS Method with α Cut Level Sets (α-cut Fuzzy TOPSIS 기법을 적용한 다기준 홍수취약성 평가)

    • Lee, Gyumin;Chung, Eun-Sung;Jun, Kyung Soo
      • Journal of Korea Water Resources Association
      • /
      • v.46 no.10
      • /
      • pp.977-987
      • /
      • 2013
    • This study aims to develop a multiple criteria decision making (MCDM) approach for flood vulnerability assessment which considers uncertainty. The flood vulnerability assessment procedure consists of three steps: (1) use the Delphi process to determine the criteria and their corresponding weights-the adopted criteria represent the social, economic, and environmental circumstances related to floods, (2) construct a fuzzy data matrix for the flood vulnerability criteria using fuzzification and standardization, and (3) set priorities based on the number of assessed vulnerabilities. This study uses a modified fuzzy TOPSIS method based on ${\alpha}$-level sets which considers various uncertainties related to weight derivation and crisp data aggregation. Further, Spearman's rank correlation analysis is used to compare the rankings obtained using the proposed method with those obtained using fuzzy TOPSIS with fuzzy data, TOPSIS, and WSM methods with crisp data. The fuzzy TOPSIS method based on ${\alpha}$-cut level sets is found to have a higher correlation rate than the other methods, and thus, it can reduce the difference of the rankings which uses crisp and fuzzy data. Thus, the proposed flood vulnerability assessment method can effectively support flood management policies.

    Derivation of Data Quality Attributes and their Priorities Based on Customer Requirements (고객의 요구사항에 기반한 데이터품질 평가속성 및 우선순위 도출)

    • Jang, Kyoung-Ae;Kim, Ja-Hee;Kim, Woo Je
      • KIPS Transactions on Software and Data Engineering
      • /
      • v.4 no.12
      • /
      • pp.549-560
      • /
      • 2015
    • There is a wide variety of data quality attributes such as the ones proposed by the ISO/IEC organization and also by many other domestic and international institutions. However, it takes considerable time and costs to apply those criteria and guidelines to real environment. Therefore, it needs to define data quality evaluation attributes which are easily applicable and are not influenced by organizational environment limitations. The purpose of this paper is to derive data quality attributes and order of their priorities based on customer requirements for managing the process systematically and evaluating the data quantitatively. This study identifies the customer cognitive constructs of data quality attributes using the RGT(Repertory Grid Technique) based on a Korean quality standard model (DQC-M). Also the correlation analysis on the identified constructs is conducted, and the evaluation attributes is prioritized and ranked using the AHP. As the results of this paper, the consistent system, the accurate data, the efficient environment, the flexible management, and the continuous improvement are derived at the first level of the data quality evaluation attributes. Also, Control Compliance(13%), Regulatory Compliance(10%), Requirement Completeness(9.6%), Accuracy(8.4%), and Traceability(6.8%) are ranked on the top 5 of the 19 attributes in the second level.

    Fault rupture directivity of Odaesan Earthquake (M=4.8, '07. 1. 20) (오대산지진(M=4.8, '07. 1. 20)의 단층파열방향성)

    • Yun, Kwan-Hee
      • Geophysics and Geophysical Exploration
      • /
      • v.11 no.2
      • /
      • pp.137-147
      • /
      • 2008
    • Fault rupture directivity of the Odaesan earthquake, which was inferred to be the main cause of the high PGAvalue (> 0.1 g) unusually observed at the near-source region, was analyzed by using the data from the nearby (R < 100 km) dense seismic stations. The Boatwright's method (2007) was adopted for this purpose in which the azimuth and takeoff angle of the unilateral rupture directivity function could be estimated based on the relative peak ground-motions of seismic stations resulting from the nature of the rupture directivity. In this study, the approximate values of the relative peak ground-motions was derived from the difference between the log residuals of the point-source spectral model (Boore, 2003) for the main and secondary events based on the Random Vibration Theory. In this derivation, the spectral difference for a frequency range between the source corner frequencies of main and secondary events was considered to reflect only the effect of the fault directivity. The inversion result of the model parameters for the fault directivity function showed that the fault-plane of NWW-SEE direction dipping steeply to the North with high rupture velocity near upward in SE direction is responsible for the observed high level of ground-motion at the near-source region.

    K-Ar Age of the flutonic Rock fragments Discovered from the Deception Island and Its Geologic Implication (디셉션 섬에서 발견된 심성암편의 K-Ar 연령과 지질학적 의미)

    • Park, Joo-Un;Park, Kye-Hun;Lee, Jong-Ik;Park, Byong-Kwon
      • The Journal of the Petrological Society of Korea
      • /
      • v.17 no.1
      • /
      • pp.36-43
      • /
      • 2008
    • Many plutonic rock fragments of granitic composition were collected from the Deception Island. We obtained K-Ar ages of $62.5{\pm}1.2\;Ma$ and $140.7{\pm}2.7\;Ma$ from the two samples. Such result contradicts the general belief that most of the volcanic rocks of Deception Island are products of very recent activities and their maximum age does not exceed 200 ka. On the other hand, Mesozoic to Cenozoic rocks produced by subduction-related active magmatism have been reported from both South Shetland Islands and Antarctic Peninsula, located to the north and south of the Deception Island respectively. Also, various kinds of plutonic rocks with granitic composition are distributed widely. Therefore, plutonic rock fragments with granitic composition discovered from the Deception Island seem to indicate their derivation by capturing granitic crustal material underlying volcanic edifice during the volcanic activities, instead of differentiation from magmas related with recent volcanism. Ages and rock types of the plutonic rock fragments suggest arc-related origin just as adjacent South Shetland Islands and Antarctic Peninasula.


    (34141) Korea Institute of Science and Technology Information, 245, Daehak-ro, Yuseong-gu, Daejeon
    Copyright (C) KISTI. All Rights Reserved.